Acceso abierto

Risk management analysis in construction enterprises in selected regions in Poland


Cite

Babar, S., Thaheem, J.M., Ayub, B. (2017). Estimated cost at completion: Integrating risk into earned value management. Journal of Construction Engineering and Management, 143(3). https://doi.org/10.1061/(ASCE)CO.1943-7862.000124510.1061/(ASCE)CO.1943-7862.0001245Search in Google Scholar

Bizon-Górecka, J. (1999). Problemy zarządzania ryzykiem w produkcji budowlanej (komunikat z badań). Organizacja i Kierowanie, 1, 49–54.Search in Google Scholar

Bizon-Górecka, J., Górecki, J. (2013). Ryzyko budowlanego projektu inwestycyjnego w perspektywie kosztów budowy. Przegląd Organizacji, 6, 36–44.10.33141/po.2013.06.07Search in Google Scholar

Boothroyd, C., Emmett, J. (1996). Risk Management: A practical guide for construction professionals. London: Witherby & Co.Search in Google Scholar

Bunni, G.N. (2003). Risk and insurance in construction. London – New York: Spon Press.10.4324/9780203476543Search in Google Scholar

Burtonshaw-Gunn, S.A. (2009). Risk and financial management in construction. Farnham: Gower Publishing.Search in Google Scholar

Cristóbal, C.R.J. (2009). Time, cost, and quality in a road building project. Journal of Construction Engineering and Management, 135(11), 1271–1274.10.1061/(ASCE)CO.1943-7862.0000094Search in Google Scholar

Dziadosz, A., Kapliński, O., Tomczyk, A., Rejment, M. (2016). Analiza i ocena ryzyka finansowego w przedsięwzięciach budowlanych. Materiały Budowlane, 8, 112–113.10.15199/33.2016.08.34Search in Google Scholar

Dziadosz, A., Rejment, M. (2015). Risk analysis in construction project – chosen methods. Procedia Engineering, 122, 258–265.10.1016/j.proeng.2015.10.034Search in Google Scholar

Flanagan, R., Norman, G. (1993). Risk management in construction. Oxford: Blackwell Publishing.Search in Google Scholar

Glavinich, E.T. (2008). Contractor’s Guide to Greek Building Construction: Management, Project delivery, documentation and risk reduction. Hoboken: John Wiley & Sons.10.1002/9780470259979Search in Google Scholar

Hatem, J.D. (1998). Subsurface conditions: Risk Management for Design and Construction Management Professionals. New York: John Wiley & Sons.Search in Google Scholar

Hickman, R.A. (2002). Design-Build Risk and Insurance. Dallas: International Risk Management Institute.Search in Google Scholar

Holland, K.J. (2006). Construction Law & Risk Management. Vienna: Ardent Publications.Search in Google Scholar

Hyari, H.K., Shatarat, N., Khalafallah, A. (2017). Handling Risks of Quality Variations in Unit-Price Contracts. Journal of Construction Engineering and Management, 143(10). https://doi.org./10.1061/(ASCE)CO.1943-7862.000139310.1061/(ASCE)CO.1943-7862.0001393Search in Google Scholar

Kaczorek, K. (2017). An overview of selected methods for the identification and qualitative assessment of risk factors. Czasopismo Techniczne, 10, 103–111.Search in Google Scholar

Kasprowicz, T. (2017). Quantitative identification of construction risk. Archive of Civil Engineering, LXIII(1), 63–72.10.1515/ace-2017-0005Search in Google Scholar

Kosecki, A., Madyda, A. (1996). Kierowanie ryzykiem w przedsiębiorstwie budowlanym. In Technologia w budownictwie – teoria i praktyka (pp. 76–84). Wrocław: Instytut Budownictwa Politechniki Wrocławskiej, Towarzystwo Naukowe Inżynierii Procesów Budowlanych.Search in Google Scholar

Kosmalski, S., Myrczek, J. (2019). Risk factors in a process of gas pipeline construction. In MATEC Web of Conferences (pp. 1–8). Paris.10.1051/matecconf/201926207006Search in Google Scholar

Kowalczyk, Z. (2001). Podział i przenoszenie ryzyka w umowach budowlanych. Inżynieria i Budownictwo, 6, 360–361.Search in Google Scholar

Liu, J., Low, P.S., Zhang, Q. (2017). Enterprise risk management practices of top ENR international contractors. International Journal of Construction Management, 22(3). https://doi.org/10.1080/15623599.2017.132629910.1080/15623599.2017.1326299Search in Google Scholar

Marcinkowski, R., Koper, A. (2008). Ocena ryzyka czasu i kosztów w planowaniu produkcji budowlanej. Przegląd Budowlany, 7–8, 70–75.Search in Google Scholar

Meouche, E.R., Abunemeh, M., Hijaze, I., Mebaraki, A. (2018). Developing optimal paths for evacuating risky construction sites. Journal of Construction Engineering and Management, 144(2). https://doi/org/10.1061/(ASCE) CO.1943-7862.000141310.1061/(ASCE)CO.1943-7862.0001413Search in Google Scholar

Мirković, M. (2016). Optimizacija Raspoloživosti Sistema za Proizvodnju i Ugradjivanje Bitumenom Vezanih Materijala, Doctoral Dissertation. Belgrade: Faculty of Civil Engineering, University in Belgrade. Retrieved from https://uvidok.rcub.bg.ac.rs/handle/123456789/1014 (date of access: 5.11.2019).Search in Google Scholar

