[
Abdous, M. A., Finco, S., Visentin, V., 2018. Workload evaluation of industrial work: Existing methods and practical applications, Proceedings of the Summer School Francesco Turco, 395–401.
]Search in Google Scholar
[
Abeid, A. H., 2015. Investigation of workplace environment: The case of selected micro and small manufacturing enterprises in Tanzania, International Journal of Engineering Research & Technology (IJERT), 4(6), 827–832.
]Search in Google Scholar
[
Adiasa, I., Suarantalla, R., Rafi, M. S., Hermanto, K., 2020. Perancangan ulang tata letak fasilitas pabrik di CV. Apindo Brother Sukses menggunakan metode systematic layout planning (SLP), Performa: Media Ilmiah Teknik Industri, 19(2), 151–158, DOI: 10.20961/performa.19.2.43467 (in Indonesian)
]Search in Google Scholar
[
Adiyanto, O., Clistia, A. F., 2020. Perancangan ulang tata letak fasilitas produksi UKM Eko Bubut dengan metode computerized relationship layout planning (CORELAP), Jurnal Integrasi Sistem Industri, 7(1), 49–56. (in Indonesian)
]Search in Google Scholar
[
Adiyanto, O., Paldo, K. M. R., 2019. Perancangan tata letak fasilitas produksi UKM Eko Bubut menggunakan metode automated layout design program (ALDEP), Teknoin, 25(2), 66–79, DOI: 10.20885/teknoin.vol25.iss2.art1 (in Indonesian)
]Search in Google Scholar
[
Akbilek, N., 2018. Ergonomic assessment and workplace design in dairy processing industry, Advances in Social & Occupational Ergonomics, AHFE 2017, Springer, Cham, 295–306, DOI: 10.1007/978-3-319-60828-0_30
]Search in Google Scholar
[
Al-Haq, Z., Antara, N. S., Hartiati, A., 2015. Perancangan tata letak ulang (relayout) pabrik terhadap tingkat produksi produk bakso ayam (studi kasus pada pabrik bakso UD. Supra Dinasty Denpasar), Jurnal Rekayasa dan Manajemen Agroindustri, 3(2), 80–91. (in Indonesian)
]Search in Google Scholar
[
Amalia, R. R., Ariyani, L., Noor, M., 2018. Perancangan ulang tata letak fasilitas industri tahu untuk meminimalkan material handling dengan algoritma blocplan di UD. Pintu Air, Jurnal Teknologi Agro-Industri, 4(2), 89–100, DOI: 10.34128/jtai.v4i2.54 (in Indonesian)
]Search in Google Scholar
[
Amri, Meutia, S., Syuaib, M., 2015. Perancangan ulang tata letak pabrik menggunakan metode systematic layout planning (SLP) pada UD. Indaco Bireun, Prosiding SNTI 2015, Lhokseumawe, Aceh, Indonesia, 195–203. (in Indonesian)
]Search in Google Scholar
[
Anggraini, F., Sunarni, T., 2019. Usulan perbaikan tata letak dengan menggunakan metode fraktal (studi kasus di perusahaan mebel X), Jurnal Metris, 20, 89–102. (in Indonesian)
]Search in Google Scholar
[
Anisa, N., 2014. Alternatif tata letak fasilitas (mesin) menggunakan cellular manufacturing system di UD. Tri Rejeki Madiun, Jurnal Agri-Tek, 15(2), 1–8. (in Indonesian)
]Search in Google Scholar
[
Anthara, I. M. A., 2010. Usulan perbaikan tata letak lantai produksi dengan metode CRAFT untuk meminimasi ongkos material handling (studi kasus CV. Karya Mekar Bandung), Majalah Ilmiah UNIKOM, 8(1), 107–118. (in Indonesian)
]Search in Google Scholar
[
Anwar, A., Bakhtiar, B., Nanda, R., 2015. Usulan perbaikan tata letak pabrik dengan menggunakan systematic layout planning (SLP) di CV. Arasco Bireuen, Malikussaleh Industrial Engineering Journal, 4(2), 4–10. (in Indonesian)
]Search in Google Scholar
[
Arif, M., Sulastri., 2017. Perancangan ulang lay out pabrik tahu Makmur Jaya di Dumai, Prosiding Semnas Teknik 2017, Dumai, Indonesia, 106–116. (in Indonesian)
]Search in Google Scholar
[
Arios, A. L., 2020. Usulan perbaikan layout produksi garam di CV. X sebagai upaya meningkatkan efisiensi, efektifitas dan penerapan SNI garam, Majalah Teknologi Agro Industri (Tegi), 12(2), 53–57. (in Indonesian)
]Search in Google Scholar
[
Ariyanti, S., Widodo, L., Zulkarnain, M., Timotius, K., 2019. Design work station of pipe welding with ergonomic approach, Sinergi, 23(2), 107–114, DOI: 10.22441/sinergi.2019.2.003
]Search in Google Scholar
[
Astuti, M., Poerwanto, E., Trianingsih, A., 2017. Analisis tata letak fasilitas dengan menggunakan metode activity relationship chart pada industri mebel bambu Karya Manunggal Yogyakarta, Prosiding SENATIK 2017, Yogyakarta, Indonesia, DOI: 10.28989/senatik.v3i0.137 (in Indonesian)
]Search in Google Scholar
[
Baleshzar, A., Tabbodi, M., 2019. The relationship of environmental architecture with the level of job satisfaction and productivity among the employees of Islamic Azad University, Shiraz Branch, Journal of Health Managament & Informatics, 6(1), 22–27.
