Continuous Logic and Scheduling in Systems with Indeterminate Processing Times
03 ott 2014
INFORMAZIONI SU QUESTO ARTICOLO
Pubblicato online: 03 ott 2014
Pagine: 38 - 47
DOI: https://doi.org/10.2478/sh-2014-0004
Parole chiave
© 2014
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.
A general approach to the synthesis of an optimal order of executing jobs in engineering systems with indeterminate (interval) times of job processing is presented. As a mathematical model of the system, a two-stage pipeline is taken whose first and second stages are, respectively, the input of data and its processing, and the corresponding mathematical apparatus is continuous logic and logic determinants.