This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.
Adeli, H., & Karim, A. (1997). Scheduling/cost optimization and neural dynamics model for construction. Journal of Construction Engineering and Management, 123(4), pp. 450–458. doi: 10.1061/(ASCE)0733-9364(1997)123:4(450).AdeliH.KarimA.1997Scheduling/cost optimization and neural dynamics model for construction123445045810.1061/(ASCE)0733-9364(1997)123:4(450)Open DOISearch in Google Scholar
Al Haj, R., & El-Sayegh, S. (2015). Time-cost optimization model considering float-consumption Impact. Journal of Construction Engineering and Management, 141(5), 04015001. doi: 10.1061/(ASCE)CO.1943-7862.0000966.Al HajR.El-SayeghS.2015Time-cost optimization model considering float-consumption Impact14150401500110.1061/(ASCE)CO.1943-7862.0000966Open DOISearch in Google Scholar
Biafore, B. (2013). Microsoft Project 2013: The Missing Manual. O’Reilly Media, Sebastopol, CA.BiaforeB.2013O’Reilly MediaSebastopol, CASearch in Google Scholar
Crnković, D., & Vukomanović, M. (2016). Comparison of trends in risk management theory and practices within the construction industry. E-GFOS, 7(13), pp. 1–11. doi: 10.13167/2016.13.1.CrnkovićD.VukomanovićM.2016Comparison of trends in risk management theory and practices within the construction industry71311110.13167/2016.13.1Open DOISearch in Google Scholar
Eshtehardian, E., Afshar, A., & Abbasnia, R. (2009). Fuzzy-based MOGA approach to stochastic time-cost trade-off problem. Automation in Construction, 18(5), pp. 692–701. doi: 10.1016/j.autcon.2009.02.001.EshtehardianE.AfsharA.AbbasniaR.2009Fuzzy-based MOGA approach to stochastic time-cost trade-off problem18569270110.1016/j.autcon.2009.02.001Open DOISearch in Google Scholar
Ezeldin, A. S., & Soliman, A. (2009). Hybrid time-cost optimization of nonserial repetitive construction projects. Journal of Construction Engineering and Management, 135(1), pp. 42–55. doi: 10.1061/(ASCE)0733-9364(2009)135:1(42).EzeldinA. S.SolimanA.2009Hybrid time-cost optimization of nonserial repetitive construction projects1351425510.1061/(ASCE)0733-9364(2009)135:1(42)Open DOISearch in Google Scholar
Frontline Systems. (2017). Frontline Solvers Optimization and Simulation User Guide. Available at https://www.solver.com/user-guides-frontline-systems-excel-solvers/on 07 November, 2017).Frontline Systems2017Available at https://www.solver.com/user-guides-frontline-systems-excel-solvers/on 07 November, 2017).Search in Google Scholar
Galić, M., Završki, I., & Dolaček-Alduk, Z. (2016a). Scenario simulation model for optimized allocation of construction machinery. Građevinar, 68(2), pp. 105–112. doi: 10.14256/JCE.1462.2015.GalićM.ZavrškiI.Dolaček-AldukZ.2016aScenario simulation model for optimized allocation of construction machinery68210511210.14256/JCE.1462.2015Open DOISearch in Google Scholar
Galić, M., Završki, I., & Dolaček-Alduk, Z. (2016b). Methodology and algorithm for asphalt supply chain optimization. Tehnicki Vjesnik-Technical Gazette, 23(4), pp. 1193–1200. doi: 10.17559/TV-20150623140015.GalićM.ZavrškiI.Dolaček-AldukZ.2016bMethodology and algorithm for asphalt supply chain optimization2341193120010.17559/TV-20150623140015Open DOISearch in Google Scholar
Galić, M., Barišić, I., & Ištoka Otković, I. (2017). Route reliability based simulation model for HMA delivery in urban areas. Procedia Engineering, 187, pp. 378–386. doi: 10.1016/j.proeng.2017.04.389.GalićM.BarišićI.Ištoka OtkovićI.2017Route reliability based simulation model for HMA delivery in urban areas18737838610.1016/j.proeng.2017.04.389Open DOISearch in Google Scholar
Geem, Z. W. (2010). Multiobjective optimization of time-cost trade-off using harmony search. Journal of Construction Engineering and Management, 136(6), pp. 711–716. doi: 10.1061/(ASCE)CO.1943-7862.0000167.GeemZ. W.2010Multiobjective optimization of time-cost trade-off using harmony search136671171610.1061/(ASCE)CO.1943-7862.0000167Open DOISearch in Google Scholar
Harris, P. E. (2016). Planning and Control Using Microsoft Project 2013 and 2016. Eastwood Harris Pty Ltd, Doncaster Heights, VIC.HarrisP. E.2016Eastwood Harris Pty LtdDoncaster Heights, VICSearch in Google Scholar
