[Babar, S., Thaheem, J.M., Ayub, B. (2017). Estimated cost at completion: Integrating risk into earned value management. Journal of Construction Engineering and Management, 143(3). https://doi.org/10.1061/(ASCE)CO.1943-7862.000124510.1061/(ASCE)CO.1943-7862.0001245]Search in Google Scholar
[Bizon-Górecka, J. (1999). Problemy zarządzania ryzykiem w produkcji budowlanej (komunikat z badań). Organizacja i Kierowanie, 1, 49–54.]Search in Google Scholar
[Bizon-Górecka, J., Górecki, J. (2013). Ryzyko budowlanego projektu inwestycyjnego w perspektywie kosztów budowy. Przegląd Organizacji, 6, 36–44.10.33141/po.2013.06.07]Search in Google Scholar
[Boothroyd, C., Emmett, J. (1996). Risk Management: A practical guide for construction professionals. London: Witherby & Co.]Search in Google Scholar
[Bunni, G.N. (2003). Risk and insurance in construction. London – New York: Spon Press.10.4324/9780203476543]Search in Google Scholar
[Burtonshaw-Gunn, S.A. (2009). Risk and financial management in construction. Farnham: Gower Publishing.]Search in Google Scholar
[Cristóbal, C.R.J. (2009). Time, cost, and quality in a road building project. Journal of Construction Engineering and Management, 135(11), 1271–1274.10.1061/(ASCE)CO.1943-7862.0000094]Search in Google Scholar
[Dziadosz, A., Kapliński, O., Tomczyk, A., Rejment, M. (2016). Analiza i ocena ryzyka finansowego w przedsięwzięciach budowlanych. Materiały Budowlane, 8, 112–113.10.15199/33.2016.08.34]Search in Google Scholar
[Dziadosz, A., Rejment, M. (2015). Risk analysis in construction project – chosen methods. Procedia Engineering, 122, 258–265.10.1016/j.proeng.2015.10.034]Search in Google Scholar
[Flanagan, R., Norman, G. (1993). Risk management in construction. Oxford: Blackwell Publishing.]Search in Google Scholar
[Glavinich, E.T. (2008). Contractor’s Guide to Greek Building Construction: Management, Project delivery, documentation and risk reduction. Hoboken: John Wiley & Sons.10.1002/9780470259979]Search in Google Scholar
[Hatem, J.D. (1998). Subsurface conditions: Risk Management for Design and Construction Management Professionals. New York: John Wiley & Sons.]Search in Google Scholar
[Hickman, R.A. (2002). Design-Build Risk and Insurance. Dallas: International Risk Management Institute.]Search in Google Scholar
[Holland, K.J. (2006). Construction Law & Risk Management. Vienna: Ardent Publications.]Search in Google Scholar
[Hyari, H.K., Shatarat, N., Khalafallah, A. (2017). Handling Risks of Quality Variations in Unit-Price Contracts. Journal of Construction Engineering and Management, 143(10). https://doi.org./10.1061/(ASCE)CO.1943-7862.000139310.1061/(ASCE)CO.1943-7862.0001393]Search in Google Scholar
[Kaczorek, K. (2017). An overview of selected methods for the identification and qualitative assessment of risk factors. Czasopismo Techniczne, 10, 103–111.]Search in Google Scholar
[Kasprowicz, T. (2017). Quantitative identification of construction risk. Archive of Civil Engineering, LXIII(1), 63–72.10.1515/ace-2017-0005]Search in Google Scholar
[Kosecki, A., Madyda, A. (1996). Kierowanie ryzykiem w przedsiębiorstwie budowlanym. In Technologia w budownictwie – teoria i praktyka (pp. 76–84). Wrocław: Instytut Budownictwa Politechniki Wrocławskiej, Towarzystwo Naukowe Inżynierii Procesów Budowlanych.]Search in Google Scholar
[Kosmalski, S., Myrczek, J. (2019). Risk factors in a process of gas pipeline construction. In MATEC Web of Conferences (pp. 1–8). Paris.10.1051/matecconf/201926207006]Search in Google Scholar
[Kowalczyk, Z. (2001). Podział i przenoszenie ryzyka w umowach budowlanych. Inżynieria i Budownictwo, 6, 360–361.]Search in Google Scholar
[Liu, J., Low, P.S., Zhang, Q. (2017). Enterprise risk management practices of top ENR international contractors. International Journal of Construction Management, 22(3). https://doi.org/10.1080/15623599.2017.132629910.1080/15623599.2017.1326299]Search in Google Scholar
[Marcinkowski, R., Koper, A. (2008). Ocena ryzyka czasu i kosztów w planowaniu produkcji budowlanej. Przegląd Budowlany, 7–8, 70–75.]Search in Google Scholar
[Meouche, E.R., Abunemeh, M., Hijaze, I., Mebaraki, A. (2018). Developing optimal paths for evacuating risky construction sites. Journal of Construction Engineering and Management, 144(2). https://doi/org/10.1061/(ASCE) CO.1943-7862.000141310.1061/(ASCE)CO.1943-7862.0001413]Search in Google Scholar
[Мirković, M. (2016). Optimizacija Raspoloživosti Sistema za Proizvodnju i Ugradjivanje Bitumenom Vezanih Materijala, Doctoral Dissertation. Belgrade: Faculty of Civil Engineering, University in Belgrade. Retrieved from https://uvidok.rcub.bg.ac.rs/handle/123456789/1014 (date of access: 5.11.2019).]Search in Google Scholar
