Preliminary geophysical investigation for road construction using integrated methods
Pubblicato online: 31 mag 2019
Pagine: 199 - 206
Ricevuto: 27 gen 2018
Accettato: 15 ago 2018
DOI: https://doi.org/10.2478/rmzmag-2018-0017
Parole chiave
© 2018 Joel Olayide Amosun et al., published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.
Integrated geophysical methods have been used to investigate the competency of the subsoil. The geophysical surveys conducted involve very low-frequency electromagnetic (VLF-EM) and electrical resistivity (ER) methods (dipole-dipole). ABEM Wadi and Ohmega resistivity meter were used to acquire VLF-EM and ER data, respectively, along two traverses. Station interval of 5 m was used for the VLF-EM survey, while inter-electrode spacing for dipole–dipole was 10 m; the inter-dipole expansion factor (