]Search in Google Scholar
[
Ben-Gal, I., Bukchin, J., 2002. The ergonomic design of workstations using virtual manufacturing and response surface methodology, IIE Transactions (Institute of Industrial Engineers), 34(4), 375–391, DOI:/10.1080/07408170208928877
]Search in Google Scholar
[
Cahyono, B. D., Simanjuntak, R. A., Oesman, T. I., 2018. Usulan perancangan tata letak parik dengan metode systematic layout planning pada WL Alumunium, Prosiding IENACO 2018, Surakarta, Indonesia, 233–240. (in Indonesian)
]Search in Google Scholar
[
Castellone, R., Spada, S., Sessa, F., Cavatorta, M. P., 2017. A simple multi-body 2d-model for early postural checks in workplace design, International Journal of Applied Engineering Research, 12(23), 13451–13461.
]Search in Google Scholar
[
Corlett, E. N., Clark, T. S., 2009. The Ergonomics of Workspaces and Machines: A Design Manual, Taylor & Francis Ltd., London.
]Search in Google Scholar
[
Czaja, S. J., Nair, S. N., 2006. Human Factors Engineering and Systems Design, Handbook of Human Factors and Ergonomics, John Wiley & Sons, Inc., 32–49, DOI: 10.1002/0470048204.ch2
]Search in Google Scholar
[
Daya, M. A., Sitania, F. D., Profita, A., 2018. Perancangan ulang tata letak fasilitas produksi dengan metode blocplan (Studi kasus: UKM Roti Rizki, Bontang), Performa: Media Ilmiah Teknik Industri, 17(2), 140–145, DOI: 10.20961/performa.17.2.29664 (in Indonesian)
]Search in Google Scholar
[
Deros, B. M., Khamis, N. K., Ismail, A. R., Jamaluddin, H., Adam, A. M., Rosli, S., 2011. An ergonomics study on assembly line workstation design, American Journal of Applied Sciences, 8(11), 1195–1201, DOI: 10.3844/ajassp.2011.1195.1201
]Search in Google Scholar
[
Dewa, K. B., Mulia, A., Yunitasari, D. P., 2018. Perancangan tata letak dan fasilitas menggunakan metode simulasi untuk meminimasi biaya material handling, Prosiding IENACO 2018, Surakarta 295–300. (in Indonesian)
]Search in Google Scholar
[
Dewi, L. T., Sari, M. H. R. S. R., Dewi, C., Ariyono, V., 2015. Implementasi prinsip ekonomi gerakan untuk pengaturan tata letak fasilitas kerja pada pemrosesan batu alam, Performa, 14(2), 149–156, DOI: 10.20961/performa.14.2.11488 (in Indonesian)
]Search in Google Scholar
[
Dianat, I., Vahedi, A., Dehnavi, S., (2016). Association between objective and subjective assessments of environmental ergonomic factors in manufacturing plants, International Journal of Industrial Ergonomics, 54, 26–31, DOI: 10.1016/j.ergon.2015.12.004
]Search in Google Scholar
[
Djunaidi, M., Nugroho, M. T., Anton, J., 2006. Simulasi group technology system untuk meminimalkan biaya material handling dengan metode heuristic, Jurnal Ilmiah Teknik Industri, 4(3), 129–138. (in Indonesian)
]Search in Google Scholar
[
Dragcevic, Z., Kirin, S., Saravanja, B., 2011. A method of workplace design for sewing operations, Proceedings of the 22nd International DAAAM Symposium, DAAAM International, Vienna, Austria, 379–380.
