State control bodies |
Accurate and reliable control of investment construction process – through the control of versions of the CMT at the stages:certification of materials, technologies, and equipment for inclusion in the databases of CMT;issuance of urban-planning conditions and restrictions and technical conditions;electronic examination (including the use of automated tools for deter-mining conflicts: spatial, technological, financial, etc.);commissioning of the building (by comparing the CMT and the actually erected building). |
Percentage of mutual conformity of versions of CMT, acceleration of capital turnover (direct).Reducing the cost of construction, operating costs, building life cycle cost; increasing the profitability of the construction industry, energy efficiency, indicators of requirements for buildings, CSI (indirect). |
Investor (consolidated and distributed) |
Quality control of investment construction project management through control of conformity of versions of CMT at stages of the technical and economic substantiation, designing, construction on technological packages of works: |
|
Consumer of construction products |
comparative analysis of CMT versions for compliance of architectural decisions, cost, and terms of construction;transparent communication with the consulting engineer, as a result – high quality of construction service. |
|
Consulting engineer |
Improving the quality of management through: acceleration of logistics of project resources (initially informational, as a result – communication, financial, labor, material).reducing routine, increasing the role of leadership in management. |
The interval between control points for decision-making, the accuracy of production information (direct). |
CMT developers (architects and designers, estimators, and technologists) |
Use of modern software products.Use of agreed pre-prepared information blocks from databases of CMT.Regulation of business processes. |
Reducing the complexity of modeling, increasing labor efficiency (direct).Increase in wages (indirect). |
Contractors and suppliers |
Reduction of non-production costs due to well-established logistics of resources.Implementation of innovative design and technological solutions. Regulation of business processes. |
Reducing the complexity of work, increasing profits, reducing the duration of work, accelerating capital turnover (direct). |