Мirković, M. (2018). The impact of failure types in construction production systems on economic risk assessments in the bidding phase. Complexity Journal, ID 5041803, 1–13. https://doi/org/10.1155/2018/5041803Search in Google Scholar

Myrczek, J., Sadlik-Lenczewska, M., Tworek, P. (2015). Wybrane problemy zarządzania ryzykiem w działalności przedsiębiorstw budowlanych. In Zarządzanie (pp. 127–136). Częstochowa: Politechnika Częstochowska.Search in Google Scholar

Myrczek, J., Tworek, P. (2019). Excerpts from the research on risk management in Polish construction enterprises. In MATEC Web of Conferences (pp. 1–8). Paris.10.1051/matecconf/201926207009Search in Google Scholar

Nguyen, A.D., Garvin, J.M., Gonzalez, E.E. (2018). Risk allocation in U.S. public-private partnership highway project contracts. Journal of Construction Engineering and Management, 144(5). https://doi/org/10.1061/(ASCE) CO.1943-7862.0001465Search in Google Scholar

Ogwueleka, Ch.A., Udoudoh, P.F. (2018). The impact of risk and reward dynamics in incentive compensation plans in the Nigerian construction industry. International Journal of Construction Management, 18(3), 247–259.10.1080/15623599.2017.1315545Search in Google Scholar

Palmer, J.W., Maloney, J.M., Heffron, L.J. (1996). Construction insurance, bonding, and risk management. New York: McGraw-Hill.Search in Google Scholar

Sawczuk, B. (2004). Risk avoidance for the building team. London: E & FN Spon.Search in Google Scholar

Sekunda, R., Marcinkowski, R. (2016). Ryzyko w planowaniu działań inżynieryjnobudowlanych realizowanych przez jednostki zhierarchizowane. Przegląd Budowlany, 10, 43–49.Search in Google Scholar

Shoe, S., Leite, F. (2017). Assessing safety risk among different construction traders: Quantitative approach. Journal of Construction Engineering and Management, 143(5). https://doi/org/10.1061/(ASCE)CO.1943-7862.0001237Search in Google Scholar

Skorupka, D. (2007). Metoda identyfikacji i oceny ryzyka realizacji przedsięwzięć budowlanych. Warszawa: Wojskowa Akademia Techniczna.Search in Google Scholar

Skorupka, D. (2009). Method of planning construction projects, taking into account risk factors. Badania Operacyjne i Decyzje, 3, 119–128.Search in Google Scholar

Smith, N.J., Merna, T., Jobling, P. (2006). Managing risk in construction projects. Oxford: Blackwell Publishing.Search in Google Scholar

Sullivan, J., Asmar, E.M., Chalhoub, J., Obeid, H. (2017). Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality. Journal of Construction Engineering and Management, 143(6). https://doi/org/10.1061/(ASCE)CO.1943-7862.000128210.1061/(ASCE)CO.1943-7862.0001282Search in Google Scholar

Tah, J.H.M., Carr, V. (2000). A proposal for construction project risk assessment using fuzzy logic. Construction Management and Economics, 18(4), 491–500.10.1080/01446190050024905Search in Google Scholar

Tempo-Silungwe, K.Ch., Khatleli, N. (2018). Identification of enablers and constraints of risk allocation using structuration theory in the construction industry. Journal of Construction Engineering and Management, 144(5). https://doi/org/10.1061/(ASCE)CO.1943-7862.000147110.1061/(ASCE)CO.1943-7862.0001471Search in Google Scholar

Turskis, Z., Gajzler, M., Dziadosz, A. (2012). Reliability, risk management, and contingency of construction processes and projects. Journal of Civil Engineering and Management, 18(2), 290–298.10.3846/13923730.2012.672931Search in Google Scholar

Tworek, P. (2013). Reakcja na ryzyko w działalności przedsiębiorstwa budowlanomontażowego. Warszawa: Difin.Search in Google Scholar

Tworek, P., Myrczek, J. (2017). Identifying and managing construction risks in the public sector. In J. Nesleha, T. Plihal, K. Urbanovsky (Eds.), Proceedings of the 14thInternational Scientific Conference (pp. 422–429). Brno: Masaryk University.Search in Google Scholar

Tworek, P., Myrczek, J. (2015). Methodical problems of response to the risks in investment and construction processes: a case of Polish largest developers (survey research). In M. Čulik (Ed.) Proceedings from 10thInternational Conference (pp. 1348–1355). Ostrava: VŠB – Technická Univerzita Ostrava.Search in Google Scholar

Weatherhead, M., Owen, K., Hall, C. (2005). Integrating value and risk in construction. London: Construction Industry Research and Information Association.Search in Google Scholar

Zavadskas, K.E, Turskis, Z., Tamošaitien, J. (2010). Risk Assessment in construction projects. Journal of Civil Engineering and Management, 16(1), 33–46.10.3846/jcem.2010.03Search in Google Scholar

Zhao, X., Hwang, B.G., Low, P.S. (2015). Enterprise risk management in international construction firms: drivers and hindrances. Engineering, Construction and Architectural Management, 22(3), 347–366.10.1108/ECAM-09-2014-0117Search in Google Scholar