]Search in Google Scholar
[
Faishal, M., Pratama, M. A., 2019. Perancangan ulang tata letak fasilitas perusahaan sandal hotel dengan metode ARC untuk mengurangi waste, Jurnal Teknologi, 12(2), 116–122. (in Indonesian)
]Search in Google Scholar
[
Faishal, M., Putra, M. K., 2019. Perancangan ulang tata letak fasilitas industri sandal dengan metode CORELAP, Jurnal Material dan Proses Manufaktur, 3(2), 116–125, DOI: 10.18196/jmpm.3245 (in Indonesian)
]Search in Google Scholar
[
Faiz, A. H., Fadhlurrohman, N., Salsabila, Z. F., 2019. Perancangan tata letak fasilitas pada UKM Tajusa Drumband menggunakan pendekatan simulasi guna menurunkan ongkos material handling, Prosiding IENACO 2019, Surakarta, Indonesia, 53–60. (in Indonesian)
]Search in Google Scholar
[
Fatoni, R., Mayasari, H. D., Sholaika, A. M., Susanto, Y., 2013. Perancangan ulang tata letak pabrik dan analisa keselamatan dan kesehatan kerja (studi kasus CV Okabawes Karya Logam), Prosiding Simposium Nasional RAPI XII, Surakarta, Indonesia, 52–59. (in Indonesian)
]Search in Google Scholar
[
Febianti, E., Herlina, L., Khoiriah, F., 2011. Relayout fasilitas produksi dengan menggunakan algoritma blocplan, Teknika: Jurnal Sains dan Teknologi, 7(2), 125–133. (in Indonesian)
]Search in Google Scholar
[
Fulder, T., Pizmoht, P., Polajnar, A., Leber, M., 2005. Ergonomically designed workstation based on simulation of worker’s movements, International Journal of Simulation & Modelling, 4(1), 27–34, DOI: 10.2507/IJSIMM04(1)3.038
]Search in Google Scholar
[
Gunanti, N. A., Subagyo, A. M., Herwanto, D., Arifin, J., 2021. Optimasi tata letak fasilitas menggunakan algoritma blocplan dan corelap. Journal of Industrial and Manufacture Engineering, 5(2), 107–120, DOI: 10.31289/jime.v5i2.5555 (in Indonesian)
]Search in Google Scholar
[
Hamzah, A., 2020. Perancangan ulang tata letak fasilitas produksi dengan metode systematic layout planning (SLP) dan 5S di CV. Seken Living, IEJST (Industrial Engineering Journal of The University of Sarjanawiyata Tamansiswa), 4(1), 10–21. (in Indonesian)
]Search in Google Scholar
[
Hendrawan, D., Mulyati, D. S., 2021. Usulan perancangan ulang tata letak fasilitas dengan metode algoritma corelap di CV. X, Industrial Engineering Science, 1(1), 31–38. (in Indonesian)
]Search in Google Scholar
[
Hermawati, S., Lawson, G., Sutarto, A. P., 2014. Mapping ergonomics application to improve SMEs working condition in industrially developing countries: a critical review, Ergonomics, 57(12), 1771–1794, DOI: 10.1080/00140139.2014.953213
]Search in Google Scholar
[
Herwanto, D., Suzianti, A., 2020. An Environmental Ergonomics Review of Small Medium Enterprises Workplace Condition in Indonesia, Proceedings of the 3rd Asia Pacific Conference on Research in Industrial and Systems Engineering 2020, ACM, New York, 213–218, DOI: 10.1145/3400934.3400974
]Search in Google Scholar
[
Hidayat, N. P. A., 2012. Perancangan tata letak departemen finishing pabrik CV. SG-Bandung, Jurnal Teknik Industri, 2(2), 137–146. (in Indonesian)
]Search in Google Scholar
[
Husen, T. A., Suryadhini, P. P., Astuti, M. D., 2020. Perancangan tata letak fasilitas untuk meminimasi jarak material handling pada UKM XYZ menggunakan metode ALDEP, Prosiding IDEC 2020, Surakarta, Indonesia, A08.1-A08.12. (in Indonesian)
]Search in Google Scholar
