Integration of Solar Photovoltaic Power Plants Into the Power Transmission System of Bosnia and Herzegovina Load and Voltage Conditions Analysis
Publié en ligne: 17 nov. 2023
Pages: 18 - 23
Reçu: 04 août 2023
Accepté: 24 oct. 2023
DOI: https://doi.org/10.2478/bhee-2023-0008
Mots clés
© 2023 Saša Đekić, published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.
Governments in the region are actively trying to decentralize production in the energy sector by encouraging the construction of power plants using renewable energy resources. The Network Code [