Baek, M., & Ashuri, B. (2018). Statistical modeling of number of bidders in highway resurfacing and widening construction projects. In: Construction Research Congress 2018. American Society of Civil Engineers, Reston, VA, pp. 670–679. doi: 10.1061/9780784481295.067.BaekM.AshuriB.2018Statistical modeling of number of bidders in highway resurfacing and widening construction projectsIn:Construction Research Congress 2018American Society of Civil Engineers, Reston, VA67067910.1061/9780784481295.067Open DOISearch in Google Scholar

Baek, M., & Ashuri, B. (2019). Analysis of the variability of submitted unit price bids for asphalt line items in highway projects. Journal of Construction Engineering and Management, 145(4), p. 04019020. doi: 10.1061/(ASCE)CO.1943-7862.0001638.BaekM.AshuriB.2019Analysis of the variability of submitted unit price bids for asphalt line items in highway projectsJournal of Construction Engineering and Management14540401902010.1061/(ASCE)CO.1943-7862.0001638Open DOISearch in Google Scholar

Bedeian, A. G., & Mossholder, K. W. (2000). On the use of the coefficient of variation as a measure of diversity. Organizational Research Methods, 3(3), pp. 285–297. doi: 10.1177/109442810033005.BedeianA. G.MossholderK. W.2000On the use of the coefficient of variation as a measure of diversityOrganizational Research Methods3328529710.1177/109442810033005Open DOISearch in Google Scholar

Brief, R. P., & Owen, J. (1969). A note on earnings risk and the coefficient of variation. The Journal of Finance, 24(5), p. 901. doi: 10.2307/2325684.BriefR. P.OwenJ.1969A note on earnings risk and the coefficient of variationThe Journal of Finance24590110.2307/2325684Open DOISearch in Google Scholar

Carr, P. G. (2005). Investigation of bid price competition measured through prebid project estimates, actual bid prices, and number of bidders. Journal of Construction Engineering and Management, 131(11), pp. 1165–1172. doi: 10.1061/(ASCE)0733-9364(2005)131:11(1165).CarrP. G.2005Investigation of bid price competition measured through prebid project estimates, actual bid prices, and number of biddersJournal of Construction Engineering and Management131111165117210.1061/(ASCE)0733-9364(2005)131:11(1165)Open DOISearch in Google Scholar

Chang, W.-S., Chen, B., & Salmon, T. C. (2014). An investigation of the average bid mechanism for procurement auctions. Management Science, 61(6), pp. 1237–1254. doi: 10.1287/mnsc.2013.1893.ChangW.-S.ChenB.SalmonT. C.2014An investigation of the average bid mechanism for procurement auctionsManagement Science6161237125410.1287/mnsc.2013.1893Open DOISearch in Google Scholar

Curto, J. D., & Pinto, J. C. (2009). The coefficient of variation asymptotic distribution in the case of non-iid random variables. Journal of Applied Statistics, 36(1), pp. 21–32. doi: 10.1080/02664760802382491.CurtoJ. D.PintoJ. C.2009The coefficient of variation asymptotic distribution in the case of non-iid random variablesJournal of Applied Statistics361213210.1080/02664760802382491Open DOISearch in Google Scholar

Delacre, M., Lakens, D., & Leys, C. (2017). Why psychologists should by default use welch's t-test instead of student's t-test. International Review of Social Psychology, 30(1), p. 92. doi: 10.5334/irsp.82.DelacreM.LakensD.LeysC.2017Why psychologists should by default use welch's t-test instead of student's t-testInternational Review of Social Psychology3019210.5334/irsp.82Open DOISearch in Google Scholar

Galton, F. (1907). Vox Populi (The Wisdom of Crowds). Nature, 75(1949), pp. 450–451. doi: 10.1038/075450a0.GaltonF.1907Vox Populi(The Wisdom of Crowds).Nature75(1949),45045110.1038/075450a0Open DOISearch in Google Scholar