[
ILO, 2013. Keselamatan dan Kesehatan Kerja: Sarana untuk Produktivitas. International Labour Office, Jakarta. (in Indonesian)
]Search in Google Scholar
[
ILO, 2014. Hari Keselamatan dan Kesehatan se-Dunia 2014: Mempromosikan budaya keselamatan di usaha kecil menengah di Indonesia. https://www.ilo.org/jakarta/info/public/pr/WCMS_241780/lang--en/index.htm (in Indonesian)
]Search in Google Scholar
[
Irmanto, I. N., Darmawan, M. I., Ningsih, Y., 2021. Perancangan ulang tata letak fasilitas pabrik dalam upaya efisiensi material handling di UD. Donesi, Jurnal Teknologi Pertanian Andalas, 25(1), 16–24, DOI: 10.25077/jtpa.25.1.16-24.2021 (in Indonesian)
]Search in Google Scholar
[
Jaya, J. D., Nuryati, Audinawati, S. A. N., 2017. Perancangan ulang tata letak fasilitas produksi UD. Usaha Berkah berdasarkan activity relationship chart (ARC) dengan aplikasi blocplan-90, Jurnal Teknologi Agro-Industri, 4(2), 111–123, DOI: 10.34128/jtai.v4i2.56 (in Indonesian)
]Search in Google Scholar
[
Kalijaga, M. A., Restiana, R., Fadhlurrohman, N., 2018. Perancangan tata letak fasilitas pada UKM A3 aluminium Yogyakarta menggunakan software Flexsim 6.0, Prosiding IENACO 2018, Surakarta, Indonesia, 178–184. (in Indonesian)
]Search in Google Scholar
[
Kartika, I. M., 2014. Perancangan tata letak area produksi dengan menggunakan ARC pada CV Gading Putih di Semarang, CALYPTRA, 3(1), 1–18. (in Indonesian)
]Search in Google Scholar
[
Kumalasari, E., Puspitorini, P. S., Putra, A. C., Ernes, A., 2019. Activity relationship chart sebagai perancangan tata letak fasilitas miniplant pada produksi chips porang di Desa Jembul, Prosiding SNP2M UNIM 2018, Mojokerto, Indonesia, 83–88. (in Indonesian)
]Search in Google Scholar
[
Kurniawan, I. D., Susetyo, J., Simanjuntak, R. A., 2020. Perancangan ulang tata letak fasilitas produksi dengan metode systematic layout planning (SLP) dan peta tangan kanan tangan kiri proses perakitan, Jurnal Rekavasi, 8(2), 13–22. (in Indonesian)
]Search in Google Scholar
[
Kuswanto, Junius, J., Sembiring, A. C., 2020. Perbaikan tata letak lantai produksi industri mebel menggunakan metode grafik dan algoritma craft, Jurnal Rekayasa Sistem Industri, 6(1), 2–6. (in Indonesian)
]Search in Google Scholar
[
Launis, M., Vuori, M., Lehtelä, J., 1996. Who is the workplace designer? — Towards a collaborative mode of action, International Journal of Industrial Ergonomics, 17(4), 331–341, DOI: 10.1016/0169-8141(95)00058-5
]Search in Google Scholar
[
Lee, Q., Amundsen, A. E., Nelson, W., Tuttle, H., 1997. Facilities and Work-place Design: An Illustrated Guide, first ed.. Engineering & Management Press, Norcross, Georgia.
]Search in Google Scholar
[
Linauliyamara, R. R., Nurcahyati, Muqaffi, M. S., 2018. Perancangan tata letak fasilitas produksi wajan TS Putra Yogyakarta, Prosiding IENACO 2018, Surakarta, Indonesia, 322–329. (in Indonesian)
]Search in Google Scholar
[
Lubis, P. S., Dewi, H. A. R. N., Selvi, E., 2022. Redesain tata letak pabrik gula dalam meningkatkan efesiensi dan produktivitas CV. Rizki Abadi, J-MAS (Jurnal Manajemen dan Sains), 7(1), 120–132, DOI: 10.33087/jmas.v7i1.342 (in Indonesian)
]Search in Google Scholar
[
Marmaras, N., Nathanael, D., 2012. Workplace Design. Handbook of Human Factors and Ergonomics, fourth ed. John Wiley & Sons, Inc., Hoboken, New Jersey.
