Consolidating the roles of financial feasibility studies: Property developers vs quantity surveyors
e
08 ago 2024
INFORMAZIONI SU QUESTO ARTICOLO
Categoria dell'articolo: Research Paper
Pubblicato online: 08 ago 2024
Pagine: 136 - 149
Ricevuto: 09 gen 2024
Accettato: 26 giu 2024
DOI: https://doi.org/10.2478/otmcj-2024-0011
Parole chiave
© 2024 Rolien Terblanche et al., published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.
Fig. 1:

Fig. 2:

Fig. 3:

Review of the studies
Study | Reference | Location | Methods | Population & sampling | Findings |
---|---|---|---|---|---|
1 | Australia | Literature review | N/A | Methods to improve feasibilities and roles of feasibilities | |
2 | Ghana | Literature review and case study | One mine | Found an average cost overrun of 25% and methods to improve feasibilities to fit some roles | |
3 | Indonesia | Semi-systematic literature review and case study | One hotel | Factors that influence the quality of feasibilities as well as the role of a feasibility from the developer’s perspective | |
4 | China and the UK | Questionnaire survey and business case analysis | Three cost and commercial management practices, each from the two countries | Comparing the UK and China’s cost management systems (including feasibilities), and proposing a neutral framework for both to use | |
5 | India/worldwide | Literature review | N/A | Factors that influence the success of feasibilities and methods to improve feasibilities to fit some roles | |
6 | Czech Republic | Case study | One office building | Life cycle costing is seen as part of the role of a feasibility | |
7 | Pakistan | Questionnaire | Client, consultants and contractor: 56 responses | Roles of feasibilities | |
8 | Malaysia | Questionnaire | QSs, architects and engineers: 52 responses | Roles of feasibilities | |
9 | South Africa | Interviews | Six developers in commercial sector | Feasibilities in South Africa are prone to overestimate the forecasted income. Factors influencing the success of feasibilities in terms of roles | |
10 | Kenya | Interviews and questionnaires | Real estate developers: 5 interviews and 69 questionnaires. Estate agents: 5 interviews and 36 questionnaires within Nairobi City County | The effect of off-plan sales (including the use of feasibility studies and the developers’ perspective) | |
11 | South Africa | Questionnaire and interviews | QS, engineers and project managers responded to questionnaires. Three interviews: 2 QS and 1 project manager | Complete and thorough studies are not conducted in South Africa. South Africa requires the development of tailored procedures/standards for feasibilities. Feasibilities do not follow best practices. Reported on the roles of feasibilities |
Codes, frequency and quotes
Code | Freq. | Quotes |
---|---|---|
Secure income | 2 | ‘… |
Tool to advice | 3 | |
Early involvement | 2 | |
Specialist field | 2 | |
Company success | 2 | |
Reputation | 7 | |
Acceptable depth | 1 | ‘… |
Negotiations with tenants | 4 | |
Negotiations for land | 3 | ‘ |
Progress and performance measurement | 2 | ‘… |
Basis for as-built feasibility | 1 | ‘ |
Manage risks | 1 | ‘ |
Assurance of return | 2 | ‘ |
Business plan | 1 | |
Gate keeper | 6 | |
Solve problems | 1 | ‘ |
Sensitivity analysis | 2 | ‘ |
Value engineering | 2 | ‘ |
Negotiations of professional fees | 3 | ‘… |
Acquire financing | 5 | |
Budget | 12 | ‘… |
Cost control | 9 | ‘ |
Decision-making tool | 12 | ‘ |