This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Abdullah, A. S., Ali, N. S., & Abdullah, P. A. (2019). Laborer's efficiency of gypsum plastering in Sulaimani city's projects. Kurdistan Journal of Applied Research (KJAR), 4(2), pp. 24–39.AbdullahA. S.AliN. S.AbdullahP. A.2019Laborer's efficiency of gypsum plastering in Sulaimani city's projectsKurdistan Journal of Applied Research (KJAR)422439Search in Google Scholar
Aqlan, S. A. (2014). Impact of engineering software on construction project management in Bahrain. Applied Mechanics and Materials, 501, pp. 2614–2618.AqlanS. A.2014Impact of engineering software on construction project management in BahrainApplied Mechanics and Materials5012614261810.4028/www.scientific.net/AMM.501-504.2614Search in Google Scholar
Asiedu, R. O., Frempong, N. K., & Alfen, H. W. (2017). Predicting likelihood of cost overrun in educational projects. Engineering, Construction and Architectural Management, 24, pp. 21–39. doi: 10.1108/ECAM-06-2015-0103.AsieduR. O.FrempongN. K.AlfenH. W.2017Predicting likelihood of cost overrun in educational projectsEngineering, Construction and Architectural Management24213910.1108/ECAM-06-2015-0103Open DOISearch in Google Scholar
Barber, R. B. (2005). Understanding internally generated risks in projects. International Journal of Project Management, 23(8), pp. 584–590. doi: 10.1016/j.ijproman.BarberR. B.2005Understanding internally generated risks in projectsInternational Journal of Project Management23858459010.1016/j.ijpromanOpen DOISearch in Google Scholar
Barraza, G. A., Back, W. E., & Mata, F. (2004). Probabilistic forecasting of project performance using stochastic S curves. Journal of Construction Engineering and Management, 130(1), pp. 25–32. doi: 10.1061/(ASCE)0733-9364.BarrazaG. A.BackW. E.MataF.2004Probabilistic forecasting of project performance using stochastic S curvesJournal of Construction Engineering and Management1301253210.1061/(ASCE)0733-9364Open DOISearch in Google Scholar
Briec, W., Kerstens, K., & Peypoch, N. (2012). Exact relations between four definitions of productivity indices and indicators. Bulletin of Economic Research, 64(2), pp. 265–274. doi: 10.1111/j.1467-8586.2010.00 378.BriecW.KerstensK.PeypochN.2012Exact relations between four definitions of productivity indices and indicatorsBulletin of Economic Research64226527410.1111/j.1467-8586.2010.00 378Open DOISearch in Google Scholar
Briš, R., & Litschmannová, M. (2004). STATISTIKA I. pro kombinované a distanční studium, Elektronické skriptum VŠB TU Ostrava. https://homel.vsb.cz/~bri10/Teaching/Statistika1BrišR.LitschmannováM.2004STATISTIKA I. pro kombinované a distanční studium, Elektronické skriptum VŠB TU Ostravahttps://homel.vsb.cz/~bri10/Teaching/Statistika1Search in Google Scholar
Choi, J., & Ryu, H. G. (2015). Statistical analysis of construction productivity for highway pavement operations. KSCE Journal of Civil Engineering, 19(5), pp. 1193–1202. doi: 10.1007/s12205-014-0425-2.ChoiJ.RyuH. G.2015Statistical analysis of construction productivity for highway pavement operationsKSCE Journal of Civil Engineering1951193120210.1007/s12205-014-0425-2Open DOISearch in Google Scholar
De Marco, A., Briccarello, D., & Rafele, C., (2009). Cost and schedule monitoring of industrial building projects: Case Study. Journal of Construction Engineering and Management, 135(9), pp. 853–862. doi: 10.1061/CO.1943-7862.0000055.De MarcoA.BriccarelloD.RafeleC.2009Cost and schedule monitoring of industrial building projects: Case StudyJournal of Construction Engineering and Management135985386210.1061/CO.1943-7862.0000055Open DOISearch in Google Scholar
Druker, E., Demangos, D., & Coleman, R. (2009). Performing statistical analysis on earned value data. International Cost Estimating & Analysis Association, https://www.iceaaonline.com/2009-ev004/DrukerE.DemangosD.ColemanR.2009Performing statistical analysis on earned value dataInternational Cost Estimating & Analysis Associationhttps://www.iceaaonline.com/2009-ev004/Search in Google Scholar
El-Kholy, A. M. (2015). Predicting cost overrun in construction projects. International Journal of Construction Engineering and Management, 4(4), pp. 95–105. doi: 10.5923/j.ijcem.20150404.01.El-KholyA. M.2015Predicting cost overrun in construction projectsInternational Journal of Construction Engineering and Management449510510.5923/j.ijcem.20150404.01Open DOISearch in Google Scholar