Gunther, J. W., & Robinson, K. J. (1999). Industry mix and lending environment variability: What does the average bank face? Economic and Financial Review-Federal Reserve Bank of Dallas, 1999(2), pp. 24–31.GuntherJ. W.RobinsonK. J.1999Industry mix and lending environment variability: What does the average bank face?Economic and Financial Review-Federal Reserve Bank of Dallas199922431Search in Google Scholar

Kuprenas, J. A. (2005). Construction project cost performance prediction based on project bid characteristics. Construction Research Congress, 2005(213), pp. 1–9. doi: 10.1061/40754(183)94.KuprenasJ. A.2005Construction project cost performance prediction based on project bid characteristicsConstruction Research Congress20052131910.1061/40754(183)94Open DOISearch in Google Scholar

Laryea, S., & Hughes, W. (2011). Risk and price in the bidding process of contractors. Journal of Construction Engineering and Management, 137(4), pp. 248–258. doi: 10.1061/(ASCE)CO.1943-7862.0000293.LaryeaS.HughesW.2011Risk and price in the bidding process of contractorsJournal of Construction Engineering and Management137424825810.1061/(ASCE)CO.1943-7862.0000293Open DOISearch in Google Scholar

Li, S., Foulger, J. R., & Philips, P. W. (2008). Analysis of the impacts of the number of bidders upon bid values. Public Works Management & Policy, 12(3), pp. 503–514. doi: 10.1177/1087724X07312144.LiS.FoulgerJ. R.PhilipsP. W.2008Analysis of the impacts of the number of bidders upon bid valuesPublic Works Management & Policy12350351410.1177/1087724X07312144Open DOISearch in Google Scholar

Mannes, A. E., Larrick, R. P., & Soll, J. B. (2012). The social psychology of the wisdom of crowds. In: Social Judgment and Decision Making. Psychology Press (Frontiers of social psychology.), New York, NY, US, pp. 227–242. Available at https://faculty.fuqua.duke.edu/~jsoll/Larrick Mannes Soll WOC chapter Final.pdf.MannesA. E.LarrickR. P.SollJ. B.2012The social psychology of the wisdom of crowdsIn:Social Judgment and Decision MakingPsychology Press (Frontiers of social psychology.)New York, NY, US227242Available at https://faculty.fuqua.duke.edu/~jsoll/Larrick Mannes Soll WOC chapter Final.pdf.Search in Google Scholar

Martin, J. D., & Gray, L. N. (1971). Measurement of relative variation: sociological examples. American Sociological Review, 36(3), p. 496. doi: 10.2307/2093089.MartinJ. D.GrayL. N.1971Measurement of relative variation: sociological examplesAmerican Sociological Review36349610.2307/2093089Open DOISearch in Google Scholar

Minchin, R. E., Thurn, S. B., Ellis, R. D., Jr., & Lewis, D. W. (2013). Using contractor bid amounts to estimate the impact of night construction on cost for transportation construction. Journal of Construction Engineering and Management, 139(8), pp. 1055–1062. doi: 10.1061/(asce)co.1943-7862.0000688.MinchinR. E.ThurnS. B.EllisR. D.Jr.LewisD. W.2013Using contractor bid amounts to estimate the impact of night construction on cost for transportation constructionJournal of Construction Engineering and Management13981055106210.1061/(asce)co.1943-7862.0000688Open DOISearch in Google Scholar

Minitab. (2015). What Is the Significance Level (Alpha)?, The Minitab Blog. Available at https://blog.minitab.com/blog/adventures-in-statistics-2/understanding-hypothesis-tests-significance-levels-alpha-and-p-values-in-statistics on 20 January 2020.Minitab2015What Is the Significance Level (Alpha)?, The Minitab BlogAvailable at https://blog.minitab.com/blog/adventures-in-statistics-2/understanding-hypothesis-tests-significance-levels-alpha-and-p-values-in-statistics on 20 January 2020.Search in Google Scholar

