[[1] DODGE, F. (1943). A sampling plan for continuous production. Ann.Math.Statist.14,3,264-279.10.1214/aoms/1177731420]Open DOISearch in Google Scholar
[[2] OHTA, H. and KASE, S. (1984). GERT analysis of economic design of Dodges CSP - 1 Continuous sampling plan under inspection error. Frontiers in Quality Control, 2, Ed. by Lenz et al., 247-260. Physica-Verlag.]Search in Google Scholar
[[3] MASON, S.J. (1953). Some properties of signal flow graphs. Proc. IRE, 41, 9, 1144-1156.10.1109/JRPROC.1953.274449]Search in Google Scholar
[[4] GAURISHANKAR and MOHOPATRA, B.N. (1994); GERT analysis of dodges CSP-1 continuous sampling plan, The Indian journal of Statistics vol.56, No.3, pp 468-478]Search in Google Scholar
[[5] VEERAKUMARI, K.P. and RESMI, R. (2016) ; Designing optimum plan parameters for continuous sampling plan of type (CSP-2) through GERT analysis, Journal of Statistics and Management Systems vol.19, No.2, pp 303-311.]Search in Google Scholar
[[6] PRITSKER, A.A.B. and WHITEHOUSE, G.E. (1966). GERT; Pt. II - Probabilistic and industrial engineering applications. Jour. Ind. Engg. 17, 293-301.]Search in Google Scholar
[[7] GHOSH, D.T. (1988). A continuous sampling plan that minimizes the amount of inspection. Sankhya, 50, Ser. B, Pt. 3, 412-427.]Search in Google Scholar
[[8] GOVINDARAJU, K. (1989). Procedures and tables for the selection of CSP - 1 plans. Jour. Quality Technology, 21, 1, 46-50.10.1080/00224065.1989.11979138]Search in Google Scholar
[[9] CLEVE MOLER (December 2004). The Orgins of MATLAB. Retrieved 15 April 2007.]Search in Google Scholar
[[10] MATHWORKS. FUNCTION HANDLES. Retrieved 14 August 2013.]Search in Google Scholar