Open Access

Exploring Factors Influencing of Project Management Success in Public Building Projects in Nigeria


Cite

[1] Zwikael, O., Bar-Yoseph, B. Improving the capabilities of project team management using the Gestalt cycle of experience. Team Performance Management, 10 (2004) No7. 137-144.10.1108/13527590410569850Search in Google Scholar

[2] Winter, M., Smith, C., Morris, P.W.G., Cicmil, S. Directions for future research in project management: the main findings of a UK government funded (EPSRC) research network. International Journal of Project Management. 24 (2006). No.8, 638-649.10.1016/j.ijproman.2006.08.009Search in Google Scholar

[3] Thomas, J. Problematizing project management. In D. Hodgson & S. Cicmil (Eds.), Making projects critical (2006). pp. 90-107. Hampshire: Palgrave.10.1007/978-0-230-20929-9_5Search in Google Scholar

[4] Geraldi, J., Maylor, H., Williams, T.. Now, let’s make it really complex (complicated): A systematic review of the complexities of projects. International Journal of Operations and Production Management, 31 (2011) No 9, 966-990.10.1108/01443571111165848Search in Google Scholar

[5] McHugh, O., Hogan, M. Investigating the rationale for adopting an internationally-recognised project management methodology in Ireland. International Journal of Project Management (2011), p. 2910.1016/j.ijproman.2010.05.001Search in Google Scholar

[6] Clancy, T. The Standish Group Report, 1995. http://www.projectsmart.co.uk/reports.html Chaos report.Search in Google Scholar

[7] Attarzadeh, I., Siew, H.O. Project Management practices. Success versus failure. International Symposium on Information Technology, 2008. ITSim 2008. Volume1: 1-8.10.1109/ITSIM.2008.4631634Search in Google Scholar

[8] Standish Group International. Chaos Summary 2009: the 10 laws of Chaos, International Standish Group., 2009. Pp 1-4. http://ptslideshare.net/AccelerateManagement/chaos-summary-2009-the-standardish-group [Accessed:9th December 2012]Search in Google Scholar

[9] Akuta, C. V. Inconsistent Policies and High Rate of abandoned government projects. 2009.Nigeria News. http://www.ngex.com/news/public/article.php?ArticleID=1343Search in Google Scholar

[10] Ayodele, E.O., Alabi, O. M. Abandonment of Construction Projects in Nigeria: Causes and Effects; Journal ofEmerging Trends in Economics and Management Sciences (JETEMS), Vol. 2, 2011.Iss. 2, pp. 142-145. Search in Google Scholar

[11] El-Rufai, N.A. The tragedy of abandoned projects. Nigeria Intel. 2012. http://www.nigeriaintel.comSearch in Google Scholar

[12] Abbasi, Y. G., Al-Mharmah. ‘Project management practice by the public sector in a developing country’ International Journal of Project Management, 18 (2000). No3, pp105-109.10.1016/S0263-7863(98)00074-XSearch in Google Scholar

[13] Poon, J., Potts, K., Cooper, P. Identification of Success Factors in the Construction Process. A Conference Paper Delivered at COBRA (2001) Cutting Edge and ROOTS Conference.Search in Google Scholar

[14] White, D., Fortune, J. ‘Current practice in project management - an empirical study’ International Journal of Project Management, 20 (2002) No.6, pp.1-11.10.1016/S0263-7863(00)00029-6Search in Google Scholar

[15] Baccarini, D., Collins, A. Critical Success Factors for Projects, In Brown, A. (ed), Surfing the Waves: Management Challenges; Management Solutions. Proceedings of the 17th ANZAM Conference, (2003) .2-5 December, Fremantle, Western Australia.Search in Google Scholar

[16] Arnaboldi M., Azzone G., Savoldelli A ‘managing public sector project: the case of the Italian Treasury Ministry’ International Journal of Project management, 22.(2004). No.3, pp213-223.10.1016/S0263-7863(03)00067-XSearch in Google Scholar

