This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
The Construction Specifications Institute (CSI) (2011). Construction contract administration: practice guide; The Construction Specifications Institute, Wiley, NJ.Search in Google Scholar
Saudi Council of Engineers (SCE); www.Saudieng.Sa/English/Pages/Default.Aspx.Search in Google Scholar
Al Musallami, A., and Assaf, S. (1996). Public owners’ satisfaction with consultancy practices in Saudi Arabia; Building Research and Information, 24(3), 148–151.10.1080/09613219608727518Search in Google Scholar
Adrian, J. (1981). CM: the construction management process, Reston Publishing Company; Reston, Virginia.Search in Google Scholar
Al-Shammari, M. (2010). AHP model for engineering consultant selection in Saudi Arabia, Master Report, Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia.Search in Google Scholar
Cushman, R. F., and Palmer, W. J. (1980). Businessman’s guide to construction; Dow Jones Books, Princeton, NJ.Search in Google Scholar
Ng, S. T., and Chow, L. K. (2004a). Evaluating engineering consultants’ general capabilities during the pre-selection process – a Hong Kong study; Engineering, Construction and Architectural Management 11(3), 150–158.10.1108/09699980410535769Search in Google Scholar
Al-Besher, M. F. S. (1998). A conceptual model for consultant selection in Saudi Arabia, Master Thesis; Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia.Search in Google Scholar
Love, P., Edwards, D., Sangwon, H. (2011). Design error reduction: towards the effective utilization of building information modelling; Research in Engineering Design 22(3), 173–187.10.1007/s00163-011-0105-xSearch in Google Scholar
Cheung, F. K. T., Kuen, J. L. F., Skitmore, M. (2002). Multi-criteria evaluation model for the selection of architectural consultants, Construction Management and Economics, 20(7), 569y–580.10.1080/01446190210159818Search in Google Scholar
Moore, W. (1986). Selecting a consultant engineer; Journal of Professional Issues in Engineering 112(4) 224–226.10.1061/(ASCE)1052-3928(1986)112:4(224)Search in Google Scholar
Kasma, D. (1987). Consultant selection; Journal of Management in Engineering 3(4) 288–296.10.1061/(ASCE)9742-597X(1987)3:4(288)Search in Google Scholar
Potter, K. J. and Sanvido, V. (1995). Implementing a design/build prequalification systems; Journal of Management in Engineering 11(3), 30–34.10.1061/(ASCE)0742-597X(1995)11:3(30)Search in Google Scholar
Al-Sobiei, O. S., Assaf, S., Arditi, D. (1996). Construction claims in residential building projects in Saudi Arabia; International Journal for Housing Science and its Applications 20(2), 79–89.Search in Google Scholar
Assaf, S., Al-Hammad, A., Al-Shihah, M. (1996). Effects of faulty design and construction on building maintenance; Journal of Performance of Constructed Facilities 10(4), 171–174.10.1061/(ASCE)0887-3828(1996)10:4(171)Search in Google Scholar
Ling, Y. Y. (2002). Model for predicting performance of architects and engineers; Journal of Construction Engineering and Management 128(5), 446–455.10.1061/(ASCE)0733-9364(2002)128:5(446)Search in Google Scholar
Ling, Y. Y. (2003). A conceptual model for selection of architects by project managers in Singapore; International Journal of Project Management 21, 135–144.10.1016/S0263-7863(02)00014-5Search in Google Scholar
Abdulwahab, M. F. (2006). Evaluation of consultant performance, Master Thesis; Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia.Search in Google Scholar
Sporrong, J. (2011). Criteria in consultant selection: public procurement of architectural and engineering services; Australian Journal of Construction Economics and Building 11(4), 59–76.10.5130/AJCEB.v11i4.2297Search in Google Scholar
