Ahadzie, D., Proverbs, D., & Olomolaiye, P. (2008). Critical success criteria for mass house building projects in developing countries. International Journal of Project Management, 26(6), pp. 675–687.AhadzieD.ProverbsD.OlomolaiyeP.2008Critical success criteria for mass house building projects in developing countries26667568710.1016/j.ijproman.2007.09.006Search in Google Scholar
Anantatmula, V. S. (2015). Strategies for enhancing project performance. Journal of Management in Engineering, 31(6), p. Article in Press.AnantatmulaV. S.2015Strategies for enhancing project performance316Article in Press.10.1061/(ASCE)ME.1943-5479.0000369Search in Google Scholar
Atkinson, R. (1999). Project management: Cost, time and quality, two best guesses and a phenomenon, it’s time to accept other success criteria. International Journal of Project Management, 17(6), pp. 337–342.AtkinsonR.1999Project management: Cost, time and quality, two best guesses and a phenomenon, it’s time to accept other success criteria17633734210.1016/S0263-7863(98)00069-6Search in Google Scholar
Bakker, R. M., Cambré, B., Korlaar, L., & Raab, J. (2011). Managing the project learning paradox: A set-theoretic approach toward project knowledge transfer. International Journal of Project Management, 29(5), pp. 494–503.BakkerR. M.CambréB.KorlaarL.RaabJ.2011Managing the project learning paradox: A set-theoretic approach toward project knowledge transfer29549450310.1016/j.ijproman.2010.06.002Search in Google Scholar
Barrett, P., & Sutrisna, M. (2009). Methodological strategies to gain insights into informality and emergence in construction project case studies. Construction Management and Economics, 27(10), pp. 935–948.BarrettP.SutrisnaM.2009Methodological strategies to gain insights into informality and emergence in construction project case studies271093594810.1080/01446190903273943Search in Google Scholar
Bassioni, H., Price, A., & Hassan, T. M. (2004). Performance measurement in construction. Journal of Management in Engineering, 20(2), pp. 42–50.BassioniH.PriceA.HassanT. M.2004Performance measurement in construction202425010.1061/(ASCE)0742-597X(2004)20:2(42)Search in Google Scholar
Chan, A. P. C., & Sidwell, T. (2001). Framework for Measuring Success of Construction Projects. Queensland University of Technology, Brisbane, Australia.ChanA. P. C.SidwellT.2001Queensland University of TechnologyBrisbane, AustraliaSearch in Google Scholar
Coakes, E., & Elliman, A. (2011). Developing organisational stories through grounded theory data analysis: A case example for studying IS phenomena. International Journal of Sociotechnology and Knowledge Development, 3(2), p. 16.CoakesE.EllimanA.2011Developing organisational stories through grounded theory data analysis: A case example for studying IS phenomena321610.4018/978-1-4666-2151-0.ch003Search in Google Scholar
Cronqvist, L. (2003). Using Multi-Value Logic Synthesis in Social Science. In 2nd General Conference of the European Consortium for Political Research (ECPR) [ September 2003], Marburg. Section 6 - Panel 8, pp. 1–22.CronqvistL.2003In2nd General Conference of the European Consortium for Political Research (ECPR)September 2003MarburgSection 6 - Panel 8,122Search in Google Scholar
Dainty, A. R. J., Cheng, M.-I., & Moore, D. R. (2003). Redefining performance measures for construction project managers: an empirical evaluation. Construction Management and Economics, 21(2), pp. 209–218.DaintyA. R. J.ChengM.-I.MooreD. R.2003Redefining performance measures for construction project managers: an empirical evaluation21220921810.1080/0144619032000049737Search in Google Scholar
Eisenhardt, K. M. (1989). Building theories from case study research. Academy of Management Review, 14(4), pp. 532–550.EisenhardtK. M.1989Building theories from case study research14453255010.4135/9781473915480.n52Search in Google Scholar
Goldkuhl, G., & Cronholm, S. (2003). Adding Theoretical Grounding to Grounded Theory: Toward Multi-Grounded Theory’, in 2nd European Conference on Research Methods in Business and Management. Reading, UK.GoldkuhlG.CronholmS.2003in2nd European Conference on Research Methods in Business and ManagementReading, UKSearch in Google Scholar
Government of India (2013). Department of Fertilizers Annual Report 2012–2013, pp. 1–176.Government of India20131176Search in Google Scholar
Hajdu, M., & Isaac, S. (2016). Sixty years of project planning: history and future. Organization, Technology and Management in Construction: an International Journal, 8(1), pp. 1499–1510. doi: 10.1515/otmcj-2016-0013.HajduM.IsaacS.2016Sixty years of project planning: history and future811499151010.1515/otmcj-2016-0013Open DOISearch in Google Scholar
