Open Access

Efficient Procedure to Scheduling Construction Projects at the Planning Phase


Cite

Chelaka, M., Abeyasinghe, L., Greenwood, D. J., Johansen, D. E. (2001). An efficient method for scheduling construction projects with resource constraints. Int. J. Proj. Manag., 19(1), 29–45. https://doi.org/10.1016/S0263-7863(00)00024-710.1016/S0263-7863(00)00024-7Open DOISearch in Google Scholar

Ayalew, T., Dakhli, Z., Lafhaj, Z. (2016). Assessment on Performance and Challenges of Ethiopian Construction Industry. Journal of Architecture and Civil Engineering, 2, 1–11.Search in Google Scholar

Bacon, R. W., Besant-Jones, J. E. (1998). Estimating construction costs and schedules: experience with power generation projects in developing countries. Energy Policy, 26(4), 317–333. https://doi.org/10.1016/S0301-4215(97)00164-X10.1016/S0301-4215(97)00164-XOpen DOISearch in Google Scholar

Cajzek, R., Klanšek, U. (2016). Mixed-integer nonlinear programming based optimal time scheduling of construction projects under nonconvex costs. Technical Gazette, 23(1), 9–18.10.17559/TV-20140108112928Search in Google Scholar

Christodoulou, S. E., Tezias, E. S., Galaras, K. A. (2012). Resource-constrained scheduling of construction projects and simulation of the entropy impact on a project’s duration and cost. International Journal of Project Organisation and Management, 4(4), 322–338. https://doi.org/10.1504/IJPOM.2012.05032810.1504/IJPOM.2012.050328Search in Google Scholar

Del Pico, Wayne, J. (2013). Project control: integrating cost and schedule in construction. Hoboken, New Jersey: John Wiley & Sons, Inc. https://doi.org/10.1002/978111880271710.1002/9781118802717Open DOISearch in Google Scholar

EEA. (2008). The Current State of the Construction Industry. Addis Ababa, Ethiopia.Search in Google Scholar

PPA. (2010). Federal Public Procurement Directive, June 2010, Ethiopia. Retrieved from http://www.ppa.gov.et/index.php?option=com_joomdoc&task=document.download&path=legislation%2Fdirectives%2Fprocurement%2Fpublic-procurement-directive-englishpdfSearch in Google Scholar

Franck, B., Neumann, K., Schwindt, C. (2001). Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling. OR–Spektrum 23(3), 297–324. https://doi.org/10.1007/PL0001335610.1007/PL00013356Open DOISearch in Google Scholar

Gebrehiwet, T., Luo, H. (2017). Analysis of Delay Impact on Construction Project Based on RII and Correlation Coefficient: Empirical Study. Procedia Eng. 196, 366–74. https://doi.org/10.1016/j.proeng.2017.07.21210.1016/j.proeng.2017.07.212Open DOISearch in Google Scholar

Heinz, S., Beck, J. C. (2011). Solving resource allocation/scheduling problems with constraint integer programming. Association for the Advancement of Artificial Intelligence. Retrieved from https://tidel.mie.utoronto.ca/pubs/cip-coplas11.pdfSearch in Google Scholar

Ibrahim, M., Amund, B., Nabil, D. (2012). Causes of Delay in Road Construction Projects. Journal of Management in Engineering (ASCE), 28(3), 300–310.10.1061/(ASCE)ME.1943-5479.0000096Search in Google Scholar

Liu, S.-S., Wang, C.-J. (2008). Resource-constrained construction project scheduling model for profit maximization considering cash flow. Automation in Construction, 17(8), 966–974.10.1016/j.autcon.2008.04.006Search in Google Scholar

Ma, G., Wang, A., Li, N., Gu, L., Ai, Q. (2014). Improved Critical Chain Project Management Framework for Scheduling Construction Projects. Journal of Construction Engineering and Management, 140(12). https://doi.org/10.1061/(ASCE)CO.1943-7862.000090810.1061/(ASCE)CO.1943-7862.0000908Open DOISearch in Google Scholar

McTague, B. (2002). Productivity improvements on Alberta major construction projects: Phase I - Back to Basics. Alberta Economic Development.Search in Google Scholar

MoUD. (2013). Ministry of Urban Development and Construction. Directives for the Registration of Construction Professionals and Contractors, April 2013, Addis Ababa. Retrieved from https://www.ethioconstruction.net/sites/default/files/Law/Files/Directives%20for%20Ethiopian%20Contractors%20Registration.docSearch in Google Scholar

MoWUD. (1995). General Conditions of Contract, Ethiopia. Retrieved from https://www.ethioconstruction.net/sites/default/files/Law/Files/General%20Conditions%20of%20Contract%2C%20MoWUD.pdfSearch in Google Scholar

Wubishet, J. (2004). Performances for public construction projects in developing countries: federal road & educational building projects in Ethiopia. Trondheim: Norwegian University of Science and Technology, Faculty of Social Sciences and Technology Management, Department of Industrial Economics and Technology Management.Search in Google Scholar