[17] Saqib, M., Farooqui, R.U., Lodi, S.H. Assessment of Critical Success Factors for Construction Projects in Pakistan. First International Conference on Construction in Developing Countries (ICCIDC-1)”Advancing and Integrating Construction Education, Research and Practice, ., 2008 Karachi, Pakistan, 392-404.Search in Google Scholar

[18] Idoro, G. I., Patunola-Ajayi, J. B. ‘Evaluating the strategies for marketing project management system in the Nigerian construction industry’, Nordic Journal of Surveying and Real Estate Research, 6 (2009). No.2, pp.25-36.Search in Google Scholar

[19] Ogwueleka, A. The Critical Success Factors Influencing Project Performance in Nigeria. International Journal of Management Science and Engineering Management, 6. (2011) No.5, 343-349.10.1080/17509653.2011.10671182Search in Google Scholar

[20] Omran, A., Abdulbagei, M.A., and Gebril, A.O. An Evaluation of the Critical Success Factors for Construction Projects in Libya”. International Journal of Economic Behaviour, 2, (2012)pp 17-25.Search in Google Scholar

[21] Yong, Y.E., Mustaffa, N.E. Analysis of Factors Critical to Construction Project Success in Malaysia. Engineering, Construction and Architectural Management, 19. (2012) No. 5, 1-13.10.1108/09699981211259612Search in Google Scholar

[22] Ejaz, N., Hussain, J., Shabbir, F., Shamim, M.A., Naeem , U.A., Tahir, M.F. Assessment of Most Critical Success Factors for Mega Construction Projects in Pakistan. Life Science Journal, 10. (2013) No. 10, 255-261.Search in Google Scholar

[23] Luthans, F., Davis, T.R.V. ‘An Idiographic Approach to Organizational Behavior research:The Use of Single Case Experimental Designs and Direct Measures’, Academy of Management Review, JSTOR, 1982 http://www.jstor.org.ezproxy.liv.ac.uk/stable/pdfplus/257330.pdf10.2307/257330Search in Google Scholar

[24] Sarantakos, S. Social Research, Palgrave. New York. 1988.Search in Google Scholar

25] Leedy P.D. Practical research. New York: Macmillan Publishing. 1980Search in Google Scholar

[26] Hasan, M. Kerr, R.M.”The relationship between total quality management practices and organisational performance in service organisations”. The TQM Magazine, Vol.15. (2003) Number 4. Pp 286-291.10.1108/09544780310486191Search in Google Scholar

[27] Shuttleworth, M. Construct Validity - Does the Concept Match the Specific Measurement? 2009. Explorable. com: https://explorable.com/construct-validitySearch in Google Scholar

[28] Nunnally, J.C. Psychometric Theory. 2nd Edition, McGraw-Hill, New York., 1978.Search in Google Scholar

[29] Idrus, A., Sodangi, M. Framework for Evaluating Quality Performance of Contractors in Nigeria. International Journal of Civil and Environmental Engineering, 10. (2010) No. 01:34-39.Search in Google Scholar

[30] Ibrahim, A. D. Investigating Into the Knowledge Requirements of Nigerian Quantity Surveyors to Meet FutureChallenges. 25th Biennial Conference of The NIQS, 2011 pp. 7-18. Abuja: NIQS. Search in Google Scholar

[31] Bave las, A. “Project echo: Use of projective techniques to define reality in different cultures”, Stanford University. 1968Search in Google Scholar

[32] Emuze, F. A. Performance Improvement in South African Construction. South Africa: PhD Thesis NMMU. 2011Search in Google Scholar

[33] Usman, N. A., Inuwa, I. I., Iro, A. I., Dantong, J. S. Training of Contractors Craftsmen for Productivity Improvement in the Nigerian Construction Industry. Journal of Engineering and Applied Sciences, 4, (2012) 1-12.Search in Google Scholar