Hwang, B.-G., Thomas, S. R., & Caldas, C. H. (2010). Performance metric development for pharmaceutical construction projects. International Journal of Project Management, 28(3), pp. 265–274.HwangB.-G.ThomasS. R.CaldasC. H.2010Performance metric development for pharmaceutical construction projects28326527410.1016/j.ijproman.2009.06.004Search in Google Scholar
Iyer, K. C., & Banerjee, P. S. (2015). Facilitators and inhibitors in sector wide technology transfer projects in developing economies: An empirical study. The Journal of Technology Transfer, p. 26. doi: 10.1007/s10961-015-9456-1.IyerK. C.BanerjeeP. S.2015Facilitators and inhibitors in sector wide technology transfer projects in developing economies: An empirical study2610.1007/s10961-015-9456-1Open DOISearch in Google Scholar
Iyer, K. C., & Banerjee, P. S. (2016). Measuring and benchmarking managerial efficiency of project execution schedule performance. International Journal of Project Management, 34(2), pp. 219–236.IyerK. C.BanerjeeP. S.2016Measuring and benchmarking managerial efficiency of project execution schedule performance34221923610.1016/j.ijproman.2015.10.008Search in Google Scholar
Iyer, K. C., & Banerjee, P. S. (2017). Project ambidexterity: Case of recovering schedule delay in a brownfield airport project in India. Organization, Technology and Management in Construction: An International Journal, 9(1), pp. 1–18. doi: 10.1515/otmcj-2016-0012.IyerK. C.BanerjeeP. S.2017Project ambidexterity: Case of recovering schedule delay in a brownfield airport project in India9111810.1515/otmcj-2016-0012Open DOISearch in Google Scholar
Iyer, K. C., & Jha, K. N. (2006). Critical factors affecting schedule performance: Evidence from Indian construction projects. Journal of Construction Engineering and Management, 132(8), p. 871.IyerK. C.JhaK. N.2006Critical factors affecting schedule performance: Evidence from Indian construction projects132887110.1061/(ASCE)0733-9364(2006)132:8(871)Search in Google Scholar
Jacobson, C., & Choi, S. O. (2008). Success factors: Public works and public-private partnerships. International Journal of Public Sector Management, 21(6), pp. 637–657.JacobsonC.ChoiS. O.2008Success factors: Public works and public-private partnerships21663765710.1108/09513550810896514Search in Google Scholar
Jordan, E. et al. (2011). Use and misuse of qualitative comparative analysis. Construction Management and Economics, 29(11), pp. 1159–1173.JordanE.2011Use and misuse of qualitative comparative analysis29111159117310.1080/01446193.2011.640339Search in Google Scholar
Krueger, D. C., Parast, M. M., & Adams, S. (2014). Six Sigma implementation: a qualitative case study using grounded theory. Production Planning & Control: The Management of Operations, 25(10), pp. 873–889.KruegerD. C.ParastM. M.AdamsS.2014Six Sigma implementation: a qualitative case study using grounded theory251087388910.1080/09537287.2013.771414Search in Google Scholar
Lam, E. W. M., Chan, A. P. C., & Chan, D. W. M. (2004). Benchmarking design-build procurement systems in construction. Benchmarking: An International Journal, 11(3), pp. 287–302.LamE. W. M.ChanA. P. C.ChanD. W. M.2004Benchmarking design-build procurement systems in construction11328730210.1108/14635770410538763Search in Google Scholar
Laufer, A., Gordon, D. R., & Shenhar, A. J. (1996). Simultaneous management: The key to excellence in capital projects. International Journal of Project Management, 14(4), pp. 189–199.LauferA.GordonD. R.ShenharA. J.1996Simultaneous management: The key to excellence in capital projects14418919910.1016/0263-7863(95)00091-7Search in Google Scholar
Lehmann, H. (2010). Research method: Grounded theory for descriptive and exploratory case studies. In The Dynamics of International Information Systems, Anatomy of a Grounded Theory investigation. 1st edn. Springer, US, pp. 53–65. doi: 10.1007/978-1-4419-5750-4.LehmannH.2010Research method: Grounded theory for descriptive and exploratory case studiesIn1st ednSpringerUS536510.1007/978-1-4419-5750-4Open DOISearch in Google Scholar
Ling, F. Y. Y., & Liu, M. (2004). Using neural network to predict performance of design-build projects in Singapore. Building and Environment, 39(10), pp. 1263–1274. doi: 10.1016/j.buildenv.2004.02.008.LingF. Y. Y.LiuM.2004Using neural network to predict performance of design-build projects in Singapore39101263127410.1016/j.buildenv.2004.02.008Open DOISearch in Google Scholar
