Open Access

Case Study in Hypothesis Prioritization with Ishikawa Diagrams


Cite

L.K. Biban, D. Dhounchak, and Shakti. “8D Methodology: From Concept to Application Across Manufacturing Industries.” International Journal of Scientific Research in Science, Engineering and Technology. Vol. 3, pp. 558-563, 2017. Search in Google Scholar

L.K. Biban and D. Dhounchak. “8D Methodology and Its Application.” Journal of Emerging Technologies and Innovative Research. Vol. 4, pp. 533-540, 2017. Search in Google Scholar

D. Okes. Root Cause Analysis: The Core of Problem Solving and Corrective Action. Milwaukee, WI: Quality Press, 2009. Search in Google Scholar

M. Uluskan and E.P. Oda. “A Thorough Six Sigma DMAIC Application for Household Appliance Manufacturing systems: Oven Door-Panel Alignment Case,” The TQM Journal. Vol. 32, pp. 1683-1714, 2020. Search in Google Scholar

R. Ahammed and M.Z. Hasan. “Humming Noise Reduction of Ceiling Fan in the Mass Production Applying DMAIC-Six Sigma Approach,” World Journal of Engineering. Vol. 18, pp. 106-121, 2021. Search in Google Scholar

D. Mahto and A. Kumar. “Application of Root Cause Analysis in Improvement of Product Quality and Productivity,” Journal of Industrial Engineering and Management. Vol. 1, pp. 16-53, 2008. Search in Google Scholar

M.F. Suarez-Barraza. J.A. Miguel-Davila, and M.F. Morales-Contreras. “Application of Kaizen-Kata Methodology to Improve Operational Problem Processes. A Case Study in a Service Organization.” International Journal of Quality and Service Sciences. Vol. 13, pp. 29-44, 2021. Search in Google Scholar

R, W. Tuli, G.E. Apostolakis, and J.-S. Wu. “Identifying Organizational Deficiencies Through Root-Cause Analysis,” Nuclear Technology. Vol. 116, pp. 334-359, 1996. Search in Google Scholar

Y. Trakulsunti, J. Antony, M. Dempsey, and A. Brennan. “Reducing Medication Errors Using Lean Six Sigma Methodology in a Thai Hospital: An Action Research Study,” International Journal of Quality and Reliability Management. Vol. 38, pp. 339-362, 2021. Search in Google Scholar

W.A. Najmuddin, W. Saidin, A.M. Ibrahim, M.Z. Azir, H. Ngah, N.M. Noor, and M.H Norhidayah. “8D Methodology: An Effective Approach for Problem Solving in Automotive Assembly Line.” Australian Journal of Basic and Applied Sciences. Vol. 8, pp. 31-34, 2014. Search in Google Scholar

K. Ishikawa. Guide to Quality Control (2nd ed.). Translated by Asian Productivity Organization. Tokyo, Japan: Asian Productivity Organization, 1991. Search in Google Scholar

G.F. Smith. “Determining the Cause of Quality Problems: Lessons from Diagnostic Disciplines.” Quality Management Journal. Vol. 5, pp. 24-40, 1998. Search in Google Scholar

D. Mahto and A. Kumar. “Application of Root Cause Analysis in Improvement of Product Quality and Productivity,” Journal of Industrial Engineering and Management. Vol. 1, pp. 16-53, 2008. Search in Google Scholar

T.S.M. Kumar and B. Adaveesh. “Application of “8D Methodology” for the Root Cause Analysis and Reduction of Valve Spring Rejection in a Valve Spring Manufacturing Company: A Case Study,” Indian Journal of Science and Technology. Vol. 10, pp. 1-11, 2017. Search in Google Scholar

S.S. Chakravorty. “Process Improvement: Using Toyota’s A3 Reports.” Quality Management Journal. Vol. 16, pp. 7-26. 2019. Search in Google Scholar

M. Barsalou and R. Perkin, “Structured, Yet Flexible, Approach.” Six Sigma Forum Magazine. Vol. 14, pp. 22-25, 2015. Search in Google Scholar

D. Okes. Root Cause Analysis: The Core of Problem Solving and Corrective Action. Milwaukee, WI: Quality Press, 2009. Search in Google Scholar

G.F. Smith. “Determining the Cause of Quality Problems : Lessons from Diagnostic Disciplines.” Quality Management Journal. Vol. 5, pp. 24-40, 1998. Search in Google Scholar

