Open Access

A SYSTEMATIC APPROACH FOR THE SELECTION OF THE ARCHITECT/ENGINEER PROFESSIONAL IN CONSTRUCTION PROJECTS


Cite

The Construction Specifications Institute (CSI) (2011). Construction contract administration: practice guide; The Construction Specifications Institute, Wiley, NJ. Search in Google Scholar

Saudi Council of Engineers (SCE); www.Saudieng.Sa/English/Pages/Default.Aspx. Search in Google Scholar

Al Musallami, A., and Assaf, S. (1996). Public owners’ satisfaction with consultancy practices in Saudi Arabia; Building Research and Information, 24(3), 148–151.10.1080/09613219608727518 Search in Google Scholar

Adrian, J. (1981). CM: the construction management process, Reston Publishing Company; Reston, Virginia. Search in Google Scholar

Al-Shammari, M. (2010). AHP model for engineering consultant selection in Saudi Arabia, Master Report, Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia. Search in Google Scholar

Cushman, R. F., and Palmer, W. J. (1980). Businessman’s guide to construction; Dow Jones Books, Princeton, NJ. Search in Google Scholar

Ng, S. T., and Chow, L. K. (2004a). Evaluating engineering consultants’ general capabilities during the pre-selection process – a Hong Kong study; Engineering, Construction and Architectural Management 11(3), 150–158.10.1108/09699980410535769 Search in Google Scholar

Al-Besher, M. F. S. (1998). A conceptual model for consultant selection in Saudi Arabia, Master Thesis; Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia. Search in Google Scholar

Love, P., Edwards, D., Sangwon, H. (2011). Design error reduction: towards the effective utilization of building information modelling; Research in Engineering Design 22(3), 173–187.10.1007/s00163-011-0105-x Search in Google Scholar

Cheung, F. K. T., Kuen, J. L. F., Skitmore, M. (2002). Multi-criteria evaluation model for the selection of architectural consultants, Construction Management and Economics, 20(7), 569y–580.10.1080/01446190210159818Search in Google Scholar

Moore, W. (1986). Selecting a consultant engineer; Journal of Professional Issues in Engineering 112(4) 224–226.10.1061/(ASCE)1052-3928(1986)112:4(224) Search in Google Scholar

Kasma, D. (1987). Consultant selection; Journal of Management in Engineering 3(4) 288–296.10.1061/(ASCE)9742-597X(1987)3:4(288) Search in Google Scholar

Potter, K. J. and Sanvido, V. (1995). Implementing a design/build prequalification systems; Journal of Management in Engineering 11(3), 30–34.10.1061/(ASCE)0742-597X(1995)11:3(30) Search in Google Scholar

Al-Sobiei, O. S., Assaf, S., Arditi, D. (1996). Construction claims in residential building projects in Saudi Arabia; International Journal for Housing Science and its Applications 20(2), 79–89. Search in Google Scholar

Assaf, S., Al-Hammad, A., Al-Shihah, M. (1996). Effects of faulty design and construction on building maintenance; Journal of Performance of Constructed Facilities 10(4), 171–174.10.1061/(ASCE)0887-3828(1996)10:4(171) Search in Google Scholar

Ling, Y. Y. (2002). Model for predicting performance of architects and engineers; Journal of Construction Engineering and Management 128(5), 446–455.10.1061/(ASCE)0733-9364(2002)128:5(446) Search in Google Scholar

Ling, Y. Y. (2003). A conceptual model for selection of architects by project managers in Singapore; International Journal of Project Management 21, 135–144.10.1016/S0263-7863(02)00014-5 Search in Google Scholar

Abdulwahab, M. F. (2006). Evaluation of consultant performance, Master Thesis; Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia. Search in Google Scholar

Sporrong, J. (2011). Criteria in consultant selection: public procurement of architectural and engineering services; Australian Journal of Construction Economics and Building 11(4), 59–76.10.5130/AJCEB.v11i4.2297 Search in Google Scholar

Chow, L. K. and Ng, S. T. (2007); Expectation of performance levels pertinent to consultant performance evaluation; International Journal of Project Management 25(1), 90–103.10.1016/j.ijproman.2006.08.007 Search in Google Scholar

