[1. Frankel E.G.: Impact of technological change on shipbuildingproductivity, Journal of Ship Production, 1, 3, 174-183, 1985.10.5957/jsp.1985.1.3.174]Search in Google Scholar
[2. Inozu B., et al.: New horizons for shipbuilding processimprovement, Journal of Ship Production, 22, 2, 87-98, 2006.10.5957/jsp.2006.22.2.87]Search in Google Scholar
[3. Eker E.: The application of the process improvement concept onthe paint works, MSc Thesis, ITU Institute of Science, Istanbul, 1999.]Search in Google Scholar
[4. Hardwick M., Kassel B., Crump B. and Garret S.: Improvingshipyard manufacturing processes using STEP-NC, Journal of Ship Production, 21, 3, 170-176, 2005.10.5957/jsp.2005.21.3.170]Search in Google Scholar
[5. DiBarra C.: 5S-A tool for culture change in shipyards, Journal of Ship Production, 18, 3, 143-151, 2002.10.5957/jsp.2002.18.3.143]Search in Google Scholar
[6. Odabasi A.Y., Alkaner S., Olcer A. and Sukas N.: Reengineeringof small and medium-sized ship production facilities: Anexample for Turkish Shipbuilding industry, Journal of Ship Production, 13, 1, 8-15, 1997.10.5957/jsp.1997.13.1.8]Search in Google Scholar
[7. Odabasi A.Y., et al.: Development and evaluation of MarmaraShipyard’s expansion program, Contract Report, Istanbul, 1993.]Search in Google Scholar
[8. Larson T., and Tice J.: Lean and EMS Integration Workshop, Environmental Technologies, Ship Production Panels, USA, 2005.]Search in Google Scholar
[9. Lamb T.: Simulation-based performance improvement forshipbuilding processes, Journal of Ship Production, Vol. 22, No. 2, May, pp.49-65, 2006.10.5957/jsp.2006.22.2.49]Search in Google Scholar
[10. Shin J.G.: A modeling and simulation of production process insubassembly lines at a shipyard, Journal of Ship Production, Vol.20, No.2, May, pp.79-83, 2004.10.5957/jsp.2004.20.2.79]Search in Google Scholar
[11. Shin J.G.: A concept and framework for a shipyard layout designbased on simulation, Journal of Ship Production, Vol.25, No.3, August, pp.126-135, 2009.10.5957/jsp.2009.25.3.126]Search in Google Scholar
[12. Alkaner S.: The Modelling and Analysis of Ship Production withSimulation: Case Study, PhD Thesis, ITU Institute of Science, Istanbul, 1998.]Search in Google Scholar
[13. Greenwood A.G., Hill H.W.: Simulation Optimization DecisionSupport System for Ship Panel Shop Operations, Proceedings of the 2005 Winter Simulation Conference, pp. 2078-2086, 2005.]Search in Google Scholar
[14. Kelton W.D., Sadowski R.P. and Sturrock D.T.: Simulation withArena, Third edition, McGraw-Hill, 1998.]Search in Google Scholar
[15. Fafandjel N., et al.: Procedure for measuring shipbuildingprocess optimization results after using modular outfittingconcept, Urednistvo Casopisa Strojartvo, 50, 3, 141-150, 2008.]Search in Google Scholar
[16. Yu H. and Ishida K.: The evaluation of the effectivenessof modular outfitting of engine room machines, Fourth International Conference on Marine Technology, 23-25 May, Poland, 391-399, 2001.]Search in Google Scholar
[17. Baade R., et al.: Modular outfitting, Journal of Ship Production, 14, 3, 170-179, 1998.10.5957/jsp.1998.14.3.170]Search in Google Scholar