Monitoring of Wastewater Parameters in Treatment Plants: Case Study – WWTP of Iasi City
, , and
Feb 19, 2025
About this article
Published Online: Feb 19, 2025
Page range: 63 - 78
Received: Apr 04, 2022
Accepted: Apr 29, 2022
DOI: https://doi.org/10.2478/bipca-2022-0015
Keywords
© 2022 Costel-Cătălin Prăjanu et al., published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Prăjanu, Costel-Cătălin
“Gheorghe Asachi” Technical University of Iași, Faculty of Hydrotechnical Engineering, Geodesy and Environmental EngineeringIași, România
Stătescu, Florian
“Gheorghe Asachi” Technical University of Iași, Faculty of Hydrotechnical Engineering, Geodesy and Environmental EngineeringIași, România
Toma, Daniel
“Gheorghe Asachi” Technical University of Iași, Faculty of Hydrotechnical Engineering, Geodesy and Environmental EngineeringIași, România
Toma, Cristina-Mihaela Vîrlan
“Gheorghe Asachi” Technical University of Iași, Faculty of Hydrotechnical Engineering, Geodesy and Environmental EngineeringIași, România