Petlíková, K., & Jarský, Č. (2017). Modeling of the time structure of construction processes using neural networks. Organization, Technology and Management in Construction: An International Journal, 9(1), pp. 1559–1564. doi: 10.1515/otmcj-2016-0018.PetlíkováK.JarskýČ2017Modeling of the time structure of construction processes using neural networks911559156410.1515/otmcj-2016-0018Open DOISearch in Google Scholar
Project Management Institute. (2007). Construction Extension to the PMBOK Guide Third Edition. Project Management Institute.Project Management Institute2007Project Management InstituteSearch in Google Scholar
Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge (PMBoK Guide). 5th edn. Newton Square, PA: Project Management Institute.Project Management Institute20135th ednNewton Square, PAProject Management Institute10.1002/pmj.21345Search in Google Scholar
Ragin, C. C. (1987). The Comparative Method: Moving Beyond Qualitative and Quantitative Strategies. University of California Press, Berkeley.RaginC. C.1987University of California PressBerkeleySearch in Google Scholar
Ragin, C. C. (1998). The logic of qualitative comparative analysis. International Review of Social History, 43(Supplement), pp. 105–124.RaginC. C.1998The logic of qualitative comparative analysis43Supplement10512410.1017/CBO9780511563874.006Search in Google Scholar
Ragin, C. C. (2005). Fuzzy sets and social research. Sociological Methods & Research, 33(4), pp. 423–430.RaginC. C.2005Fuzzy sets and social research33442343010.1177/0049124105274499Search in Google Scholar
Ragin, C. C. (2006). Set relations in social research: Evaluating their consistency and coverage. Political Analysis, 14(3), pp. 291–310.RaginC. C.2006Set relations in social research: Evaluating their consistency and coverage14329131010.1093/pan/mpj019Search in Google Scholar
Rihoux, B. (2006). Qualitative comparative analysis (QCA) and related systematic comparative methods: Recent advances and remaining challenges for social science research. International Sociology, 21(5), pp. 679–706.RihouxB.2006Qualitative comparative analysis (QCA) and related systematic comparative methods: Recent advances and remaining challenges for social science research21567970610.1177/0268580906067836Search in Google Scholar
Rihoux, B., & De Meur, G. (2008). Crisp set qualitative comparative analysis (csQCA). In: Rihoux, B., & Ragin, C. C. (eds.). Configurational Comparative Methods: Qualitative Comparative Analysis (QCA) and Related Techniques. Published: 2009, pp. 33–68. doi: 10.4135/9781452226569.n3. Print ISBN: 9781412942355, Online ISBN: 9781452226569.RihouxB.De MeurG.2008Crisp set qualitative comparative analysis (csQCA)In:RihouxB.RaginC. C.(eds.).Published: 2009,336810.4135/9781452226569.n3Print ISBN: 9781412942355, Online ISBN: 9781452226569Open DOISearch in Google Scholar
Skaaning, S.-E. (2011). Assessing the robustness of crisp-set and fuzzy-set QCA results. Sociological Methods & Research, 40(2), pp. 391–408.SkaaningS.-E.2011Assessing the robustness of crisp-set and fuzzy-set QCA results40239140810.1177/0049124111404818Search in Google Scholar
Strauss, A. L. and Corbin, J. M. (1998) Basics of Qualitative Research: Techniques and Procedures for Developing Grounded Theory. SAGE Publications, Thousand Oaks, California.StraussA. L.CorbinJ. M.1998SAGE PublicationsThousand Oaks, CaliforniaSearch in Google Scholar
Verweij, S., & Gerrits, L. M. (2013). Understanding and researching complexity with qualitative comparative analysis: Evaluating transportation infrastructure projects, Evaluation, 19(1), pp. 40–55.VerweijS.GerritsL. M.2013Understanding and researching complexity with qualitative comparative analysis: Evaluating transportation infrastructure projects191405510.1177/1356389012470682Search in Google Scholar
Wright, E. R., Cho, K., & Hastak, M. (2014). Assessment of critical construction engineering and management aspects of nuclear power projects. Journal of Management in Engineering, 30(4), pp. 1–11. doi: 10.1061/(ASCE)ME.1943-5479.0000286.WrightE. R.ChoK.HastakM.2014Assessment of critical construction engineering and management aspects of nuclear power projects30411110.1061/(ASCE)ME.1943-5479.0000286Open DOISearch in Google Scholar
Yin, R. K. (2003) Case Study Research: Design and Methods. 3rd edn. SAGE Publications, Thousand Oaks, CA.YinR. K.20033rd ednSAGE PublicationsThousand Oaks, CASearch in Google Scholar
Zhang, X. (2005). Improving concessionaire selection protocols in public/private partnered infrastructure projects. Journal of Construction Engineering and Management, 130(5), pp. 670–679.ZhangX.2005Improving concessionaire selection protocols in public/private partnered infrastructure projects130567067910.1061/(ASCE)0733-9364(2004)130:5(670)Search in Google Scholar