Ohio Department of Transportation. (no date a). Construction Management Reporting System. Available at http://www.odotonline.org/cmsportal/default.asp on 31 July 2019.Ohio Department of Transportation(no date a).Construction Management Reporting SystemAvailable at http://www.odotonline.org/cmsportal/default.asp on 31 July 2019.Search in Google Scholar

Ohio Department of Transportation. (no date b). Historical Cost Data. Available at http://www.dot.state.oh.us/Divisions/ConstructionMgt/Estimating/Pages/Bid_Histories.aspx on 31 July 2019.Ohio Department of Transportation(no date b).Historical Cost DataAvailable at http://www.dot.state.oh.us/Divisions/ConstructionMgt/Estimating/Pages/Bid_Histories.aspx on 31 July 2019.Search in Google Scholar

Ruxton, G. D. (2006). The unequal variance t-test is an underused alternative to Student's t-test and the Mann–Whitney U test. Behavioral Ecology, 17(4), pp. 688–690. doi: 10.1093/beheco/ark016.RuxtonG. D.2006The unequal variance t-test is an underused alternative to Student's t-test and the Mann–Whitney U testBehavioral Ecology17468869010.1093/beheco/ark016Open DOISearch in Google Scholar

Salkind, N. (2010). Encyclopedia of Research Design, Encyclopedia of Research Design. SAGE Publications, Inc., Thousand Oaks, CA, United States. doi: 10.4135/9781412961288.SalkindN.2010Encyclopedia of Research Design, Encyclopedia of Research DesignSAGE Publications, Inc.Thousand Oaks, CA, United States10.4135/9781412961288Open DOISearch in Google Scholar

Shrestha, P. P., & Pradhananga, N. (2010). Correlating bid price with the number of bidders and final construction cost of public street projects. Transportation Research Record: Journal of the Transportation Research Board, 2151(1), pp. 3–10. doi: 10.3141/2151-01.ShresthaP. P.PradhanangaN.2010Correlating bid price with the number of bidders and final construction cost of public street projectsTransportation Research Record: Journal of the Transportation Research Board2151131010.3141/2151-01Open DOISearch in Google Scholar

Skitmore, M., Drew, D., & Ngai, S. (2001). Bid-spread. Journal of Construction Engineering and Management, 127(2), pp. 149–153. doi: 10.1061/(ASCE)0733-9364(2001)127:2(149).SkitmoreM.DrewD.NgaiS.2001Bid-spreadJournal of Construction Engineering and Management127214915310.1061/(ASCE)0733-9364(2001)127:2(149)Open DOISearch in Google Scholar

Standaert, F.-X. (2019). How (not) to use Welch's T-test in side-channel security evaluations. pp. 65–79. doi: 10.1007/978-3-030-15462-2_5.StandaertF.-X.2019How (not) to use Welch's T-test in side-channel security evaluations657910.1007/978-3-030-15462-2_5Open DOISearch in Google Scholar

Thiese, M. S., Ronna, B., & Ott, U. (2016). P value interpretations and considerations. Journal of Thoracic Disease, 8(9), pp. E928–E931. doi: 10.21037/jtd.2016.08.16.ThieseM. S.RonnaB.OttU.2016P value interpretations and considerationsJournal of Thoracic Disease89E928E93110.21037/jtd.2016.08.16505927027747028Open DOISearch in Google Scholar

Tumer, K., & Wolpert, D. (2004). A survey of collectives. In: Collectives and the Design of Complex Systems. Springer New York, New York, NY, pp. 1–42. doi: 10.1007/978-1-4419-8909-3_1.TumerK.WolpertD.2004A survey of collectivesIn:Collectives and the Design of Complex SystemsSpringerNew York, New York, NY14210.1007/978-1-4419-8909-3_1Open DOISearch in Google Scholar

Weber, E. U., Shafir, S., & Blais, A. R. (2004). Predicting risk sensitivity in humans and lower animals: risk as variance or coefficient of variation. Psychological Review, 111(2), pp. 430–445. doi: 10.1037/0033-295X.111.2.430.WeberE. U.ShafirS.BlaisA. R.2004Predicting risk sensitivity in humans and lower animals: risk as variance or coefficient of variationPsychological Review111243044510.1037/0033-295X.111.2.430Open DOISearch in Google Scholar

