Cite

Ahadzie, D., Proverbs, D., & Olomolaiye, P. (2008). Critical success criteria for mass house building projects in developing countries. International Journal of Project Management, 26(6), pp. 675–687.AhadzieD.ProverbsD.OlomolaiyeP.2008Critical success criteria for mass house building projects in developing countriesInternational Journal of Project Management26667568710.1016/j.ijproman.2007.09.006Search in Google Scholar

Anantatmula, V. S. (2015). Strategies for enhancing project performance. Journal of Management in Engineering, 31(6), p. Article in Press.AnantatmulaV. S.2015Strategies for enhancing project performanceJournal of Management in Engineering316Article in Press.10.1061/(ASCE)ME.1943-5479.0000369Search in Google Scholar

Atkinson, R. (1999). Project management: Cost, time and quality, two best guesses and a phenomenon, it’s time to accept other success criteria. International Journal of Project Management, 17(6), pp. 337–342.AtkinsonR.1999Project management: Cost, time and quality, two best guesses and a phenomenon, it’s time to accept other success criteriaInternational Journal of Project Management17633734210.1016/S0263-7863(98)00069-6Search in Google Scholar

Bakker, R. M., Cambré, B., Korlaar, L., & Raab, J. (2011). Managing the project learning paradox: A set-theoretic approach toward project knowledge transfer. International Journal of Project Management, 29(5), pp. 494–503.BakkerR. M.CambréB.KorlaarL.RaabJ.2011Managing the project learning paradox: A set-theoretic approach toward project knowledge transferInternational Journal of Project Management29549450310.1016/j.ijproman.2010.06.002Search in Google Scholar

Barrett, P., & Sutrisna, M. (2009). Methodological strategies to gain insights into informality and emergence in construction project case studies. Construction Management and Economics, 27(10), pp. 935–948.BarrettP.SutrisnaM.2009Methodological strategies to gain insights into informality and emergence in construction project case studiesConstruction Management and Economics271093594810.1080/01446190903273943Search in Google Scholar

Bassioni, H., Price, A., & Hassan, T. M. (2004). Performance measurement in construction. Journal of Management in Engineering, 20(2), pp. 42–50.BassioniH.PriceA.HassanT. M.2004Performance measurement in constructionJournal of Management in Engineering202425010.1061/(ASCE)0742-597X(2004)20:2(42)Search in Google Scholar

Chan, A. P. C., & Sidwell, T. (2001). Framework for Measuring Success of Construction Projects. Queensland University of Technology, Brisbane, Australia.ChanA. P. C.SidwellT.2001Framework for Measuring Success of Construction ProjectsQueensland University of TechnologyBrisbane, AustraliaSearch in Google Scholar

Coakes, E., & Elliman, A. (2011). Developing organisational stories through grounded theory data analysis: A case example for studying IS phenomena. International Journal of Sociotechnology and Knowledge Development, 3(2), p. 16.CoakesE.EllimanA.2011Developing organisational stories through grounded theory data analysis: A case example for studying IS phenomenaInternational Journal of Sociotechnology and Knowledge Development321610.4018/978-1-4666-2151-0.ch003Search in Google Scholar

Cronqvist, L. (2003). Using Multi-Value Logic Synthesis in Social Science. In 2nd General Conference of the European Consortium for Political Research (ECPR) [ September 2003], Marburg. Section 6 - Panel 8, pp. 1–22.CronqvistL.2003Using Multi-Value Logic Synthesis in Social ScienceIn2nd General Conference of the European Consortium for Political Research (ECPR)September 2003MarburgSection 6 - Panel 8,122Search in Google Scholar

Dainty, A. R. J., Cheng, M.-I., & Moore, D. R. (2003). Redefining performance measures for construction project managers: an empirical evaluation. Construction Management and Economics, 21(2), pp. 209–218.DaintyA. R. J.ChengM.-I.MooreD. R.2003Redefining performance measures for construction project managers: an empirical evaluationConstruction Management and Economics21220921810.1080/0144619032000049737Search in Google Scholar