Basham, A. P. (1983). Consultant selection: the two envelope system of bidding; Industrial Marketing Management 12(4), 271–279.10.1016/S0019-8501(83)80007-8 Search in Google Scholar

Ng, S. T., and Chow, L. K. (2004). Framework for evaluating the performance of engineering consultants; Journal of Professional Issues in Engineering Education and Practice 130(4), 280–288.10.1061/(ASCE)1052-3928(2004)130:4(280) Search in Google Scholar

Ng, S. T. (2004). Factors pertinent to the selection of architectural and building services consultants; HKIE Transactions, 11(3), 42–49.10.1080/1023697X.2004.10667967 Search in Google Scholar

Omar, M. F., Trigunarsyah, B., and Wong, J. (2009). A design science approach for consultant selection decision support system; Proceedings of the 4th International Conference on Cooperation and Promotion of Information Resources in Science and Technology, November 21-23, Beijing, China, IEEE Computer Society, 90–94.10.1109/COINFO.2009.73 Search in Google Scholar

Foden, H. (1991). How to hire a consultant; Economic Development Review, 9(2), 52–56. Search in Google Scholar

Zavadskas, E. K., Vilutiene, T. (2006); A multiple criteria evaluation of multi-family apartment block’s maintenance contractors: I – Model for maintenance contractor evaluation and the determination of its selection criteria; Building and Environment, 41(5), 621–632.10.1016/j.buildenv.2005.02.019 Search in Google Scholar

Darvish, M., Yasaei, M., Saeedi, A. (2009). Application of the graph theory and matrix methods to contractor ranking; International Journal of Project Management, 27(6) 610–619.10.1016/j.ijproman.2008.10.004 Search in Google Scholar

Plebankiewicz, E. (2010). Construction contractor prequalification from Polish clients’ perspective; Journal of Civil Engineering and Management, 16(1), 57–64.10.3846/jcem.2010.05 Search in Google Scholar

Plebankiewicz, E. (2012). A fuzzy sets based contractor prequalification procedure; Automation in Construction, 22, 433–443.10.1016/j.autcon.2011.11.003 Search in Google Scholar

Nieto-Morote, A., Ruz-Vila, F. (2012). A fuzzy multicriteria decision-making model for construction contractor prequalification; Automation in Construction, 25, 8–19.10.1016/j.autcon.2012.04.004 Search in Google Scholar

Zhang, Y., and Fan, Z. (2014). An optimization method for selecting project risk response strategies; International Journal of Project Management, 32(3), 412–422.10.1016/j.ijproman.2013.06.006 Search in Google Scholar

Canada, J. R., Sullivan, W. G., Kulonda, D. J, White, J. A. (2005). Capital investment analysis for engineering and management; 3rd Ed., Prentice Hall, NJ. Search in Google Scholar

Traintaphyllou, E. (2000). Multi-criteria decision making methods: a comparative study; Springer, The Netherlands.10.1007/978-1-4757-3157-6 Search in Google Scholar

Saaty, T. L. (1994). Fundamentals of decision making and priority theory with the analytic hierarchy process; RWS Publications. Search in Google Scholar

Hwang, C. L., Yoon, K. (1981). Multiple attribute decision making: methods and applications; SpringerVerlag, NY.10.1007/978-3-642-48318-9 Search in Google Scholar

Yoon, K. (1987). A reconciliation among discrete compromise situations; Journal of Operational Research Society, 38(3), 277–286.10.1057/jors.1987.44 Search in Google Scholar

Figueira, J., Greco, S., Ehrgott, M. (2005). Multiple criteria decision analysis: state of the art surveys; International Series in Operations Research and Management Science, 78, Springer, NY.10.1007/b100605 Search in Google Scholar

Expert Choice software (2015). Expert Choice software for collaborative decision making, http://expertchoice.com/Search in Google Scholar

eISSN:
1899-0142
Language:
English
Publication timeframe:
4 times per year
Journal Subjects:
Architecture and Design, Architecture, Architects, Buildings