[Velikova, P. (2012), “Tendencies in the development of the photovoltaic market in Bulgaria”, Proceedings of Ruse University, Vol. 51, No. 1-2, pp. 119-124.]Search in Google Scholar
[SEWRC. (2012), “Decision № C-28 from 29th Aug 2012 of SEWRC, available at: http://www.dker.bg/files/DOWNLOAD/res-C28-29082012.pdf, (accessed Jun 21, 2013).]Search in Google Scholar
[Velikova, P. and Kirova, M. (2014), “Expert evaluation for risk management of the exploitation of photovoltaic installations”, Annals of „Eftimie Murgu” University Reşiţa, Fascicle II. Economic Studies, No XXI, pp. 383-391.]Search in Google Scholar
[Cortez, L., Cortez, J.I., Aguilar, G.M., Rueda, S.M., Rodriguez, A.D., García, G.T., Camacho, A.P. and Hernandez, EH. (2012), “Determination of the Efficiency of a Photovoltaic System Operating On the Climatic Features of Mexico”, International journal of advanced renewable energy research, Vol. 1, No. 11, pp. 611-617.]Search in Google Scholar
[Kirova, M. and Velikova, P. (2014), “Monte Carlo simulation for risk assessment of photovoltaic installations”, CTIC - Proceedings in Conference of Informatics and Management Sciences, University of Zilina, Slovak Republic, pp. 82-87.]Search in Google Scholar
[Kirova, M. and Velikova, P. (2013). “The Preferential Purchase Price of Electrical Energy from Photovoltaics in Bulgaria – Political Risk at Their Construction”, Journal of Entrepreneurship & Innovation, Vol. 5, pp. 110-127.]Search in Google Scholar
[Lüthi, S. and Wüstenhagen, R. (2012). “The price of policy risk — Empirical insights from choice experiments with European, photovoltaic project developers”, Energy Economics, Vol. 34, No. 4, pp. 1001-1011.]Search in Google Scholar
[Sarasa-Maestro, C.J., Dufo-López, R. and Bernal-Agustín, J.L. (2013), “Photovoltaic remuneration policies in the European Union”, Energy Policy, Vol. 55, pp. 317-328.10.1016/j.enpol.2012.12.011]Search in Google Scholar
[Olaru, M., Şandru, M. and Pirnea, I.C. (2014), “Monte Carlo method application for environmental risks impact assessment in investment projects”, Procedia - Social and Behavioral Sciences, Vol. 109, pp. 940-943.10.1016/j.sbspro.2013.12.568]Search in Google Scholar
[Shorter, J. and Rabitz, H. (1997), “Risk analysis by the guided monte carlo technique”, Journal of Statistical Computation and Simulation, Vol. 57, No. 1-4, pp. 321-336.10.1080/00949659708811815]Search in Google Scholar
[Boycheva, E.S. (2007), “The risk in the enterprise and its management”, Controlling, Vol. 1, pp. 15-17.]Search in Google Scholar
[Branscomb, L.M. and Auerswald, P.E. (2001), Taking technical risks, Cambridge: The MIT Press.]Search in Google Scholar
[Awerbuch, S. (2000), “Investing in Renewables: Risk Accounting and the Value of New Technology”, available at: www.awerbuch.com/shimonpages/shimondocs/solar-roofs-policy.pdf, (accessed March 4, 2014).]Search in Google Scholar
[Parida, B., Iniyan, S. and Goic, R. (2011), “A review of solar photovoltaic technologies”, Renewable and Sustainable Energy Reviews, Vol. 15, pp. 1625-1636.10.1016/j.rser.2010.11.032]Search in Google Scholar
[Fthenakis, V. and Moskowitz, P. (2000), “Photovoltaics: Environmental, Health and Safety Issues and Perspectives”, Progress in photovoltaics: research and applications, Vol. 8, Issue 1, New York: John Wiley & Sons, pp. 27-38.10.1002/(SICI)1099-159X(200001/02)8:1<27::AID-PIP296>3.0.CO;2-8]Search in Google Scholar
[EVN (2012), “Information from EVN Bulgaria”, available at: https://www.evn.bg/Medii/VEI13_08.aspx?listnode=/Medii, (accessed August 19, 2012).]Search in Google Scholar
[Vladimirov, L. (2009), “A comparative analysis of the methods for risk assessment of potentially dangerous objects and activities, Proceedings of Ruse university, Vol. 48, No. 1.2, pp. 132-136.]Search in Google Scholar
[Mitev, V. (2007), “Evaluation of the reserves and resources of the deposits of polymetallic ores”, Annals of the University of mining and geology “St. Ivan Rilski”, Vol. 50, No. IV, pp. 53-58.]Search in Google Scholar
[Arunraj, N.S., Mandal, S. and Maiti, J. (2013), “Modeling uncertainty in risk assessment: An integrated approach with fuzzy set theory and Monte Carlo simulation”, Accident Analysis and Prevention, Vol. 55, pp. 242-255.10.1016/j.aap.2013.03.007]Search in Google Scholar
[Zhang, P., Li, W., Li, S., Wang, Y. and Xiao, W, (2013). “Reliability assessment of photovoltaic power systems: Review of current status and future perspectives”, Applied Energy, Vol. 104, pp. 822-833.]Search in Google Scholar