]Search in Google Scholar
[
Martha, N. S., Ardiansah, I., 2020. Usulan perbaikan tata letak fasilitas produksi industri kopi studi kasus CV. Tri Anom Agrotektur, Jurnal Rekayasa Sistem Industri, 5(2), 125–133. (in Indonesian)
]Search in Google Scholar
[
Morena, Y., Siska, M., 2011. Perancangan ulang tata letak fasilitas pabrik pembuatan batu bata (Studi kasus: Kulim, Pekanbaru). Prosiding Seminar Nasional Teknologi Informasi Komunikasi dan Industri (SNTIKI) III 2011, Pekanbaru, Indonesia, 405–413. (in Indonesian)
]Search in Google Scholar
[
Mubarok, H., Lukmandono., 2017. Perancangan ulang tata letak fasilitas dengan pendekatan metode systematic layout planning guna meningkatkan produktivitas di CV. Putra Perkasa, Prosiding Sntekpan Itats V 2017, Surabaya, Indonesia, 129–134. (in Indonesian)
]Search in Google Scholar
[
Mufti, D., Ikhsan, A., Putri, T. M., 2019. Workplace Ergonomic Risk Assessment Toward Small-Scale Household Business, IOP Conference Series: Materials Science and Engineering, 528(1), 012013. DOI: 10.1088/1757-899X/528/1/012013
]Search in Google Scholar
[
Mulyati, G. T., Wagiman, Madyana, A. M., 2004. Perancangan tata letak vertikal pembuatan emping melinjo, Agritech, 24(2), 59–64. (in Indonesian)
]Search in Google Scholar
[
Muralidaran, V. M., Arun, V., Siddarth, R. S., Krishna, S. A., 2017. Ergo-nomic considerations for design of industrial workstation: A review, International Research Journal of Engineering and Technology (IRJET), 04(10), 276–281.
]Search in Google Scholar
[
Nelfiyanti, Rani, A. M., Ramadhan, A. I., 2016. Perancangan sistem informasi dan tata letak fasilitas produksi tas CV. Banua dengan menggunakan algoritma corelap, Prosiding Semnastek 2016, Jakarta, Indonesia, 1–6. (in Indonesian)
]Search in Google Scholar
[
Nugeroho, A. A. U., 2021. Usulan perbaikan tata letak fasilitas pabrik tahu dengan metode systematic layout planning, Jurnal Optimasi Teknik Industri (JOTI), 3(2), 65–69, DOI: 10.30998/joti.v3i2.10452 (in Indonesian)
]Search in Google Scholar
[
Nurhasanah, N., Simawang, B. P., 2013. Perbaikan rancangan tata letak lantai produksi di CV. XYZ, Jurnal Al-Azhar Indonesia Seri Sains dan Teknologi, 2(2), 81–90, DOI: 10.36722/sst.v2i2.128 (in Indonesian)
]Search in Google Scholar
[
Oktarini, D., Suryani, F., Madagaskar, Rosyidah, M., 2019. Modernization of facility layout design in earthenware craft industry with green productivity approach, IOP Conference Series: Materials Science and Engineering, 620(1), 012114, DOI: 10.1088/1757-899X/620/1/012114
]Search in Google Scholar
[
Pambudi, Y. D. S., Sari, I. A., 2019. Alternatif perancangan tata letak mesin produksi di CV. Anugerah Sukses Sejahtera, JISO: Journal of Industrial and Systems Optimization, 2(2), 49–54. (in Indonesian)
]Search in Google Scholar
[
Patra, O., Ramadhan, R., 2020. Usulan perbaikan tata letak fasilitas departemen produksi dengan algoritma craft (Studi kasus di CV. Grand Manufacturing Indonesia), Sistemik (Jurnal Ilmiah Nasional Bidang Ilmu Teknik), 08(02), 34–41. (in Indonesian)
]Search in Google Scholar
[
Pramesti, M., Subagyo, H. S. H., Aprilia, A., 2019. Perencanaan ulang tata letak fasilitas produksi keripik nangka dan usulan keselamatan kesehatan kerja di UMKM Duta Fruit Chips, Kabupaten Malang, Agrisocionomics: Jurnal Sosial Ekonomi dan Kebijakan Pertanian, 3(2), 150–164. (in Indonesian)
]Search in Google Scholar
[
Prasetya, Y. Y., Runtuk, J. K., Hartanti, L. P. S., 2015. Analisis tata letak fasilitas dalam meminimasi material handling (Studi kasus: perusahaan roti Matahari), Jurnal Gema Aktualita, 4(1), 1–10. (in Indonesian)
]Search in Google Scholar
[
Pratiwi, I., Muslimah, E., Aqil, A. W., 2012. Perancangan tata letak fasilitas di industri tahu menggunakan blocplan, Jurnal Ilmiah Teknik Industri, 11(2), 102–112. (in Indonesian)