M. Mohaghegh and A. Furlan. “Systematic Problem-Solving and its Antecedents: A Synthesis of the Literature,” Management Research Review. Vol. 43, pp. 1033-1062, 2020. Search in Google Scholar

D. Mahto and A. Kumar. “Application of Root Cause Analysis in Improvement of Product Quality and Productivity,” Journal of Industrial Engineering and Management. Vol. 1, pp. 16-53, 2008. Search in Google Scholar

J. de Mast, “Diagnostic Quality Problem Solving: A Conceptual Framework and Six Strategies,” Quality Management Journal. Vol. 20, pp. 21-36, 2013. Search in Google Scholar

M. Donauer. P. Peças, and A.L. Azevedo. “Nonconformity Tracking and Prioritization Matrix: An Approach for Selecting Nonconformities as a Contribution to the Field of TQM,” Production Planning and Control. Vol. 26, pp. 131-149, 2015. Search in Google Scholar

Verband der Automobilindustrie e. V. (VDA). Quality Management in the Automotive Industry: 8D – Problem Solving in 8 Disciplines: Method, Process, Report. Berlin, Germany: Verband der Automobilindustrie e. V. (VDA) / Qualität Management Center (QMC), 2018. Search in Google Scholar

T.S.M. Kumar and B. Adaveesh. “Application of “8D Methodology” for the Root Cause Analysis and Reduction of Valve Spring Rejection in a Valve Spring Manufacturing Company: A Case Study,” Indian Journal of Science and Technology. Vol. 10, pp. 1-11, 2017. Search in Google Scholar

T. Finlow-Bates. “The Root Cause Myth.” The TQM Magazine. Vol. 10, pp. 10-15, 1998. Search in Google Scholar

D.P. Abellana. “A Proposed Hybrid Root Cause Analysis Technique for Quality Management,” International Journal of Quality and Reliability Management. Vol. 38, pp. 704-721, 2021. Search in Google Scholar

M.S. Perry, S. Michael. “Back to Basics: A Fish (bone) Tale.” Quality Progress. Vol. 39, p. 88, 2006. Search in Google Scholar

R. Ahammed and M.Z. Hasan. “Humming Noise Reduction of Ceiling Fan in the Mass Production Applying DMAIC-Six Sigma Approach,” World Journal of Engineering. Vol. 18, pp. 106-121, 2021. Search in Google Scholar

T.S.M. Kumar and B. Adaveesh. “Application of “8D Methodology” for the Root Cause Analysis and Reduction of Valve Spring Rejection in a Valve Spring Manufacturing Company: A Case Study,” Indian Journal of Science and Technology. Vol. 10, pp. 1-11, 2017. Search in Google Scholar

S. Darekar, D.V. Pendum, P. Shukla, P. Joshi, “Systematic Fact Finding and Problem Solving for Leakage in High Pressure Line in Diesel Engine.” MR International Journal of Engineering and Technology. Vol. 5, pp. 39-44, 2013. Search in Google Scholar

A. Zarghami. and D. Benbow. An Introduction to 8D Problem Solving: Including Practical Applications and Examples. ASQ Quality Press, Milwaukee, WI, 2017. Search in Google Scholar

H.R. Chen and B.-W. Cheng. “A Case Study in Solving Customer Complaints Based on the 8Ds Method and Kano Model, ” Journal of the Chinese Institute of Industrial Engineers. Vol. 27, pp. 339-350, 2010. Search in Google Scholar

D. Mahto and A. Kumar. “Application of Root Cause Analysis in Improvement of Product Quality and Productivity,” Journal of Industrial Engineering and Management. Vol. 1, pp. 16-53, 2008. Search in Google Scholar

N.C. Anderson and J.V. Kovach. “Reducing Welding Defects in Turnaround Projects: A Lean Six Sigma Case Study,” Quality Engineering. Vol. 26, pp. 168-181, 2014. Search in Google Scholar

E.V. Gijo and P.K. Perumallu. “Quality Improvement by Reducing Variation: A Case Study,” Total Quality Management and Business Excellence. Vol. 14, pp. 1023-1031, 2003. Search in Google Scholar

K. Ishikawa. Guide to Quality Control (2nd ed.). Translated by Asian Productivity Organization. Tokyo, Japan: Asian Productivity Organization, 1991. Search in Google Scholar

N.R. Tague. The Quality Toolbox (2nd ed.). Milwaukee, WI: The ASQ Quality Press, 2005. Search in Google Scholar