El-Maaty, A. E., & El-Kholy, A. M., Akal, A. Y. (2017). Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach. Engineering, Construction and Architectural Management, 24(5), pp. 809–827. doi: 10.1108/ECAM-03.El-MaatyA. E.El-KholyA. M.AkalA. Y.2017Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approachEngineering, Construction and Architectural Management24580982710.1108/ECAM-03Open DOISearch in Google Scholar
George, K. M., Park, N., & Yang, Z. (2015). A reliability measure for time series forecasting predictor. IFAC-Papers OnLine, 48(1), pp. 850–855.GeorgeK. M.ParkN.YangZ.2015A reliability measure for time series forecasting predictorIFAC-Papers OnLine48185085510.1016/j.ifacol.2015.05.078Search in Google Scholar
Gouett, M. C., Haas, C. T., Goodrum, P. M., & Caldas, C. H. (2011). Activity analysis for direct-work rate improvement in construction. Journal of Construction Engineering and Management, 137(12), pp. 1117–1124. doi: 10.1061/(ASCE)CO.1943-7862.0000375.GouettM. C.HaasC. T.GoodrumP. M.CaldasC. H.2011Activity analysis for direct-work rate improvement in constructionJournal of Construction Engineering and Management137121117112410.1061/(ASCE)CO.1943-7862.0000375Open DOISearch in Google Scholar
Gerek, I. H., Erdis, E., Mistikoglu, G., & Usmen, M. A. (2016). Evaluation of plastering crew performance in building project using data envelopement analysis. Technological and Economic Development of Economy, 22(6), pp. 926–940. doi: 10.3846/20294913.2014.909903.GerekI. H.ErdisE.MistikogluG.UsmenM. A.2016Evaluation of plastering crew performance in building project using data envelopement analysisTechnological and Economic Development of Economy22692694010.3846/20294913.2014.909903Open DOISearch in Google Scholar
Gulezian, R., & Samelian, F. (2003). Baseline determination in construction labor productivity-loss claim. Journal of Construction Engineering and Management, 19(4), pp. 160–165. doi: 10.1061/0742-597X(2003)19:4(160).GulezianR.SamelianF.2003Baseline determination in construction labor productivity-loss claimJournal of Construction Engineering and Management19416016510.1061/0742-597X(2003)19:4(160)Open DOISearch in Google Scholar
Han, S., & Lee, T., Ko, Y. (2014). Implementation of construction performance database prototype for curtain wall operation in high-rise building construction. Journal of Asian Architecture and Building Engineering, 13(1), pp. 149–156. doi: 10.3130/jaabe.13.149.HanS.LeeT.KoY.2014Implementation of construction performance database prototype for curtain wall operation in high-rise building constructionJournal of Asian Architecture and Building Engineering13114915610.3130/jaabe.13.149Open DOISearch in Google Scholar
Hillson, D. (2004). Earned value management and risk management: A Practical Synergy. Proceedings of the PMI Global Congress, Anaheim, PMI, pp. 2250–0758.HillsonD.2004Earned value management and risk management: A Practical SynergyProceedings of the PMI Global CongressAnaheim, PMI22500758Search in Google Scholar
Idiake, J. E., & Ikemefuna, M. (2014). Improving labour performance in the management of wall plastering activity for one storey buildings in Abuja, Nigeria. Journal of Economics and Sustainable Development, 5(10).IdiakeJ. E.IkemefunaM.2014Improving labour performance in the management of wall plastering activity for one storey buildings in Abuja, NigeriaJournal of Economics and Sustainable Development510Search in Google Scholar
Jarský, Č. (2000). Automatizovaná příprava a řízení realiza ce staveb. CONTEC Kralupy n. Vlt.JarskýČ.2000Automatizovaná příprava a řízení realiza ce staveb. CONTEC Kralupy n. VltSearch in Google Scholar
Jarský, Č. (2019). Příprava a realizace staveb, CONTEC. http://www.contec.cz [30-11-2017], Akademické nakladatelství CERM, ISBN 978-80-7204-994-3, Brno 2019.JarskýČ.2019Příprava a realizace staveb, CONTEChttp://www.contec.cz [30-11-2017], Akademické nakladatelství CERM, ISBN 978-80-7204-994-3, Brno 2019.Search in Google Scholar
Ko, Y., & Han, S. (2015). Development of construction performance monitoring methodology using bayesian probabilistic approach. Journal of Asian Architecture and Building Engineering, 14(1), pp. 73–80. doi: 10.3130/jaabe.14.73.KoY.HanS.2015Development of construction performance monitoring methodology using bayesian probabilistic approachJournal of Asian Architecture and Building Engineering141738010.3130/jaabe.14.73Open DOISearch in Google Scholar
Khanzadi, M., & Shahbazi, M. M. (2018). Forecasting schedule relia bility using the reliability of agents’ promises. Asian Journal of Civil Engineering, 19(8), pp. 949–962. doi: 10.1007/s42107-018-0075-7.KhanzadiM.ShahbaziM. M.2018Forecasting schedule relia bility using the reliability of agents’ promisesAsian Journal of Civil Engineering19894996210.1007/s42107-018-0075-7Open DOISearch in Google Scholar
