Open Access

Minimization of Delay Costs in the Realization of Production Orders in Two-Machine System


Cite

[1] R. Cupek, A. Ziebinski, L. Huczala and H. Erdogan, “Agent-based manufacturing execution systems for short-series production scheduling”, Computers in Industry, vol. 82, pp. 245-258, 2016.10.1016/j.compind.2016.07.009Search in Google Scholar

[2] R. Dylewski, A. Jardzioch and I. Krebs, “The Optimal Sequence of Production Orders, Taking into Account the Cost of Delays”, Management and Production Engineering Review, vol. 7, no. 2, pp. 21-28, 2016.10.1515/mper-2016-0013Search in Google Scholar

[3] R. Germs, N.D. Van Foreest and O.A. Kilc, “Optimal policies for production-clearing systems under continuous – review”, European Journal of Operational Research, vol. 255, no. 3, pp. 747-757, 2016.10.1016/j.ejor.2016.05.004Search in Google Scholar

[4] A. Haned, A. Soukhal, M. Boudhar and N.H. Tuong, “Scheduling on parallel machines with preemption and transportation delays”, Computers & Operations Research, vol. 39, pp. 374-381, 2012.10.1016/j.cor.2011.04.013Search in Google Scholar

[5] A. Jardzioch and R. Dylewski, “Determining the minimum sum of production order delays in a two-machine system”, Management and Production Engineering Review, vol. 8, No. 3, 2017.10.1515/mper-2017-0026Search in Google Scholar

[6] A. Jardzioch, J. Jaskowski. „Calculation of the deadlines for nesting with the possibility of combining orders”. Management Systems in Production Engineering, no. 1(17), pp. 22-27, 2015. (doi: 10.12914/MSPE-04-01-2015)10.12914/MSPE-04-01-2015Open DOISearch in Google Scholar

[7] Q. Ji, Y. Wang, and X. Hu, “Optimal production planning for assembly systems with uncertain capacities and random demand”, European Journal of Operational Research, vol. 253, no. 2, pp. 393-391, 2016.10.1016/j.ejor.2016.02.021Search in Google Scholar

[8] V.K. Manupatu, G.D. Putnik, M.K. Tiwari, P. Avila and M. Cruz-Cunha, “Integration of process planning and scheduling using mobile-agent based approach in a networked manufacturing environment”, Computers & Industrial Engineering, vol. 94, pp. 63-73, 2016.10.1016/j.cie.2016.01.017Search in Google Scholar

[9] A. Negahban and J.S. Smith, “Simulation for manufacturing system design and operation: Literature review and analysis”, Journal of Manufacturing Systems, vol. 33, no. 2, pp. 241-261, 2014.10.1016/j.jmsy.2013.12.007Search in Google Scholar

[10] U. Okongwu, M. Lauras, J. Francois and J-Ch. Des-champs, “Impact of the integration of tactical supply chain planning determinants on performance”, Journal of Manufacturing Systems, vol. 38, pp. 181-194, 2016.10.1016/j.jmsy.2014.10.003Search in Google Scholar

[11] R.H. Schmitt, M. Ellerich and S. Humphrey, “Multi-objective allocation of customized orders to production-line networks”, CIRP Annals – Manufacturing Technology, vol. 65, no. 1, pp. 429-432, 2016.10.1016/j.cirp.2016.04.118Search in Google Scholar

[12] F. Shrouf, J. Ordieres-Mere, A. Garcia-Sanches and M. Ortega-Mier, “Optimizing the production scheduling of a single machine to minimize total energy consumption costs”, Journal of Cleaner Production, vol. 67, pp. 197-207, 2014.10.1016/j.jclepro.2013.12.024Search in Google Scholar