]Search in Google Scholar
[
Putra, Y. P., 2018. Merancang tata letak fasilitas pabrik dengan metode algoritma corelap di CV. Robbani Singosari, Jurnal Valtech, 1(1), 65–70. (in Indonesian)
]Search in Google Scholar
[
Qisthani, N. N., Sitorus, I. A., Lusianti, H. A., 2021. Perancangan dan simulasi tata letak pabrik untuk mengoptimalkan biaya material handling dengan menggunakan algoritma craft dan activity relationship chart pada industri kerajinan bambu, Journal of Industrial Engineering: Scientific Journal on Research and Application of Industrial System, 6(1), 35–41, DOI: 10.33021/jie.v6i1.1433 (in Indonesian)
]Search in Google Scholar
[
Rajak, S., 2018. Optimasi Tata Letak Fasilitas Produksi Menggunakan Algoritma Genetika. Universitas Islam Indonesia. (in Indonesian)
]Search in Google Scholar
[
Ramaditya, A. R., Sunardi, Santoso, B., 2017. Analisis kebisingan suara mesin untuk perancangan tata letak mesin pada CV Mitra Baru Teknik, Tekmapro: Journal of Industrial Engineering and Management, 12(02), 56–66. (in Indonesian)
]Search in Google Scholar
[
Rengganis, E., Mauidzoh, U., 2021. Re-layout penempatan fasilitas produksi dengan menggunakan metode systematic layout planning dan metode 5 S guna meminimalkan biaya material handling, Jurnal Rekayasa Industri (JRI), 3(1), 31–40, DOI: 10.37631/jri.v3i1.289 (in Indonesian)
]Search in Google Scholar
[
Rokhmani, E. W., Desiyanto, F., Harsadi, D. I., 2021. Perencanaan tata letak fasilitas mesin produksi menggunakan metode activity relationship chart (ARC) di CV. Yasri Cipta Mandiri, Jurnal Pendidikan dan Aplikasi Industri (UNISTEK), 8(2), 107–112. (in Indonesian)
]Search in Google Scholar
[
Rozak, A., Kristanto, A. D., Raharjo, G. S., Saleh, N. A., 2021. Penerapan ARC dan ARD untuk membuat rancangan layout fasilitas pada pabrik kerupuk menggunakan blocplan di CV Arto Moro, Bulletin of Applied Industrial Engineering Theory, 2(2), 145–149. (in Indonesian)
]Search in Google Scholar
[
Samsudin, L. M., Afma, V. M., Purbasari, A., 2014. Perancangan ulang tata letak pabrik jamur tiram menggunakan metode activity relationship chart untuk meningkatkan produktivitas (Studi kasus CV. Mandiri Tiban III), Profesiensi, 2(1), 19–27. (in Indonesian)
]Search in Google Scholar
[
San, G. S., Wahjudi, D., 2000. Analisa tata letak pabrik untuk meminimalisasi material handling pada pabrik koper, Jurnal Teknik Mesin, 2(1), 41–49. (in Indonesian)
]Search in Google Scholar
[
Sanjog, J., Patel, T., Karmakar, S., 2019. Occupational ergonomics research and applied contextual design implementation for an industrial shop-floor workstation, International Journal of Industrial Ergonomics, 72, 188–198. DOI: 10.1016/j.ergon.2019.05.009
]Search in Google Scholar
[
Santos, M. S. e., 2012. The PhOCoe Model - ergonomic pattern mapping in participatory design processes, Work, 41, 2643–2650. DOI: 10.3233/WOR-2012-0507-2643
]Search in Google Scholar
[
Santoso, Halim, C., 2012. Usulan tata letak fraktal untuk pabrik baru dari CV Prima Bangun Nusantara, INASEA, 13(2), 100–108. (in Indonesian)
]Search in Google Scholar
[
Saputra, B., Arifin, Z., Merjani, A., 2020. Improvement of facility layout using systematic layout planning (slp) method to reduce material movement distance (Case study at UKM Kerupuk Karomah), Profisiensi, 8(1), 71–82. (in Indonesian)
]Search in Google Scholar
[
Sari, S. A., 2012. Desain stasiun kerja proses pelunakkan dan pembengkokkan rotan untuk peningkatan produktivitas di UD. Rukun Rotan-Balearjosari Malang, Industri Inovatif, 2(2), 42–46. (in Indonesian)
]Search in Google Scholar
[
Sembiring, A. C., Sitanggang, D., Budiman, I., Aloina, G., 2019. Redesign layout of production floor facilities using algorithm CRAFT, IOP Conference Series: Materials Science and Engineering, 505(1), 012016. DOI: 10.1088/1757-899X/505/1/012016
