Location | Length of surveyed section [m]. | Chloride content of street cleaning wastewater [mg/dm3] | ||
---|---|---|---|---|
Average | Value min. | Value of max. | ||
Access street | 700 (One-way, 2-day left/right experiment), | 500 | 965 | 34,1 |
118 | 210 | 25 | ||
Alley Krasińskiego | 1020 (two-way, three-day experiment full width) | 394 | 762 | 25.6 |
Street Porucznika Halszki | 770 (two-way, three-day experiment full width) | 385 | 749 | 25 |
Street Bulwarowa | 550 (two-way, three-day experiment full width) | 34 | 52,9 | 15 |
Location | Chloride content in street cleaning wastewater [mg/dm3] after summer | Chloride content in street cleaning wastewater [mg/dm3] after winter | ||||
---|---|---|---|---|---|---|
Average | Value min. | Value of max. | Average | Value min. | Value of max. | |
Streets 1 | 35.42 | 29.3 | 41.4 | 362.75 | 321.6 | 399.8 |
Streets 2 (sewage wells) | 59.8255 | 45.6 | 71.9 | 1467.93 | 1201.4 | 1732.8 |
Streets 3 (washing the streets) | 43.886 | 38.3 | 49.3 | 421.73 | 436.3 | 468.5 |
Pedestrian walkway | 36.42 | 25.8 | 46.2 | 53.13 | 45.9 | 59.2 |