Chow, L. K. and Ng, S. T. (2007); Expectation of performance levels pertinent to consultant performance evaluation; International Journal of Project Management 25(1), 90–103.10.1016/j.ijproman.2006.08.007Search in Google Scholar
Basham, A. P. (1983). Consultant selection: the two envelope system of bidding; Industrial Marketing Management 12(4), 271–279.10.1016/S0019-8501(83)80007-8Search in Google Scholar
Ng, S. T., and Chow, L. K. (2004). Framework for evaluating the performance of engineering consultants; Journal of Professional Issues in Engineering Education and Practice 130(4), 280–288.10.1061/(ASCE)1052-3928(2004)130:4(280)Search in Google Scholar
Ng, S. T. (2004). Factors pertinent to the selection of architectural and building services consultants; HKIE Transactions, 11(3), 42–49.10.1080/1023697X.2004.10667967Search in Google Scholar
Omar, M. F., Trigunarsyah, B., and Wong, J. (2009). A design science approach for consultant selection decision support system; Proceedings of the 4th International Conference on Cooperation and Promotion of Information Resources in Science and Technology, November 21-23, Beijing, China, IEEE Computer Society, 90–94.10.1109/COINFO.2009.73Search in Google Scholar
Foden, H. (1991). How to hire a consultant; Economic Development Review, 9(2), 52–56.Search in Google Scholar
Zavadskas, E. K., Vilutiene, T. (2006); A multiple criteria evaluation of multi-family apartment block’s maintenance contractors: I – Model for maintenance contractor evaluation and the determination of its selection criteria; Building and Environment, 41(5), 621–632.10.1016/j.buildenv.2005.02.019Search in Google Scholar
Darvish, M., Yasaei, M., Saeedi, A. (2009). Application of the graph theory and matrix methods to contractor ranking; International Journal of Project Management, 27(6) 610–619.10.1016/j.ijproman.2008.10.004Search in Google Scholar
Plebankiewicz, E. (2010). Construction contractor prequalification from Polish clients’ perspective; Journal of Civil Engineering and Management, 16(1), 57–64.10.3846/jcem.2010.05Search in Google Scholar
Plebankiewicz, E. (2012). A fuzzy sets based contractor prequalification procedure; Automation in Construction, 22, 433–443.10.1016/j.autcon.2011.11.003Search in Google Scholar
Nieto-Morote, A., Ruz-Vila, F. (2012). A fuzzy multicriteria decision-making model for construction contractor prequalification; Automation in Construction, 25, 8–19.10.1016/j.autcon.2012.04.004Search in Google Scholar
Zhang, Y., and Fan, Z. (2014). An optimization method for selecting project risk response strategies; International Journal of Project Management, 32(3), 412–422.10.1016/j.ijproman.2013.06.006Search in Google Scholar
Canada, J. R., Sullivan, W. G., Kulonda, D. J, White, J. A. (2005). Capital investment analysis for engineering and management; 3rd Ed., Prentice Hall, NJ.Search in Google Scholar
Traintaphyllou, E. (2000). Multi-criteria decision making methods: a comparative study; Springer, The Netherlands.10.1007/978-1-4757-3157-6Search in Google Scholar
Saaty, T. L. (1994). Fundamentals of decision making and priority theory with the analytic hierarchy process; RWS Publications.Search in Google Scholar
Hwang, C. L., Yoon, K. (1981). Multiple attribute decision making: methods and applications; SpringerVerlag, NY.10.1007/978-3-642-48318-9Search in Google Scholar
Yoon, K. (1987). A reconciliation among discrete compromise situations; Journal of Operational Research Society, 38(3), 277–286.10.1057/jors.1987.44Search in Google Scholar
Figueira, J., Greco, S., Ehrgott, M. (2005). Multiple criteria decision analysis: state of the art surveys; International Series in Operations Research and Management Science, 78, Springer, NY.10.1007/b100605Search in Google Scholar
Expert Choice software (2015). Expert Choice software for collaborative decision making, http://expertchoice.com/Search in Google Scholar