Eisenhardt, K. M. (1989). Building theories from case study research. Academy of Management Review, 14(4), pp. 532–550.EisenhardtK. M.1989Building theories from case study researchAcademy of Management Review14453255010.4135/9781473915480.n52Search in Google Scholar

Goldkuhl, G., & Cronholm, S. (2003). Adding Theoretical Grounding to Grounded Theory: Toward Multi-Grounded Theory’, in 2nd European Conference on Research Methods in Business and Management. Reading, UK.GoldkuhlG.CronholmS.2003Adding Theoretical Grounding to Grounded Theory: Toward Multi-Grounded Theory’in2nd European Conference on Research Methods in Business and ManagementReading, UKSearch in Google Scholar

Government of India (2013). Department of Fertilizers Annual Report 2012–2013, pp. 1–176.Government of India2013Department of Fertilizers Annual Report 2012–20131176Search in Google Scholar

Hajdu, M., & Isaac, S. (2016). Sixty years of project planning: history and future. Organization, Technology and Management in Construction: an International Journal, 8(1), pp. 1499–1510. doi: 10.1515/otmcj-2016-0013.HajduM.IsaacS.2016Sixty years of project planning: history and futureOrganization, Technology and Management in Construction: an International Journal811499151010.1515/otmcj-2016-0013Open DOISearch in Google Scholar

Hwang, B.-G., Thomas, S. R., & Caldas, C. H. (2010). Performance metric development for pharmaceutical construction projects. International Journal of Project Management, 28(3), pp. 265–274.HwangB.-G.ThomasS. R.CaldasC. H.2010Performance metric development for pharmaceutical construction projectsInternational Journal of Project Management28326527410.1016/j.ijproman.2009.06.004Search in Google Scholar

Iyer, K. C., & Banerjee, P. S. (2015). Facilitators and inhibitors in sector wide technology transfer projects in developing economies: An empirical study. The Journal of Technology Transfer, p. 26. doi: 10.1007/s10961-015-9456-1.IyerK. C.BanerjeeP. S.2015Facilitators and inhibitors in sector wide technology transfer projects in developing economies: An empirical studyThe Journal of Technology Transfer2610.1007/s10961-015-9456-1Open DOISearch in Google Scholar

Iyer, K. C., & Banerjee, P. S. (2016). Measuring and benchmarking managerial efficiency of project execution schedule performance. International Journal of Project Management, 34(2), pp. 219–236.IyerK. C.BanerjeeP. S.2016Measuring and benchmarking managerial efficiency of project execution schedule performanceInternational Journal of Project Management34221923610.1016/j.ijproman.2015.10.008Search in Google Scholar

Iyer, K. C., & Banerjee, P. S. (2017). Project ambidexterity: Case of recovering schedule delay in a brownfield airport project in India. Organization, Technology and Management in Construction: An International Journal, 9(1), pp. 1–18. doi: 10.1515/otmcj-2016-0012.IyerK. C.BanerjeeP. S.2017Project ambidexterity: Case of recovering schedule delay in a brownfield airport project in IndiaOrganization, Technology and Management in Construction: An International Journal9111810.1515/otmcj-2016-0012Open DOISearch in Google Scholar

Iyer, K. C., & Jha, K. N. (2006). Critical factors affecting schedule performance: Evidence from Indian construction projects. Journal of Construction Engineering and Management, 132(8), p. 871.IyerK. C.JhaK. N.2006Critical factors affecting schedule performance: Evidence from Indian construction projectsJournal of Construction Engineering and Management132887110.1061/(ASCE)0733-9364(2006)132:8(871)Search in Google Scholar

Jacobson, C., & Choi, S. O. (2008). Success factors: Public works and public-private partnerships. International Journal of Public Sector Management, 21(6), pp. 637–657.JacobsonC.ChoiS. O.2008Success factors: Public works and public-private partnershipsInternational Journal of Public Sector Management21663765710.1108/09513550810896514Search in Google Scholar

Jordan, E. et al. (2011). Use and misuse of qualitative comparative analysis. Construction Management and Economics, 29(11), pp. 1159–1173.JordanE.2011Use and misuse of qualitative comparative analysisConstruction Management and Economics29111159117310.1080/01446193.2011.640339Search in Google Scholar

