Effective pre-qualification systems – Are they essential for minimising delays on road projects?


Zitieren

Alzober, W., & Yaakub, A. R. (2014). Integrated model for selection the prequalification criteria of contractor. Lecture Notes on Software Engineering, 2(3), p. 233. Alzober W. Yaakub A. R. ( 2014 ). Integrated model for selection the prequalification criteria of contractor . Lecture Notes on Software Engineering , 2 ( 3 ), p. 233 . Search in Google Scholar

Araújo, M., Alencar, L., & Mota, C. (2015). Contractor selection in construction industry: A multicriteria model. In: IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 06-09 December 2015, Singapore, pp. 519–523. Araújo M. Alencar L. Mota C. ( 2015 ). Contractor selection in construction industry: A multicriteria model . In: IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) , 06-09 December 2015 , Singapore , pp. 519 523 . Search in Google Scholar

Balubaid, M., & Alamoudi, R. (2015). Application of the analytical hierarchy process (AHP) to multi-criteria analysis for contractor selection. American Journal of Industrial and Business Management, 5(09), p. 581. Balubaid M. Alamoudi R. ( 2015 ). Application of the analytical hierarchy process (AHP) to multi-criteria analysis for contractor selection . American Journal of Industrial and Business Management , 5 ( 09 ), p. 581 . Search in Google Scholar

Doraisamy, S. V., Akasah, Z. A., & Yunus, R. (2015). An overview on the issue of delay in the construction industry. In: InCIEC 2014, pp. 313–319. doi: 10.1007/978-981-287-290-6_27. Doraisamy S. V. Akasah Z. A. Yunus R. ( 2015 ). An overview on the issue of delay in the construction industry . In: InCIEC 2014 , pp. 313 319 . doi: 10.1007/978-981-287-290-6_27 . Open DOISearch in Google Scholar

El-khalek, H. A., Aziz, R. F., & Morgan, E. S. (2019). Identification of construction subcontractor prequalification evaluation criteria and their impact on project success. Alexandria Engineering Journal, 58, pp. 217–223. El-khalek H. A. Aziz R. F. Morgan E. S. ( 2019 ). Identification of construction subcontractor prequalification evaluation criteria and their impact on project success . Alexandria Engineering Journal , 58 , pp. 217 223 . Search in Google Scholar

Gransberg, D., Dillon, W. D., Reynolds, L., & Boyd, J. (1999). Quantitative analysis of partnered project performance. Journal of Construction Engineering and Management, 125(3), 161–166. Gransberg D. Dillon W. D. Reynolds L. Boyd J. ( 1999 ). Quantitative analysis of partnered project performance . Journal of Construction Engineering and Management , 125 ( 3 ), 161 166 . Search in Google Scholar

Hatush, Z., & Skitmore, M. (1997). Criteria for contractor selection. Construction Management & Economics, 15(1), pp. 19–38. Hatush Z. Skitmore M. ( 1997 ). Criteria for contractor selection . Construction Management & Economics , 15 ( 1 ), pp. 19 38 . Search in Google Scholar

Ibadov, N. (2015). Contractor selection for construction project, with the use of fuzzy preference relation. Procedia Engineering, 111, pp. 317–323. doi: 10.1016/j.proeng.2015.07.095. Ibadov N. ( 2015 ). Contractor selection for construction project, with the use of fuzzy preference relation . Procedia Engineering , 111 , pp. 317 323 . doi: 10.1016/j.proeng.2015.07.095 . Open DOISearch in Google Scholar

Ioannou, P., & Awwad, R. (2010). Below-average bidding method. Journal of Construction Engineering and Management, ASCE, 136(9), pp. 936–946. doi: 10.1061/(ASCE)CO.1943-7862.0000202. Ioannou P. Awwad R. ( 2010 ). Below-average bidding method . Journal of Construction Engineering and Management, ASCE , 136 ( 9 ), pp. 936 946 . doi: 10.1061/(ASCE)CO.1943-7862.0000202 . Open DOISearch in Google Scholar

