Acceso abierto

Risk management method for small photovoltaic plants


Cite

Velikova, P. (2012), “Tendencies in the development of the photovoltaic market in Bulgaria”, Proceedings of Ruse University, Vol. 51, No. 1-2, pp. 119-124.Search in Google Scholar

SEWRC. (2012), “Decision № C-28 from 29th Aug 2012 of SEWRC, available at: http://www.dker.bg/files/DOWNLOAD/res-C28-29082012.pdf, (accessed Jun 21, 2013).Search in Google Scholar

Velikova, P. and Kirova, M. (2014), “Expert evaluation for risk management of the exploitation of photovoltaic installations”, Annals of „Eftimie Murgu” University Reşiţa, Fascicle II. Economic Studies, No XXI, pp. 383-391.Search in Google Scholar

Cortez, L., Cortez, J.I., Aguilar, G.M., Rueda, S.M., Rodriguez, A.D., García, G.T., Camacho, A.P. and Hernandez, EH. (2012), “Determination of the Efficiency of a Photovoltaic System Operating On the Climatic Features of Mexico”, International journal of advanced renewable energy research, Vol. 1, No. 11, pp. 611-617.Search in Google Scholar

Kirova, M. and Velikova, P. (2014), “Monte Carlo simulation for risk assessment of photovoltaic installations”, CTIC - Proceedings in Conference of Informatics and Management Sciences, University of Zilina, Slovak Republic, pp. 82-87.Search in Google Scholar

Kirova, M. and Velikova, P. (2013). “The Preferential Purchase Price of Electrical Energy from Photovoltaics in Bulgaria – Political Risk at Their Construction”, Journal of Entrepreneurship & Innovation, Vol. 5, pp. 110-127.Search in Google Scholar

Lüthi, S. and Wüstenhagen, R. (2012). “The price of policy risk — Empirical insights from choice experiments with European, photovoltaic project developers”, Energy Economics, Vol. 34, No. 4, pp. 1001-1011.Search in Google Scholar

Sarasa-Maestro, C.J., Dufo-López, R. and Bernal-Agustín, J.L. (2013), “Photovoltaic remuneration policies in the European Union”, Energy Policy, Vol. 55, pp. 317-328.10.1016/j.enpol.2012.12.011Search in Google Scholar

Olaru, M., Şandru, M. and Pirnea, I.C. (2014), “Monte Carlo method application for environmental risks impact assessment in investment projects”, Procedia - Social and Behavioral Sciences, Vol. 109, pp. 940-943.10.1016/j.sbspro.2013.12.568Search in Google Scholar

Shorter, J. and Rabitz, H. (1997), “Risk analysis by the guided monte carlo technique”, Journal of Statistical Computation and Simulation, Vol. 57, No. 1-4, pp. 321-336.10.1080/00949659708811815Search in Google Scholar

Boycheva, E.S. (2007), “The risk in the enterprise and its management”, Controlling, Vol. 1, pp. 15-17.Search in Google Scholar

Branscomb, L.M. and Auerswald, P.E. (2001), Taking technical risks, Cambridge: The MIT Press.Search in Google Scholar

Awerbuch, S. (2000), “Investing in Renewables: Risk Accounting and the Value of New Technology”, available at: www.awerbuch.com/shimonpages/shimondocs/solar-roofs-policy.pdf, (accessed March 4, 2014).Search in Google Scholar

Parida, B., Iniyan, S. and Goic, R. (2011), “A review of solar photovoltaic technologies”, Renewable and Sustainable Energy Reviews, Vol. 15, pp. 1625-1636.10.1016/j.rser.2010.11.032Search in Google Scholar

Fthenakis, V. and Moskowitz, P. (2000), “Photovoltaics: Environmental, Health and Safety Issues and Perspectives”, Progress in photovoltaics: research and applications, Vol. 8, Issue 1, New York: John Wiley & Sons, pp. 27-38.10.1002/(SICI)1099-159X(200001/02)8:1<27::AID-PIP296>3.0.CO;2-8Search in Google Scholar

EVN (2012), “Information from EVN Bulgaria”, available at: https://www.evn.bg/Medii/VEI13_08.aspx?listnode=/Medii, (accessed August 19, 2012).Search in Google Scholar

Vladimirov, L. (2009), “A comparative analysis of the methods for risk assessment of potentially dangerous objects and activities, Proceedings of Ruse university, Vol. 48, No. 1.2, pp. 132-136.Search in Google Scholar

Mitev, V. (2007), “Evaluation of the reserves and resources of the deposits of polymetallic ores”, Annals of the University of mining and geology “St. Ivan Rilski”, Vol. 50, No. IV, pp. 53-58.Search in Google Scholar

Arunraj, N.S., Mandal, S. and Maiti, J. (2013), “Modeling uncertainty in risk assessment: An integrated approach with fuzzy set theory and Monte Carlo simulation”, Accident Analysis and Prevention, Vol. 55, pp. 242-255.10.1016/j.aap.2013.03.007Search in Google Scholar