Krueger, D. C., Parast, M. M., & Adams, S. (2014). Six Sigma implementation: a qualitative case study using grounded theory. Production Planning & Control: The Management of Operations, 25(10), pp. 873–889.KruegerD. C.ParastM. M.AdamsS.2014Six Sigma implementation: a qualitative case study using grounded theoryProduction Planning & Control: The Management of Operations251087388910.1080/09537287.2013.771414Search in Google Scholar

Lam, E. W. M., Chan, A. P. C., & Chan, D. W. M. (2004). Benchmarking design-build procurement systems in construction. Benchmarking: An International Journal, 11(3), pp. 287–302.LamE. W. M.ChanA. P. C.ChanD. W. M.2004Benchmarking design-build procurement systems in constructionBenchmarking: An International Journal11328730210.1108/14635770410538763Search in Google Scholar

Laufer, A., Gordon, D. R., & Shenhar, A. J. (1996). Simultaneous management: The key to excellence in capital projects. International Journal of Project Management, 14(4), pp. 189–199.LauferA.GordonD. R.ShenharA. J.1996Simultaneous management: The key to excellence in capital projectsInternational Journal of Project Management14418919910.1016/0263-7863(95)00091-7Search in Google Scholar

Lehmann, H. (2010). Research method: Grounded theory for descriptive and exploratory case studies. In The Dynamics of International Information Systems, Anatomy of a Grounded Theory investigation. 1st edn. Springer, US, pp. 53–65. doi: 10.1007/978-1-4419-5750-4.LehmannH.2010Research method: Grounded theory for descriptive and exploratory case studiesInThe Dynamics of International Information Systems, Anatomy of a Grounded Theory investigation1st ednSpringerUS536510.1007/978-1-4419-5750-4Open DOISearch in Google Scholar

Ling, F. Y. Y., & Liu, M. (2004). Using neural network to predict performance of design-build projects in Singapore. Building and Environment, 39(10), pp. 1263–1274. doi: 10.1016/j.buildenv.2004.02.008.LingF. Y. Y.LiuM.2004Using neural network to predict performance of design-build projects in SingaporeBuilding and Environment39101263127410.1016/j.buildenv.2004.02.008Open DOISearch in Google Scholar

Petlíková, K., & Jarský, Č. (2017). Modeling of the time structure of construction processes using neural networks. Organization, Technology and Management in Construction: An International Journal, 9(1), pp. 1559–1564. doi: 10.1515/otmcj-2016-0018.PetlíkováK.JarskýČ2017Modeling of the time structure of construction processes using neural networksOrganization, Technology and Management in Construction: An International Journal911559156410.1515/otmcj-2016-0018Open DOISearch in Google Scholar

Project Management Institute. (2007). Construction Extension to the PMBOK Guide Third Edition. Project Management Institute.Project Management Institute2007Construction Extension to the PMBOK Guide Third EditionProject Management InstituteSearch in Google Scholar

Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge (PMBoK Guide). 5th edn. Newton Square, PA: Project Management Institute.Project Management Institute2013A Guide to the Project Management Body of Knowledge (PMBoK Guide)5th ednNewton Square, PAProject Management Institute10.1002/pmj.21345Search in Google Scholar

Ragin, C. C. (1987). The Comparative Method: Moving Beyond Qualitative and Quantitative Strategies. University of California Press, Berkeley.RaginC. C.1987The Comparative Method: Moving Beyond Qualitative and Quantitative StrategiesUniversity of California PressBerkeleySearch in Google Scholar

Ragin, C. C. (1998). The logic of qualitative comparative analysis. International Review of Social History, 43(Supplement), pp. 105–124.RaginC. C.1998The logic of qualitative comparative analysisInternational Review of Social History43Supplement10512410.1017/CBO9780511563874.006Search in Google Scholar

Ragin, C. C. (2005). Fuzzy sets and social research. Sociological Methods & Research, 33(4), pp. 423–430.RaginC. C.2005Fuzzy sets and social researchSociological Methods & Research33442343010.1177/0049124105274499Search in Google Scholar

