This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.
Betterton, C. (2012). Detecting bottlenecks in serial production lines - A focus on interdeparture time variance. International Journal of Production Research, 50(15), 4158–4174. doi: 10.1080/00207543.2011.596847BettertonC.2012Detecting bottlenecks in serial production lines - A focus on interdeparture time variance50154158417410.1080/00207543.2011.596847Open DOISearch in Google Scholar
Chiang, S. Y., Kuo, C. T., & Meerkov, S. M. (2002). c-Bottlenecks in Serial Production Lines: Identification and Application. Mathematical Problems in Engineering, 7(6), 543–578. doi: 10.1109/CDC.1999.832820ChiangS. Y.KuoC. T.MeerkovS. M.2002c-Bottlenecks in Serial Production Lines: Identification and Application7654357810.1109/CDC.1999.832820Open DOISearch in Google Scholar
Christophe, F., Coatanea, E., & Bernard, A. (2014). Conceptual Design. In L. Laperrière & G. Reinhart (Eds.), Encyclopedia of Production Engineering. Berlin, Germany: Springer. doi: 10.1007/978-3-642-20617-7_6444ChristopheF.CoataneaE.BernardA.2014Conceptual DesignInLaperrièreL.ReinhartG.(Eds.),Berlin, GermanySpringer10.1007/978-3-642-20617-7_6444Open DOISearch in Google Scholar
Dongping, Z., Xitian, T., & Junha, G. (2014). A Bottleneck Detection Algorithm for Complex Product Assembly Line Based on Maximum Operation Capacity. Mathematical Problems in Engineering, 3, 1–9. doi: 10.1155/2014/258173DongpingZ.XitianT.JunhaG.2014A Bottleneck Detection Algorithm for Complex Product Assembly Line Based on Maximum Operation Capacity31910.1155/2014/258173Open DOISearch in Google Scholar
Eaidgah, Y., Maki, A., Kurczewski, K., & Abdekhodaee, A. (2016). Visual management, performance management and continuous improvement: A lean manufacturing approach. International Journal of Lean Six Sigma, 7(2), 187–210. doi: 10.1108/IJLSS-09-2014-0028EaidgahY.MakiA.KurczewskiK.AbdekhodaeeA.2016Visual management, performance management and continuous improvement: A lean manufacturing approach7218721010.1108/IJLSS-09-2014-0028Open DOISearch in Google Scholar
French, M. J. (1999). Conceptual design for engineers, 2nd ed. London, United Kingdom: The Design Council. doi: 10.1007/978-3-662-11364-6FrenchM. J.19992nd ed.London, United KingdomThe Design Council10.1007/978-3-662-11364-6Open DOISearch in Google Scholar
Hino, S. (2006). Inside the Mind of Toyota. New York, United States: Productivity Press.HinoS.2006New York, United StatesProductivity PressSearch in Google Scholar
Ikeziri, L. M., Souza, F. B. D., Gapta, M. C., & Camargo Fiorini, P. D. (2018). Theory of constraints: review and bibliometric analysis. International Journal of Production Research, 57(15–16), 5068–5102. doi: 10.1080/00207543.2018.1518602IkeziriL. M.SouzaF. B. D.GaptaM. C.Camargo FioriniP. D.2018Theory of constraints: review and bibliometric analysis5715–165068510210.1080/00207543.2018.1518602Open DOISearch in Google Scholar
Koliński, A., & Tomkowiak, A. (2010). Using the analysis of bottlenecks in production management. Gospodarka Materiałowa i Logistyka, 9, 16–21.KolińskiA.TomkowiakA.2010Using the analysis of bottlenecks in production management91621Search in Google Scholar
Law, A. M., & Kelton, D. W. (2000). Simulation Modeling & Analysis. McGraw Hill.LawA. M.KeltonD. W.2000McGraw HillSearch in Google Scholar
Lawrence, S. R., & Buss, A. H. (1994). Shifting production bottlenecks: causes, cures, and conundrums. Production and Operations Management, 3(1), 21–37. doi: 10.1111/j.1937-5956.1994.tb00107LawrenceS. R.BussA. H.1994Shifting production bottlenecks: causes, cures, and conundrums31213710.1111/j.1937-5956.1994.tb00107Open DOISearch in Google Scholar
Li, R., Hamada, K., & Shimozori, T. (2010). Erratum to: Development of a Theory of Constraints Based Scheduling System for Ship Piping Production. Journal of Shanghai Jiaotong University (Science), 15(3), 354–362. doi: 10.1007/s12204-010-1041-zLiR.HamadaK.ShimozoriT.2010Erratum to: Development of a Theory of Constraints Based Scheduling System for Ship Piping Production15335436210.1007/s12204-010-1041-zOpen DOISearch in Google Scholar
Liker, J. (2004). The Toyota Way: 14 Management Principles from the World's Greatest Manufacturer. New York, United States: McGraw-Hill.LikerJ.2004New York, United StatesMcGraw-HillSearch in Google Scholar
Lisiecka, K. (2013). TLS-Composition of Methods for Improving the Production Management System. Problemy Jakości, 7–8, 48–53.LisieckaK.2013TLS-Composition of Methods for Improving the Production Management System7–84853Search in Google Scholar
Łopatowska, J. (2008). Aplication of TOC Thinking process in change of production planning and control process. Logistyka, 2, 86–94.ŁopatowskaJ.2008Aplication of TOC Thinking process in change of production planning and control process28694Search in Google Scholar
Łopatowska, J. (2017). Planning the implementation of projects in multi project environment using a critical chain. Zeszyty Naukowe Politechniki Śląskiej: Organizacja i Zarządzanie, 114, 303–316.ŁopatowskaJ.2017Planning the implementation of projects in multi project environment using a critical chain114303316Search in Google Scholar
