The impact of the construction of the new 400 kV transmission power lines between Slovakia and Hungary on the cross-border transmissions
, and
Nov 26, 2019
About this article
Published Online: Nov 26, 2019
Page range: 418 - 428
Received: Jun 30, 2019
DOI: https://doi.org/10.2478/jee-2019-0075
Keywords
© 2019 Marek Siranec et al., published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.
Siranec, Marek
University of Zilina, Faculty of Electrical Engineering and Information Technology, Department of Power Systems and Electric Drives
Otcenasova, Alena
University of Zilina, Faculty of Electrical Engineering and Information Technology, Department of Power Systems and Electric Drives
Bracinik, Peter
University of Zilina, Faculty of Electrical Engineering and Information Technology, Department of Power Systems and Electric Drives