Hazir, Ö., Haouari, M., & Erel, E. (2010). Robust scheduling and robustness measures for the discrete time/cost trade-off problem. European Journal of Operational Research, 207(2), pp. 633–643. doi: 10.1016/j.ejor.2010.05.046.HazirÖ.HaouariM.ErelE.2010Robust scheduling and robustness measures for the discrete time/cost trade-off problem207263364310.1016/j.ejor.2010.05.046Open DOISearch in Google Scholar
Hazir, Ö., Erel, E., & Günalay, Y. (2011). Robust optimization models for the discrete time/cost trade-off problem. International Journal of Production Economics, 130(1), pp. 87–95. doi: 10.1016/j.ijpe.2010.11.018.HazirÖ.ErelE.GünalayY.2011Robust optimization models for the discrete time/cost trade-off problem1301879510.1016/j.ijpe.2010.11.018Open DOISearch in Google Scholar
He, Z., Wang, N., Jia, T., & Xu, Y. (2009). Simulated annealing and tabu search for multi-mode project payment scheduling. European Journal of Operational Research, 198(3), pp. 688–696. doi: 10.1016/j.ejor.2008.10.005.HeZ.WangN.JiaT.XuY.2009Simulated annealing and tabu search for multi-mode project payment scheduling198368869610.1016/j.ejor.2008.10.005Open DOISearch in Google Scholar
Hillier, F. S., & Lieberman, G. J. (2014). Introduction to Operations Research, 10th edn. McGraw-Hill Higher Education, New York, NY.HillierF. S.LiebermanG. J.201410th ednMcGraw-Hill Higher EducationNew York, NYSearch in Google Scholar
Kalhor, E., Khanzadi, M., Eshtehardian, E., & Afshar, A. (2011). Stochastic time-cost optimization using non-dominated archiving ant colony approach. Automation in Construction, 20(8), pp. 1193–1203. doi: 10.1016/j.autcon.2011.05.003.KalhorE.KhanzadiM.EshtehardianE.AfsharA.2011Stochastic time-cost optimization using non-dominated archiving ant colony approach2081193120310.1016/j.autcon.2011.05.003Open DOISearch in Google Scholar
Kažović, D., & Valenčić, D. (2013, May). Using Microsoft Project for project management in non-governmental organisations. In: Information & Communication Technology Electronics & Microelectronics (MIPRO), 2013 36th International Convention on 20–24 May 2013, Opatija, Croatia. IEEE, pp. 681–684.KažovićD.ValenčićD.2013MayIn:Information & Communication Technology Electronics & Microelectronics (MIPRO), 2013 36th International Convention20–24 May 2013Opatija, CroatiaIEEE681684Search in Google Scholar
Klanšek, U. (2016). Mixed-Integer nonlinear programming model for nonlinear discrete optimization of project schedules under restricted costs. Journal of Construction Engineering and Management, 142(3), 04015088. doi: 10.1061/(ASCE)CO.1943-7862.0001074.KlanšekU.2016Mixed-Integer nonlinear programming model for nonlinear discrete optimization of project schedules under restricted costs14230401508810.1061/(ASCE)CO.1943-7862.0001074Open DOISearch in Google Scholar
Kostalova, J., & Tetrevova, L. (2014). Project management and its tools in practice in the Czech Republic. Procedia-Social and Behavioral Sciences, 150, pp. 678–689. doi: 10.1016/j.sbspro.2014.09.087.KostalovaJ.TetrevovaL.2014Project management and its tools in practice in the Czech Republic15067868910.1016/j.sbspro.2014.09.087Open DOISearch in Google Scholar
Marmel, E. (2013), Project 2010 Bible. John Wiley & Sons, Indianapolis, IN.MarmelE.2013John Wiley & SonsIndianapolis, INSearch in Google Scholar
Mokhtari, H., Aghaie, A., Rahimi, J., & Mozdgir, A. (2010). Project time-cost trade-off scheduling: A hybrid optimization approach. International Journal of Advanced Manufacturing Technology, 50, 5–8(2010), pp. 811–822. doi: 10.1007/s00170-010-2543-4.MokhtariH.AghaieA.RahimiJ.MozdgirA.2010Project time-cost trade-off scheduling: A hybrid optimization approach505–8(2010)81182210.1007/s00170-010-2543-4Open DOISearch in Google Scholar
Nearchou, A. C. (2010). Scheduling with controllable processing times and compression costs using population-based heuristics. International Journal of Production Research, 48(23), pp. 7043–7062. doi: 10.1080/00207540903433874.NearchouA. C.2010Scheduling with controllable processing times and compression costs using population-based heuristics48237043706210.1080/00207540903433874Open DOISearch in Google Scholar