[Ragsdale, C.T. (2012), Spreadsheet modeling & decision analysis, Mason, USA: South-Western. Cengage Learning.]Search in Google Scholar
[Microsoft. (2014), “Introduction to Monte Carlo simulation”, available at: http://office.microsoft.com/en-us/excel-help/introduction-to-monte-carlo-simulation-HA001111893.aspx, (accessed February 13, 2014).]Search in Google Scholar
[Guerrero, H. (2010), Excel Data Analysis, Berlin: Springer.10.1007/978-3-642-10835-8]Search in Google Scholar
[Evans, J. and Olson, D. (2001), Introduction to simulation and risk analysis, Upper Saddle River: Prentice-Hall Inc.]Search in Google Scholar
[Mun, J. (2006), Modeling risk: applying Monte Carlo simulation, real options analysis, forecasting, and optimization techniques, Hoboken: John Wiley & Sons.]Search in Google Scholar
[Wang, Y., Cao, Z. and Aua, S. (2011), “Practical reliability analysis of slope stability by advanced Monte Carlo simulations in a spreadsheet”, Canadian Geotechnological Journal, Vol. 48, No1 1, pp. 162-172.10.1139/T10-044]Search in Google Scholar
[GoldSim (2014), “Monte Carlo Simulation Software for Decision and Risk Analysis”, available at: http://www.goldsim.com/Home/#>, (accessed March 18, 2014).]Search in Google Scholar
[Lumina Decision Systems (2014), “Analytica Editions”. Available at: http://www.lumina.com/products/analytica-editions/, (accessed March 18, 2014).]Search in Google Scholar
[Machain, L. (2010), “Montecarlo Simulation in Excel”, available at: http://www.simularsoft.com.ar/SimulAr1e.htm, (accessed March 18, 2014).]Search in Google Scholar
[Sheehy, P. and Martz, E. (2012), “Doing Monte Carlo Simulation in Minitab Statistical Software”, available at: http://www.minitab.com/en-us/Published-Articles/Doing-Monte-Carlo-Simulation-in-Minitab-Statistical-Software/, (accessed March 18, 2014).]Search in Google Scholar
[Wang, J. and Huang, D. (2012), “RosenPoint: A Microsoft Excel-based program for the Rosenblueth point estimate method and an application in slope stability analysis”, Computers & Geosciences, Vol. 48, pp. 239-243.10.1016/j.cageo.2012.01.009]Search in Google Scholar
[Georgiev, R. (2002), Risk management in entreprenural activity, Sofia: “Financial House Logos-TM” JSC and the Institute for interdisciplinary research.]Search in Google Scholar
[Mehandjiev, M. (1996), Decreasing and minimizing waste the mining, mineral processing and metallurgical enterprises, Sofia: Coopconsult.]Search in Google Scholar
[Malakov, I. (2008), “Classification of methods for determining the technical and economic performance of systems for low-cost automation”, Scientific reports of the Scientific Technical Union in mechanical engineering, Vol. 3, No. 106, pp. 52-62.]Search in Google Scholar
[Minev, B., Naydenov, N. and Nedyalkov, A. (2014), “Methodology for research of technical equipment at machine-building enterprises”, Proceedings of International Scientific Conference “Management of Change”, Ruse: Primax, pp. 145-155.]Search in Google Scholar
[Hubbard, D.W. (2007), How to Measure Anything: Finding the Value of “Intangibles” in Business, Hoboken, New Jersey, USA: John Wiley & Sons.]Search in Google Scholar
[Marinova, N. (2012), “Mechanisms in risk management in project activity for sustainable development, in: Jubilee International Congress Science, Education, Technologies “40 Years Bulgaria - Space Country”. 12-14 September 2012, Shumen: Konstantin Preslavsky University of Shumen, University Press, Varna, Bulgaria, pp. 311-318.]Search in Google Scholar
[Kirova M., Sheludko, I. and Velikova, P. (2012), “Ranking of risks in the operation of small energy plants”, Contemporary Issues in Business, Management and Education ‘2012, Vilnus, Lithuania, pp. 26-40.10.3846/cibme.2012.03]Search in Google Scholar
[Hristova, M. (2007), “Expert evaluation of the quality of education in universities and methods for its objectivisation”, Academic journal Mechanics. Transport. Communications, Vol. 1, pp. BG-0.1-BG-0.14.]Search in Google Scholar
[Vasilev, H., Kyuchukov, R. and Byrdarski, N. (2013), “Method for evaluation of tenders at public procurements for street lighting, in: V Scientific conference, EF’2013, 2-5 September, Sozopol, Bulgaria, pp. 55-63.]Search in Google Scholar
[NSI 2008, Classification of economic activities 2008, available at: http://www.nsi.bg/sites/default/files/files/publications/KID-2008.pdf, (accessed November 12, 2015).]Search in Google Scholar