Zhang, P., Li, W., Li, S., Wang, Y. and Xiao, W, (2013). “Reliability assessment of photovoltaic power systems: Review of current status and future perspectives”, Applied Energy, Vol. 104, pp. 822-833.Search in Google Scholar

Ragsdale, C.T. (2012), Spreadsheet modeling & decision analysis, Mason, USA: South-Western. Cengage Learning.Search in Google Scholar

Microsoft. (2014), “Introduction to Monte Carlo simulation”, available at: http://office.microsoft.com/en-us/excel-help/introduction-to-monte-carlo-simulation-HA001111893.aspx, (accessed February 13, 2014).Search in Google Scholar

Guerrero, H. (2010), Excel Data Analysis, Berlin: Springer.10.1007/978-3-642-10835-8Search in Google Scholar

Evans, J. and Olson, D. (2001), Introduction to simulation and risk analysis, Upper Saddle River: Prentice-Hall Inc.Search in Google Scholar

Mun, J. (2006), Modeling risk: applying Monte Carlo simulation, real options analysis, forecasting, and optimization techniques, Hoboken: John Wiley & Sons.Search in Google Scholar

Wang, Y., Cao, Z. and Aua, S. (2011), “Practical reliability analysis of slope stability by advanced Monte Carlo simulations in a spreadsheet”, Canadian Geotechnological Journal, Vol. 48, No1 1, pp. 162-172.10.1139/T10-044Search in Google Scholar

GoldSim (2014), “Monte Carlo Simulation Software for Decision and Risk Analysis”, available at: http://www.goldsim.com/Home/#>, (accessed March 18, 2014).Search in Google Scholar

Lumina Decision Systems (2014), “Analytica Editions”. Available at: http://www.lumina.com/products/analytica-editions/, (accessed March 18, 2014).Search in Google Scholar

Machain, L. (2010), “Montecarlo Simulation in Excel”, available at: http://www.simularsoft.com.ar/SimulAr1e.htm, (accessed March 18, 2014).Search in Google Scholar

Sheehy, P. and Martz, E. (2012), “Doing Monte Carlo Simulation in Minitab Statistical Software”, available at: http://www.minitab.com/en-us/Published-Articles/Doing-Monte-Carlo-Simulation-in-Minitab-Statistical-Software/, (accessed March 18, 2014).Search in Google Scholar

Wang, J. and Huang, D. (2012), “RosenPoint: A Microsoft Excel-based program for the Rosenblueth point estimate method and an application in slope stability analysis”, Computers & Geosciences, Vol. 48, pp. 239-243.10.1016/j.cageo.2012.01.009Search in Google Scholar

Georgiev, R. (2002), Risk management in entreprenural activity, Sofia: “Financial House Logos-TM” JSC and the Institute for interdisciplinary research.Search in Google Scholar

Mehandjiev, M. (1996), Decreasing and minimizing waste the mining, mineral processing and metallurgical enterprises, Sofia: Coopconsult.Search in Google Scholar

Malakov, I. (2008), “Classification of methods for determining the technical and economic performance of systems for low-cost automation”, Scientific reports of the Scientific Technical Union in mechanical engineering, Vol. 3, No. 106, pp. 52-62.Search in Google Scholar

Minev, B., Naydenov, N. and Nedyalkov, A. (2014), “Methodology for research of technical equipment at machine-building enterprises”, Proceedings of International Scientific Conference “Management of Change”, Ruse: Primax, pp. 145-155.Search in Google Scholar

Hubbard, D.W. (2007), How to Measure Anything: Finding the Value of “Intangibles” in Business, Hoboken, New Jersey, USA: John Wiley & Sons.Search in Google Scholar

Marinova, N. (2012), “Mechanisms in risk management in project activity for sustainable development, in: Jubilee International Congress Science, Education, Technologies “40 Years Bulgaria - Space Country”. 12-14 September 2012, Shumen: Konstantin Preslavsky University of Shumen, University Press, Varna, Bulgaria, pp. 311-318.Search in Google Scholar

Kirova M., Sheludko, I. and Velikova, P. (2012), “Ranking of risks in the operation of small energy plants”, Contemporary Issues in Business, Management and Education ‘2012, Vilnus, Lithuania, pp. 26-40.10.3846/cibme.2012.03Search in Google Scholar

Hristova, M. (2007), “Expert evaluation of the quality of education in universities and methods for its objectivisation”, Academic journal Mechanics. Transport. Communications, Vol. 1, pp. BG-0.1-BG-0.14.Search in Google Scholar

Vasilev, H., Kyuchukov, R. and Byrdarski, N. (2013), “Method for evaluation of tenders at public procurements for street lighting, in: V Scientific conference, EF’2013, 2-5 September, Sozopol, Bulgaria, pp. 55-63.Search in Google Scholar

NSI 2008, Classification of economic activities 2008, available at: http://www.nsi.bg/sites/default/files/files/publications/KID-2008.pdf, (accessed November 12, 2015).Search in Google Scholar