Petlíková, K., & Jarský, Č. (2017). Modeling of the time structure of construction processes using neural networks. Organization, Technology and Management in Construction: An International Journal, 9(1), pp. 1559–1564. doi: 10.1515/otmcj-2016-0018.PetlíkováK.JarskýČ2017Modeling of the time structure of construction processes using neural networks911559156410.1515/otmcj-2016-0018Open DOISearch in Google Scholar
Sakellaropoulos, S., & Chassiakos, A. P. (2004). Project time-cost analysis under generalised precedence relations. Advances in Engineering Software, 35(10–11), pp. 715–724. doi: 10.1016/j.advengsoft.2004.03.017.SakellaropoulosS.ChassiakosA. P.2004Project time-cost analysis under generalised precedence relations3510–1171572410.1016/j.advengsoft.2004.03.017Open DOISearch in Google Scholar
Silva Filho, O. S., Cezarino, W., & Ratto, J. (2010). Aggregate production planning: Modeling and solution via Excel spreadsheet and solver. IFAC Proceedings Volumes, 43(17), pp. 89–94. doi: 10.3182/20100908-3-PT-3007.00020.Silva FilhoO. S.CezarinoW.RattoJ.2010Aggregate production planning: Modeling and solution via Excel spreadsheet and solver4317899410.3182/20100908-3-PT-3007.00020Open DOISearch in Google Scholar
Sonmez, R., & Bettemir, Ö. H. (2012). A hybrid genetic algorithm for the discrete time-cost trade-off problem. Expert Systems with Applications. 39(13), pp. 11428–11434. doi: 10.1016/j.eswa.2012.04.019.SonmezR.BettemirÖ. H.2012A hybrid genetic algorithm for the discrete time-cost trade-off problem3913114281143410.1016/j.eswa.2012.04.019Open DOISearch in Google Scholar
Trautmann, N., & Gnägi, M. (2015, December). On an application of Microsoft Excel’s evolutionary solver to the resource-constrained project scheduling problem RCPSP. In: Industrial Engineering and Engineering Management (IEEM), 2015 IEEE International Conference on 6–9 Dec. 2015, Singapore. IEEE, pp. 646–650. doi: 10.1109/IEEM.2015.7385727.TrautmannN.GnägiM.2015DecemberIn:Industrial Engineering and Engineering Management (IEEM), 2015 IEEE International Conference6–9 Dec. 2015SingaporeIEEE64665010.1109/IEEM.2015.7385727Open DOISearch in Google Scholar
Valenko, T., & Klanšek, U. (2017, September). Cost optimal time scheduling integrating spreadsheet and project management software. In: 13th International Conference Organization, Technology and Management in Construction, 2017. Croatian Association for Construction Management: University of Zagreb, Faculty of Civil Engineering, pp. 42–53.ValenkoT.KlanšekU.2017SeptemberIn:13th International Conference Organization, Technology and Management in Construction, 2017Croatian Association for Construction Management: University of Zagreb, Faculty of Civil Engineering4253Search in Google Scholar
Vanhoucke, M. (2005). New computational results for the discrete time/cost trade-off problem with time-switch constraints. European Journal of Operational Research, 165(2), pp. 359–374. doi: 10.1016/j.ejor.2004.04.007.VanhouckeM.2005New computational results for the discrete time/cost trade-off problem with time-switch constraints165235937410.1016/j.ejor.2004.04.007Open DOISearch in Google Scholar
Von Laszewski, G., & Dilmanian, L. E. (2008, November). e-Science project and experiment management with Microsoft Project. In: Grid Computing Environments Workshop, 2008. GCE’08. IEEE, pp. 1–8. doi: 10.1109/GCE.2008.4738449.Von LaszewskiG.DilmanianL. E.2008NovemberInGrid Computing Environments Workshop, 2008. GCE’08IEEE1810.1109/GCE.2008.4738449Open DOISearch in Google Scholar
Yang, I.-T. (2007). Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis. Journal of Construction Engineering and Management, 133(7), pp. 498–505. doi: 10.1061/(ASCE)0733-9364(2007)133:7(498).YangI.-T.2007Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis133749850510.1061/(ASCE)0733-9364(2007)133:7(498)Open DOISearch in Google Scholar