]Search in Google Scholar
[
Setiyawan, D. T., Qudsiyyah, D. H., Mustaniroh, S. A., 2017. Usulan perbaikan tata letak fasilitas produksi kedelai goreng dengan metode blocplan dan corelap (Studi kasus pada UKM MMM di Gading Kulon, Malang), Industria: Jurnal Teknologi dan Manajemen Agroindustri, 6(1), 51–60. DOI: 10.21776/ub.industria.2017.006.01.7 (in Indonesian)
]Search in Google Scholar
[
Shamusideen, K., Ukpomwan, N., 2014. Industrial Workplace Design and Physiological Consideration of Work in Developing Countries, Les Actes de La Deuxième Conférence Internationale Sur : L’application de l’ergonomie Dans Les Pays En Voie de Développement, Alger, 37–51.
]Search in Google Scholar
[
Siahaan, R. C., Oktiarso, T., 2018. Perancangan tata letak lantai produksi baru dengan metode systematic layout planning, Journal of Integrated System, 1(2), 161–179. (in Indonesian)
]Search in Google Scholar
[
Siska, M., Henriadi., 2012. Perancangan fasilitas pabrik tahu untuk meminimalisasi material handling, Jurnal Teknik Industri, 13(2), 133–141. DOI: 10.22219/JTIUMM.Vol13.No2.133-141 (in Indonesian)
]Search in Google Scholar
[
Siska, M., Retno, D., Sari, M., Hartati, M., Nur, M., 2019. Rancang ulang tata letak fasilitas pabrik dengan metode systematic layout planning dan simulasi arena di industri pallet kayu, Prosiding SNTIKI 11, Pekanbaru, Indonesia, 656–667. (in Indonesian)
]Search in Google Scholar
[
Siska, M., Risman, F., 2017. Rancang ulang tata letak CV. Sumber Vulkanisir Super menggunakan metode konvensional dan craft, Jurnal Sains dan Teknologi Industri, 14(2), 225–233. (in Indonesian)
]Search in Google Scholar
[
Siska, M., Sabri, F., 2016. Perancangan ulang tata letak pabrik vulkanisir ban, Prosiding SNTIKI 8 - 2016, Pekanbaru, Indonesia, 341–352. (in Indonesian)
]Search in Google Scholar
[
Sitohang, R. B., Anthara, I. M. A., 2017. Usulan perbaikan layout lantai produksi produk spare part saringan oli motor di CV. Grand Manufacturing Indonesia, INAQUE: Journal of Industrial & Quality Engineering, 6(1), 57–66. (in Indonesian)
]Search in Google Scholar
[
Suhardini, D., Rahmawati, S. D., 2019. Design and improvement layout of a production floor using automated layout design program (ALDEP) and CRAFT algorithm at CV. Aji Jaya Mandiri, IOP Conference Series: Materials Science and Engineering, 528(1), 1–8. DOI: 10.1088/1757-899X/528/1/012062
]Search in Google Scholar
[
Sutalaksana, I. Z., Widyanti, A., 2016. Anthropometry approach in workplace redesign in Indonesian Sundanese roof tile industries, International Journal of Industrial Ergonomics, 53, 299–305. DOI: 10.1016/j.ergon.2016.03.002
]Search in Google Scholar
[
Syaichu, A., Nurhuda, W., 2021. Perencanaan ulang stasiun kerja untuk meminimalkan biaya material handling menggunakan metode ARC (activity relationship chart) dan FTC (from to chart) CV Karsa Galih Kusuma, Jurnal Ilmu-Ilmu Teknik - Sistem, 17(3), 9–19. (in Indonesian)
]Search in Google Scholar
[
Syarif, A. A., Bedros, R. O., 2017. Rancangan ulang tata letak pabrik dengan menggunakan blocplan (studi kasus di UD. Roti Jamal), Juitech, 01(02), 103–113. (in Indonesian)
]Search in Google Scholar
[
Tahir, S., Syukriah, Baidhawi, S., 2015. Usulan perbaikan tata letak fasilitas dengan menggunakan algoritma CRAFT, Malikussaleh Industrial Engineering Journal, 4(2), 36–41. (in Indonesian)
]Search in Google Scholar
[
Tanjung, W. N., Harimansyah, F. H., 2014. Usulan perbaikan tata letak fasilitas lantai produksi produk sepatu perlengkapan dinas harian (Studi kasus pada CV. Mulia), JIEMS: Journal of Industrial Engineering & Management Systems, 7(1), 39–53. (in Indonesian)
]Search in Google Scholar
[
Teicholz, E., 2004. Facility Design and Management Handbook. McGraw-Hill, New York.