[34] Iro, A. I., Inuwa, I. I., Dantong, J. S. Investigation into Contractors Craftsmen Training in the Nigerian Construction Industry. International Journal of Engineering Research and Technology, 2 (2013) No1 pp1-6.Search in Google Scholar

[35] Moser, C.A., Kalton, G. Survey methods in social investigation. UK: Heinemann Educational 1971.Search in Google Scholar

[36] Field, A. Discovering Statistics, Using SPSS for Windows. Sage Publications, London., 2005.10.53841/bpspag.2005.1.56.31Search in Google Scholar

[37] Kaiser, H. A second generation Little Jiffy. Psychometrikal, 35, (1970) 401-15.10.1007/BF02291817Search in Google Scholar

[38] Bartlett, M.S. A note on the multiplying factors for various chi square approximations. Journal of the Royal Statistical Society, 16 (1954) (Series B), 296-8.10.1111/j.2517-6161.1954.tb00174.xSearch in Google Scholar

[39] Stevens, J. Applied multivariate statistics for the social sciences 5th edition. New York (N. Y.): Routledge. 2009Search in Google Scholar

[40] Tabachnick, B.G., Fidell, L.S. Using Multivariate Statistics (5th Edn). Boston: Pearson Education. 2007Search in Google Scholar

[41] Catell, R.B The Scree Test for Number Of Factors. Multivariate Behavioural Research, 1, , (1966) pp.245-7610.1207/s15327906mbr0102_10Search in Google Scholar

[42] Horn, J. L. A rationale and test for the number of factors in factor analysis. Psychometrika, 30, (1965) 179-8510.1007/BF02289447Search in Google Scholar

[43] Hubbard, R., Allen, S.J An empirical comparison of alternative methods for principal component extraction. Journal Of Business Research, 15, (1987). 173-90.10.1016/0148-2963(84)90047-XSearch in Google Scholar

[44] Zwick, W.R., Velicer, W.F., Comparison of five rules for determining the number of components to retain. Psychological Bulleting, 99, (1986).432-4210.1037/0033-2909.99.3.432Search in Google Scholar

[45] Abubakar, A. E., Grennwood, D., Osborne, A. A Study of Project Planning on Libyan Construction Projects. ARCOM Conference ., 2008 (pp. 789-798). Cardiff UK: Dainty, A. (Ed) Proceedings of the 24th Annual ARCOM Conference, 1-3 september, 2008.Search in Google Scholar

[46] Krishnamurthy, K. G., Ravindra, S. V. Construction and Project Management: For Engineers, Planners and Builders. New Delhi: Satish Kumar J.2010.Search in Google Scholar

[47] Chitkara, K. K., 2012. Construction Project Management: Planning, Scheduling & Controlling. New Delhi: Tata McGraw-Hill.Search in Google Scholar

[48] Mbamali, I., Okotie, A. J. An Assessment of the Threats and Opportunities of Globalization on Building Practice in Nigeria. American International Journal of Contemporary Research, vol. 4 (2012) 143-150.Search in Google Scholar

[49] Muazu, D. A., Bustani, S. A. A Comparative Analysis of Litigation Among Foreign and Indigenous Construction Firms in Nigeria. ATBU Journal of Environmental Technology, 3. (2004) No1: pp13-16.Search in Google Scholar

[50] Aniekwu, A. N., Audu, H. O. The Effects of Management on Productivity: A Comparative Study of Indigenous and Foreign Firms in the Nigerian Construction Industry. Proceedings of West Africa Built Environment (WABER) Conference, 2010 (pp. 567-578). Accra-Ghana: WABER.Search in Google Scholar

[51] Ekundayo, D., Jewell, C., Awodele, O. A. Executive Project Management Structure and the Challenges Facing its Adoption in the Nigerian Construction. International Journal of Architecture, Engineering and Construction. Vol.2. (2013) No.3 pp.158-169.10.7492/IJAEC.2013.015Search in Google Scholar

eISSN:
2064-2520
Language:
English