Engineering and Economic Preconditioning for Draining of the PWiK Facilities in Głogów
Jul 08, 2017
About this article
Published Online: Jul 08, 2017
Page range: 3 - 14
DOI: https://doi.org/10.1515/sgem-2017-0019
Keywords
© 2012 Urszula Kołodziejczyk, published by De Gruyter Open
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.
The facilities belonging to Przedsiębiorstwo Wodociągów i Kanalizacji (PWiK) in Głogów have been erected on the floodplain of the Odra river. In consequence, they are in a state of permanent dampness or flooded. Therefore, the need has arisen for indicating an effective method of draining the facilities. In the paper, four different methods of solving the problem have been indicated which are differentiated in both engineering and economic respects.