]Search in Google Scholar
[
Trisusanto, D., Bariyah, C., Kristanto, A., 2020. Design of ergonomic work facilities on assembly station of mozaic stone for increasing work productivity, Asia-Pacific Journal of Science and Technology, 25(1), 1–11.
]Search in Google Scholar
[
Wahyuni, R. S., Safitri, A. A., 2014. Metode CRAFT berbantuan perangkat lunak WinQsb untuk usulan perbaikan tata letak fasilitas V2.0 pada industri dompet CV. X, Jurnal Teknologi dan Rekayasa, 19(3), 15–23. (in Indonesian)
]Search in Google Scholar
[
Wang, Q., Mei, Q., Liu, S., Zhang, J., 2018. Analysis of managing safety in small enterprises: Dual-effects of employee prosocial safety behavior and government inspection, BioMed Research International, 2018, 1–12, DOI: 10.1155/2018/6482507
]Search in Google Scholar
[
Wati, P. E. D. K., Singgih, M., 2019. Perancangan ulang tata letak fasilitas dengan memperhatikan aspek ergonomi lingkungan, Jurnal Teknologi dan Terapan Bisnis (JTTB), 2(2), 33–41. (in Indonesian)
]Search in Google Scholar
[
Wiati, N. M., Zaman, M. Z., Kautsar, F., 2021. Analisis dan perancangan ulang tata letak fasilitas produksi dengan metode systematic layout planning, Journal of Industrial View, 3(2), 55–63. DOI: 10.26905/jiv.v3i2.6678 (in Indonesian)
]Search in Google Scholar
[
Wibawa, T., 2010. Perancangan stasiun kerja dengan pendekatan human centered design (studi kasus pada industri kecil emping melinjo), Jurnal Optimasi Sistem Industri, 3(1), 30–38. (in Indonesian)
]Search in Google Scholar
[
Wicaksana, B. I. A., Nugroho, Y. J. D., 2017. Pendekatan antropometri dalam perancangan ulang stasiun kerja penyoletan guna mengurangi kelelahan fisik dan psikis karyawan akibat kerja, Tekinfo: Jurnal Ilmiah Teknik Industri dan Informasi, 6(1), 1689–1699. DOI: 10.31001/tekinfo.v6i1.387 (in Indonesian)
]Search in Google Scholar
[
Wijayanti, A. T., Nova, T. S., Suroso, H. C., 2021. Perancangan ulang tata letak fasilitas (re-layout) pada produksi kerupuk di UD. Sekar, Prosiding Seminar Nasional Teknologi Industri Berkelanjutan I (SENASTITAN I), Surabaya, Indonesia, 159–169. (in Indonesian)
]Search in Google Scholar
[
Yunanto, T. B. C., Donoriyanto, D. S., Tranggono, 2020. Rancangan tata letak fasilitas produksi menggunakan automated layout design program di perusahaan makanan, Juminten: Jurnal Manajemen Industri dan Teknologi, 1(3), 25–36. DOI: 10.33005/juminten.v1i3.79 (in Indonesian)
]Search in Google Scholar