Open Access

Provoking and Foreseeing Sudden Changes in the Workability of Pumped Concrete

 and   
Jan 09, 2025

Cite
Download Cover

It was attempted to provoke and foresee sudden loss of workability during concrete pumping through a series of full-scale tests. Batches of 2 m3 concrete were produced at a ready-mix plant, transported by concrete trucks and pumped by industrial pumps, to reveal sudden loss of workability. Different mix designs, extension hoses and pump setups were utilised in a six series experiment. An experimental procedure for measuring loss of workability at a laboratory scale was developed due to the standardised procedures for slump measurements camouflaging loss of workability. The experiments revealed that pumping through a boom seems to have a positive effect by reducing probability of sudden loss of workability. Furthermore, the fine aggregate seems to have a strong influence on the phenomenon, especially in the range of 0.25 mm to 1 mm.

Language:
English
Publication timeframe:
2 times per year
Journal Subjects:
Materials Sciences, Materials Processing