Welch, B. L. (1947). The generalization of Student's problem when several different population variances are involved. Biometrika, 34(1–2), pp. 28–35. doi: 10.1093/biomet/34.1-2.28.WelchB. L.1947The generalization of Student's problem when several different population variances are involvedBiometrika341–2283510.1093/biomet/34.1-2.28Open DOISearch in Google Scholar

Williams, T. P. (2002). Predicting completed project cost using bidding data. Construction Management and Economics, 20(3), pp. 225–235. doi: 10.1080/01446190110112838.WilliamsT. P.2002Predicting completed project cost using bidding dataConstruction Management and Economics20322523510.1080/01446190110112838Open DOISearch in Google Scholar

Williams, T. P. (2005). Bidding ratios to predict highway project costs. Engineering, Construction and Architectural Management, 12(1), pp. 38–51. doi: 10.1108/09699980510576880.WilliamsT. P.2005Bidding ratios to predict highway project costsEngineering, Construction and Architectural Management121385110.1108/09699980510576880Open DOISearch in Google Scholar

Williams, T. P. (2007). Using classification rules to develop a predictive indicator of project cost overrun potential from bidding data. In: Computing in Civil Engineering (2007). American Society of Civil Engineers, Reston, VA, pp. 35–42. doi: 10.1061/40937(261)5.WilliamsT. P.2007Using classification rules to develop a predictive indicator of project cost overrun potential from bidding dataIn:Computing in Civil Engineering (2007)American Society of Civil EngineersReston, VA354210.1061/40937(261)5Open DOISearch in Google Scholar

Williams, T. P., Lakshminarayanan, S., & Sackrowitz, H. (2005). Analyzing bidding statistics to predict completed project cost. In: International Conference on Computing in Civil Engineering 2005, July 12–15, 2005, Cancun, Mexico. pp. 1–10. doi: 10.1061/40794(179)157.WilliamsT. P.LakshminarayananS.SackrowitzH.2005Analyzing bidding statistics to predict completed project costIn:International Conference on Computing in Civil Engineering 2005July 12–15, 2005Cancun, Mexico11010.1061/40794(179)157Open DOISearch in Google Scholar

Wolpert, D. H. (2004). Theory of collective intelligence. In: Collectives and the Design of Complex Systems. Springer New York, New York, NY, pp. 43–106. doi: 10.1007/978-1-4419-8909-3_2.WolpertD. H.2004Theory of collective intelligenceIn:Collectives and the Design of Complex SystemsSpringerNew York, New York, NY4310610.1007/978-1-4419-8909-3_2Open DOISearch in Google Scholar

Wolpert, D. H., Tumer, K., & Frank, J. (1999). Using collective intelligence to route internet traffic. Available at http://arxiv.org/abs/cs/9905004.WolpertD. H.TumerK.FrankJ.1999Using collective intelligence to route internet trafficAvailable at http://arxiv.org/abs/cs/9905004.Search in Google Scholar

Worthington, A. C., & Higgs, H. (2004). Art as an investment: risk, return and portfolio diversification in major painting markets. Accounting and Finance, 44(2), pp. 257–271. doi: 10.1111/j.1467-629X.2004.00108.x.WorthingtonA. C.HiggsH.2004Art as an investment: risk, return and portfolio diversification in major painting marketsAccounting and Finance44225727110.1111/j.1467-629X.2004.00108.xOpen DOISearch in Google Scholar

Wright, M. G., & Williams, T. P. (2001). Using bidding statistics to predict completed construction cost. Engineering Economist, 46(2), pp. 114–128. doi: 10.1080/00137910108967565.WrightM. G.WilliamsT. P.2001Using bidding statistics to predict completed construction costEngineering Economist46211412810.1080/00137910108967565Open DOISearch in Google Scholar