Results of the “DPDT-Auger” Research Project on Screw Displacement Piles
Published Online: Oct 20, 2023
Page range: 89 - 99
Received: Jan 26, 2023
Accepted: Feb 26, 2023
DOI: https://doi.org/10.2478/acee-2023-0036
Keywords
© 2023 Adam Krasiński et al., published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
The main objective of the “DPDT-Auger” research project was to test the prototype DPDT auger for forming screw displacement piles in the ground (patented in Poland in 2020). An additional aim was to develop design methods and rules for the making of such piles. The augers and piles were first tested on a model scale, and then more extensively in the real scale on experimental field plots. The results found the overall functionality of the DPDT auger to be good, and in several aspects better than that of the SDP auger. The load-bearing capacities and