Puchkova, A., Le Romancer, J., & McFarlane, D. E. (2016). Balancing Push and Pull Strategies within the Production System. IFAC, 49(2), 66–71. doi: 10.1016/j.ifacol.2016.03.012PuchkovaA.Le RomancerJ.McFarlaneD. E.2016Balancing Push and Pull Strategies within the Production System492667110.1016/j.ifacol.2016.03.012Open DOISearch in Google Scholar
Robert, J., Bizzaro, P., & Selfe, C. (1997). The Harcourt Brace Guide to Writing in the Disciplines, New York, United States: Harcourt Brace.RobertJ.BizzaroP.SelfeC.1997New York, United StatesHarcourt BraceSearch in Google Scholar
Roser, C., Lorentzen, K., & Deuse, J. (2014). Reliable Shop Floor Bottleneck Detection for Flow Lines through Process and Inventory Observations. Robust Manufacturing Conference, Procedia CIRP, 19, 63–68. doi: 10.1016/j.procir.2014.05.020RoserC.LorentzenK.DeuseJ.2014Reliable Shop Floor Bottleneck Detection for Flow Lines through Process and Inventory Observations19636810.1016/j.procir.2014.05.020Open DOISearch in Google Scholar
Roser, Ch., Masaru, N., & Minoru, T. (2002). Shifting Bottleneck Detection. Winter Simulation Conference, edited by Enver Yucesan, CA, 1079–1086. doi: 10.1109/WSC.2002.1166360RoserCh.MasaruN.MinoruT.2002Shifting Bottleneck Detection1079108610.1109/WSC.2002.1166360Open DOISearch in Google Scholar
Rother, M., & Shook, J. (1999). Learning to See: Value Stream Mapping to Add Value and Eliminate MUDA. Cambridge, United States: Lean Enterprise Institute.RotherM.ShookJ.1999Cambridge, United StatesLean Enterprise InstituteSearch in Google Scholar
Sims, T., & Wan, H. (2017). Constraint identification techniques for lean manufacturing systems. Robotics and Computer-Integrated Manufacturing, 43, 50–58. doi: 10.1016/j.rcim.2015.12.005SimsT.WanH.2017Constraint identification techniques for lean manufacturing systems43505810.1016/j.rcim.2015.12.005Open DOISearch in Google Scholar
Skołud, B. (2006). Zarządzanie operacyjne-produkcja w małych i średnich przedsiębiorstwach [Operational management - production in small and medium-sized enterprises]. Gliwice, Polska: Wydawnictwo Politechniki Śląskiej.SkołudB.2006[Operational management - production in small and medium-sized enterprises].Gliwice, PolskaWydawnictwo Politechniki ŚląskiejSearch in Google Scholar
Skołud, B. (2009). Decision making in the area of production flow management. Inżynieria Maszyn, 14(3), 7–18.SkołudB.2009Decision making in the area of production flow management143718Search in Google Scholar
Thompson, G. (1999). Improving maintainability and reliability through design. London, United Kingdom: Professional Engineering Publishing.ThompsonG.1999London, United KingdomProfessional Engineering PublishingSearch in Google Scholar
Thürera, M., & Stevenson, M. (2018). Bottleneck-oriented order release with shifting bottlenecks: An assessment by simulation. International Journal of Production Economics, 197, 275–282. doi: 10.1016/j.ijpe.2018.01.010ThüreraM.StevensonM.2018Bottleneck-oriented order release with shifting bottlenecks: An assessment by simulation19727528210.1016/j.ijpe.2018.01.010Open DOISearch in Google Scholar
Trojanowska, J., & Koliński, A. (2015). The impact of the application of TOC tools on selected indicators of production process efficiency. Logistyka, 4, 7–11.TrojanowskaJ.KolińskiA.2015The impact of the application of TOC tools on selected indicators of production process efficiency4711Search in Google Scholar
Urban, W. (2019). TOC implementation in a medium-scale manufacturing system with diverse product rooting. Production & Manufacturing Research, 7(1), 178–194. doi: 10.1080/21693277.2019.1616002UrbanW.2019TOC implementation in a medium-scale manufacturing system with diverse product rooting7117819410.1080/21693277.2019.1616002Open DOISearch in Google Scholar
Woeppel, M. J. (2009). Manufacturers Guide to Implementing Theory of Constraints. Warszawa, Poland: Mint Books.WoeppelM. J.2009Warszawa, PolandMint BooksSearch in Google Scholar
Womack, J. P., & Jones, D. T. (1996). Lean Thinking: Banish Waste and Create Wealth in Your Corporation. New York, United States: Simon & Schuster.WomackJ. P.JonesD. T.1996New York, United StatesSimon & Schuster10.1038/sj.jors.2600967Search in Google Scholar
Wrodarczyk, J. (2013). Two-Criteria Model of Product Mix Based on the Theory of Constraints. Studia Ekonomiczne, 163, 239–252.WrodarczykJ.2013Two-Criteria Model of Product Mix Based on the Theory of Constraints163239252Search in Google Scholar
Yua, Ch., & Matta, A. (2016). A statistical framework of data-driven bottleneck identification in manufacturing systems. International Journal of Production Research, 54(21), 6317–6332. doi: 10.1080/00207543.2015.1126681YuaCh.MattaA.2016A statistical framework of data-driven bottleneck identification in manufacturing systems54216317633210.1080/00207543.2015.1126681Open DOISearch in Google Scholar