Ragin, C. C. (2006). Set relations in social research: Evaluating their consistency and coverage. Political Analysis, 14(3), pp. 291–310.RaginC. C.2006Set relations in social research: Evaluating their consistency and coveragePolitical Analysis14329131010.1093/pan/mpj019Search in Google Scholar

Rihoux, B. (2006). Qualitative comparative analysis (QCA) and related systematic comparative methods: Recent advances and remaining challenges for social science research. International Sociology, 21(5), pp. 679–706.RihouxB.2006Qualitative comparative analysis (QCA) and related systematic comparative methods: Recent advances and remaining challenges for social science researchInternational Sociology21567970610.1177/0268580906067836Search in Google Scholar

Rihoux, B., & De Meur, G. (2008). Crisp set qualitative comparative analysis (csQCA). In: Rihoux, B., & Ragin, C. C. (eds.). Configurational Comparative Methods: Qualitative Comparative Analysis (QCA) and Related Techniques. Published: 2009, pp. 33–68. doi: 10.4135/9781452226569.n3. Print ISBN: 9781412942355, Online ISBN: 9781452226569.RihouxB.De MeurG.2008Crisp set qualitative comparative analysis (csQCA)In:RihouxB.RaginC. C.(eds.).Configurational Comparative Methods: Qualitative Comparative Analysis (QCA) and Related TechniquesPublished: 2009,336810.4135/9781452226569.n3Print ISBN: 9781412942355, Online ISBN: 9781452226569Open DOISearch in Google Scholar

Skaaning, S.-E. (2011). Assessing the robustness of crisp-set and fuzzy-set QCA results. Sociological Methods & Research, 40(2), pp. 391–408.SkaaningS.-E.2011Assessing the robustness of crisp-set and fuzzy-set QCA resultsSociological Methods & Research40239140810.1177/0049124111404818Search in Google Scholar

Strauss, A. L. and Corbin, J. M. (1998) Basics of Qualitative Research: Techniques and Procedures for Developing Grounded Theory. SAGE Publications, Thousand Oaks, California.StraussA. L.CorbinJ. M.1998Basics of Qualitative Research: Techniques and Procedures for Developing Grounded TheorySAGE PublicationsThousand Oaks, CaliforniaSearch in Google Scholar

Verweij, S., & Gerrits, L. M. (2013). Understanding and researching complexity with qualitative comparative analysis: Evaluating transportation infrastructure projects, Evaluation, 19(1), pp. 40–55.VerweijS.GerritsL. M.2013Understanding and researching complexity with qualitative comparative analysis: Evaluating transportation infrastructure projectsEvaluation191405510.1177/1356389012470682Search in Google Scholar

Wright, E. R., Cho, K., & Hastak, M. (2014). Assessment of critical construction engineering and management aspects of nuclear power projects. Journal of Management in Engineering, 30(4), pp. 1–11. doi: 10.1061/(ASCE)ME.1943-5479.0000286.WrightE. R.ChoK.HastakM.2014Assessment of critical construction engineering and management aspects of nuclear power projectsJournal of Management in Engineering30411110.1061/(ASCE)ME.1943-5479.0000286Open DOISearch in Google Scholar

Yin, R. K. (2003) Case Study Research: Design and Methods. 3rd edn. SAGE Publications, Thousand Oaks, CA.YinR. K.2003Case Study Research: Design and Methods3rd ednSAGE PublicationsThousand Oaks, CASearch in Google Scholar

Zhang, X. (2005). Improving concessionaire selection protocols in public/private partnered infrastructure projects. Journal of Construction Engineering and Management, 130(5), pp. 670–679.ZhangX.2005Improving concessionaire selection protocols in public/private partnered infrastructure projectsJournal of Construction Engineering and Management130567067910.1061/(ASCE)0733-9364(2004)130:5(670)Search in Google Scholar

eISSN:
1847-6228
Language:
English
Publication timeframe:
Volume Open
Journal Subjects:
Engineering, Introductions and Overviews, other