Reliable Tilt of Objects Subjected to Rectification and Located in Mining Areas
31 dic 2023
Acerca de este artículo
Publicado en línea: 31 dic 2023
Páginas: 79 - 92
Recibido: 28 abr 2023
Aceptado: 08 jun 2023
DOI: https://doi.org/10.2478/acee-2023-0052
Palabras clave
© 2023 Krzysztof Gromysz, published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Figure 1.
![A single-storey building of a church: a) plan, b) section view, c) building during rectification, d) view of east side after rectification; based on [19]](https://sciendo-parsed.s3.eu-central-1.amazonaws.com/65be0abcc8e72413086583bc/j_acee-2023-0052_fig_001.jpg?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=AKIA6AP2G7AKOUXAVR44%2F20250906%2Feu-central-1%2Fs3%2Faws4_request&X-Amz-Date=20250906T120214Z&X-Amz-Expires=3600&X-Amz-Signature=33724bab50bd9deccc16f1c2593e51498c592385787d1afb229a3df79d91d71f&X-Amz-SignedHeaders=host&x-amz-checksum-mode=ENABLED&x-id=GetObject)
Figure 2.

Figure 3.

Figure 4.

Figure 5.

Figure 6.

Figure 7.

Figure 8.

Figure 9.

Figure 10.
![Rectified historic timber building of museum: a) ground floor plan with determined values uobj, b) cross-section, c) works related to the new foundation; based on [20]](https://sciendo-parsed.s3.eu-central-1.amazonaws.com/65be0abcc8e72413086583bc/j_acee-2023-0052_fig_010.jpg?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=AKIA6AP2G7AKOUXAVR44%2F20250906%2Feu-central-1%2Fs3%2Faws4_request&X-Amz-Date=20250906T120214Z&X-Amz-Expires=3600&X-Amz-Signature=bf8bfb8621201383ef21d1290e7adf2a6ad69bcc8d68d59933e6dbc01d629718&X-Amz-SignedHeaders=host&x-amz-checksum-mode=ENABLED&x-id=GetObject)
Figure 11.
![Rectified bell tower: a) vertical section, b) floor plan with determined values uobj, c) reinforced concrete ring beam supported on piles, based on [21]](https://sciendo-parsed.s3.eu-central-1.amazonaws.com/65be0abcc8e72413086583bc/j_acee-2023-0052_fig_011.jpg?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=AKIA6AP2G7AKOUXAVR44%2F20250906%2Feu-central-1%2Fs3%2Faws4_request&X-Amz-Date=20250906T120214Z&X-Amz-Expires=3600&X-Amz-Signature=3095d062d0f56150fa8230f02fdedaaa6258ce5766fc47d0d064e93f0215580c&X-Amz-SignedHeaders=host&x-amz-checksum-mode=ENABLED&x-id=GetObject)
Figure 12.

Figure 13.
![Rectified tank with avolume of 950 m3: a) facility plan with determined values uobj, b) cross-section, c) void between the foundation and the ground; based on [22]](https://sciendo-parsed.s3.eu-central-1.amazonaws.com/65be0abcc8e72413086583bc/j_acee-2023-0052_fig_013.jpg?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=AKIA6AP2G7AKOUXAVR44%2F20250906%2Feu-central-1%2Fs3%2Faws4_request&X-Amz-Date=20250906T120214Z&X-Amz-Expires=3600&X-Amz-Signature=af1b299ee0ee369144c0892a1438166cf3c02a080160c72dbd2a80347c4c69d7&X-Amz-SignedHeaders=host&x-amz-checksum-mode=ENABLED&x-id=GetObject)