Lo T. Y., Fung I. W. & Tung K. C. (2006), “Construction delays in Hong Kong civil engineering projects”, Journal of construction engineering and management, 132(6), pp.636–649. Lo T. Y. Fung I. W. Tung K. C. ( 2006 ), “ Construction delays in Hong Kong civil engineering projects ”, Journal of construction engineering and management , 132 ( 6 ), pp. 636 649 . Search in Google Scholar

Kapote, M. M., & Pimplikar, S. S. (2014). Suggested mathematical model for specialized subcontractor prequalification scrutiny and ultimately the performance prediction. IOSR Journal of Mechanical and Civil Engineering, 11(3), pp. 43–51. Kapote M. M. Pimplikar S. S. ( 2014 ). Suggested mathematical model for specialized subcontractor prequalification scrutiny and ultimately the performance prediction . IOSR Journal of Mechanical and Civil Engineering , 11 ( 3 ), pp. 43 51 . Search in Google Scholar

Kolekar, P. B., & Kanade, G. N. (2014). Contractor selection in construction industry using fuzzy-logic system. International Journal of Engineering Research & Technology, 3(11), pp. 1087–1093. Kolekar P. B. Kanade G. N. ( 2014 ). Contractor selection in construction industry using fuzzy-logic system . International Journal of Engineering Research & Technology , 3 ( 11 ), pp. 1087 1093 . Search in Google Scholar

Plebankiewicz, E. (2009). Contractor prequalification model using fuzzy sets. Journal of Civil Engineering and Management, 15(4), pp. 377–385. Plebankiewicz E. ( 2009 ). Contractor prequalification model using fuzzy sets . Journal of Civil Engineering and Management , 15 ( 4 ), pp. 377 385 . Search in Google Scholar

Puri, D., & Tiwari, S. (2014). Evaluating the criteria for contractors’ selection and bid evaluation. International Journal of Engineering Science Invention, 3(7), pp. 44–48. Puri D. Tiwari S. ( 2014 ). Evaluating the criteria for contractors’ selection and bid evaluation . International Journal of Engineering Science Invention , 3 ( 7 ), pp. 44 48 . Search in Google Scholar

Rashvand, P., Abd Majid, M. Z., Baniahmadi, M., & Ghavamirad, F. (2015). Contractor selection at prequalification stage: Current evaluation and shortcomings. Jurnal Teknologi, 77(16), pp. 81–89. Rashvand P. Abd Majid M. Z. Baniahmadi M. Ghavamirad F. ( 2015 ). Contractor selection at prequalification stage: Current evaluation and shortcomings . Jurnal Teknologi , 77 ( 16 ), pp. 81 89 . Search in Google Scholar

Waara, F., & Bröchner, J. (2006). Price and nonprice criteria for contractor selection. Journal of Construction Engineering and Management, ASCE, 132(8), p. 797. Waara F. Bröchner J. ( 2006 ). Price and nonprice criteria for contractor selection . Journal of Construction Engineering and Management, ASCE , 132 ( 8 ), p. 797 . Search in Google Scholar

Zailani, S., Ariffin, H., Moeinzadeh, S., & Iranmanesh, M. (2016). The moderating effect of project risk mitigation strategies on the relationship between delay factors and construction project performance. Journal of Science and Technology Policy Management, 7(3), pp. 346–368. Zailani S. Ariffin H. Moeinzadeh S. Iranmanesh M. ( 2016 ). The moderating effect of project risk mitigation strategies on the relationship between delay factors and construction project performance . Journal of Science and Technology Policy Management , 7 ( 3 ), pp. 346 368 . Search in Google Scholar

eISSN:
1847-6228
Sprache:
Englisch
Zeitrahmen der Veröffentlichung:
Volume Open
Fachgebiete der Zeitschrift:
Technik, Einführungen und Gesamtdarstellungen, andere