[Мirković, M. (2018). The impact of failure types in construction production systems on economic risk assessments in the bidding phase. Complexity Journal, ID 5041803, 1–13. https://doi/org/10.1155/2018/5041803]Search in Google Scholar
[Myrczek, J., Sadlik-Lenczewska, M., Tworek, P. (2015). Wybrane problemy zarządzania ryzykiem w działalności przedsiębiorstw budowlanych. In Zarządzanie (pp. 127–136). Częstochowa: Politechnika Częstochowska.]Search in Google Scholar
[Myrczek, J., Tworek, P. (2019). Excerpts from the research on risk management in Polish construction enterprises. In MATEC Web of Conferences (pp. 1–8). Paris.10.1051/matecconf/201926207009]Search in Google Scholar
[Nguyen, A.D., Garvin, J.M., Gonzalez, E.E. (2018). Risk allocation in U.S. public-private partnership highway project contracts. Journal of Construction Engineering and Management, 144(5). https://doi/org/10.1061/(ASCE) CO.1943-7862.0001465]Search in Google Scholar
[Ogwueleka, Ch.A., Udoudoh, P.F. (2018). The impact of risk and reward dynamics in incentive compensation plans in the Nigerian construction industry. International Journal of Construction Management, 18(3), 247–259.10.1080/15623599.2017.1315545]Search in Google Scholar
[Palmer, J.W., Maloney, J.M., Heffron, L.J. (1996). Construction insurance, bonding, and risk management. New York: McGraw-Hill.]Search in Google Scholar
[Sawczuk, B. (2004). Risk avoidance for the building team. London: E & FN Spon.]Search in Google Scholar
[Sekunda, R., Marcinkowski, R. (2016). Ryzyko w planowaniu działań inżynieryjnobudowlanych realizowanych przez jednostki zhierarchizowane. Przegląd Budowlany, 10, 43–49.]Search in Google Scholar
[Shoe, S., Leite, F. (2017). Assessing safety risk among different construction traders: Quantitative approach. Journal of Construction Engineering and Management, 143(5). https://doi/org/10.1061/(ASCE)CO.1943-7862.0001237]Search in Google Scholar
[Skorupka, D. (2007). Metoda identyfikacji i oceny ryzyka realizacji przedsięwzięć budowlanych. Warszawa: Wojskowa Akademia Techniczna.]Search in Google Scholar
[Skorupka, D. (2009). Method of planning construction projects, taking into account risk factors. Badania Operacyjne i Decyzje, 3, 119–128.]Search in Google Scholar
[Smith, N.J., Merna, T., Jobling, P. (2006). Managing risk in construction projects. Oxford: Blackwell Publishing.]Search in Google Scholar
[Sullivan, J., Asmar, E.M., Chalhoub, J., Obeid, H. (2017). Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality. Journal of Construction Engineering and Management, 143(6). https://doi/org/10.1061/(ASCE)CO.1943-7862.000128210.1061/(ASCE)CO.1943-7862.0001282]Search in Google Scholar
[Tah, J.H.M., Carr, V. (2000). A proposal for construction project risk assessment using fuzzy logic. Construction Management and Economics, 18(4), 491–500.10.1080/01446190050024905]Search in Google Scholar
[Tempo-Silungwe, K.Ch., Khatleli, N. (2018). Identification of enablers and constraints of risk allocation using structuration theory in the construction industry. Journal of Construction Engineering and Management, 144(5). https://doi/org/10.1061/(ASCE)CO.1943-7862.000147110.1061/(ASCE)CO.1943-7862.0001471]Search in Google Scholar
[Turskis, Z., Gajzler, M., Dziadosz, A. (2012). Reliability, risk management, and contingency of construction processes and projects. Journal of Civil Engineering and Management, 18(2), 290–298.10.3846/13923730.2012.672931]Search in Google Scholar
[Tworek, P. (2013). Reakcja na ryzyko w działalności przedsiębiorstwa budowlanomontażowego. Warszawa: Difin.]Search in Google Scholar
[Tworek, P., Myrczek, J. (2017). Identifying and managing construction risks in the public sector. In J. Nesleha, T. Plihal, K. Urbanovsky (Eds.), Proceedings of the 14thInternational Scientific Conference (pp. 422–429). Brno: Masaryk University.]Search in Google Scholar
[Tworek, P., Myrczek, J. (2015). Methodical problems of response to the risks in investment and construction processes: a case of Polish largest developers (survey research). In M. Čulik (Ed.) Proceedings from 10thInternational Conference (pp. 1348–1355). Ostrava: VŠB – Technická Univerzita Ostrava.]Search in Google Scholar
[Weatherhead, M., Owen, K., Hall, C. (2005). Integrating value and risk in construction. London: Construction Industry Research and Information Association.]Search in Google Scholar
[Zavadskas, K.E, Turskis, Z., Tamošaitien, J. (2010). Risk Assessment in construction projects. Journal of Civil Engineering and Management, 16(1), 33–46.10.3846/jcem.2010.03]Search in Google Scholar
[Zhao, X., Hwang, B.G., Low, P.S. (2015). Enterprise risk management in international construction firms: drivers and hindrances. Engineering, Construction and Architectural Management, 22(3), 347–366.10.1108/ECAM-09-2014-0117]Search in Google Scholar