Construction and Optimization of Dynamic Assessment Indicators for Distribution Grid Carrying Capacity with High Proportion of Distributed Resource Connections
, , , , and
Jun 03, 2024
About this article
Published Online: Jun 03, 2024
Received: Feb 07, 2024
Accepted: Apr 21, 2024
DOI: https://doi.org/10.2478/amns-2024-1352
Keywords
© 2024 Zhongqiang Zhou et al., published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.
Zhou, Zhongqiang
Department of Automation, Dispatching & Control Center of Guizhou Power GridGuiyang, China
Wen, Yuan
Power Dispatching & Control Center, Kaili Power Supply Bureau of Guizhou Power GridKaili, China
Jiang, Dan
Power Dispatching & Control Center, Tongren Power Supply Bureau of Guizhou Power GridTongren, China
Deng, Ruifeng
Power Dispatching & Control Center, Xingyi Power Supply Bureau of Guizhou Power GridXingyi, China
Ma, Jianwei
Department of Automation, Dispatching & Control Center of Guizhou Power GridGuiyang, China
Meng, Jingrong
Shanghai Jiao Tong University Sichuan Research InstituteChengdu, China