Khanzadi, M., Kaveh, A., Alipoura, M., & Khanmohammadi, R. (2017). Assessment of labor productivity in construction projects using system dynamic approach. Scientia Iranica, 24(6), pp. 2684–2695. doi: 10.24200/sci.2017.4164.KhanzadiM.KavehA.AlipouraM.KhanmohammadiR.2017Assessment of labor productivity in construction projects using system dynamic approachScientia Iranica2462684269510.24200/sci.2017.4164Open DOISearch in Google Scholar
Kim, B. C., & Reinschmidt, K. (2010). Probabilistic forecasting of project duration using kalman filter and the earned value method. Journal of Construction Engineering and Management, 136(8), pp. 834–843. doi: 10.1061/(ASCE)CO.1943-7862.0000192.KimB. C.ReinschmidtK.2010Probabilistic forecasting of project duration using kalman filter and the earned value methodJournal of Construction Engineering and Management136883484310.1061/(ASCE)CO.1943-7862.0000192Open DOISearch in Google Scholar
Kubečková, D., & Smugala, S. (2020). Statistical methods applied to construction process management. Asian Journal of Civil Engineering, 21(3), pp. 479–494. doi: 10.1007s42107-020-00221-7.KubečkováD.SmugalaS.2020Statistical methods applied to construction process managementAsian Journal of Civil Engineering21347949410.1007s42107-020-00221-7Open DOISearch in Google Scholar
Kumar, A. V. S. S., & Faheem, B. (2008). Fuzzy optimization of construction project network with multiple objectives. Proceedings of the 4th International Structural Engineering and 16 Construction Conference, ISEC - 4 - Innovations in Structural Engineering and Construction, 2, pp. 1433–1437.KumarA. V. S. S.FaheemB.2008Fuzzy optimization of construction project network with multiple objectivesProceedings of the 4th International Structural Engineering and 16 Construction Conference, ISEC - 4 - Innovations in Structural Engineering and Construction214331437Search in Google Scholar
Lee, D. E. (2005). Probability of project completion using stochastic project scheduling simulation (SPSS). Journal of Construction Engineering and Management, 131(3), pp. 310–318.LeeD. E.2005Probability of project completion using stochastic project scheduling simulation (SPSS)Journal of Construction Engineering and Management131331031810.1061/(ASCE)0733-9364(2005)131:3(310)Search in Google Scholar
Leu, S. S., & Lin, Y. C. (2008). Project performance evaluation based on statistical process control techniques. Journal of Construction Engineering and Management, 134(10), pp. 813–819. doi: 10.1061/0733-9364.LeuS. S.LinY. C.2008Project performance evaluation based on statistical process control techniquesJournal of Construction Engineering and Management1341081381910.1061/0733-9364Open DOISearch in Google Scholar
Lipke, W. (2002). Statistical process control of project performance. The Journal of Defense Software Engineering, 15(3), pp. 15–18.LipkeW.2002Statistical process control of project performanceThe Journal of Defense Software Engineering1531518Search in Google Scholar
Lipke, W., Zwikael, O., Henderson, K., & Anbari, F. (2009). Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes. International Journal of Project Management, 27(4), pp. 400–407. doi: 10.1016/j.ijproman.2008.02.009.LipkeW.ZwikaelO.HendersonK.AnbariF.2009Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexesInternational Journal of Project Management27440040710.1016/j.ijproman.2008.02.009Open DOISearch in Google Scholar
Litschmannová, M. (2015). Pravděpodobnost a statistika Vzorce a tabulky. https://homel.vsb.cz//Vzorce-a-tabulky.newLitschmannováM.2015Pravděpodobnost a statistika Vzorce a tabulkyhttps://homel.vsb.cz//Vzorce-a-tabulky.newSearch in Google Scholar
Lowe, D. J., Emsley, M. W., & Harding, A. (2006). Predicting construction cost using multiple regression techniques. Journal of Construction Engineering and Management, 132(7), pp.750–758. doi: 10.1061/(ASCE)0733-9364 132:7(750).LoweD. J.EmsleyM. W.HardingA.2006Predicting construction cost using multiple regression techniquesJournal of Construction Engineering and Management132775075810.1061/(ASCE)0733-9364 132:7(750)Open DOISearch in Google Scholar
Minasowicz, A., Kostrzewa, B., & Zawistowski, J. (2011). Construction project risk control based on expertise using fuzzy set theory. Proceedings of the 28th ISARC, pp. 101–106. doi: 10.22260/ISARC2011/0015.MinasowiczA.KostrzewaB.ZawistowskiJ.2011Construction project risk control based on expertise using fuzzy set theoryProceedings of the 28th ISARC10110610.22260/ISARC2011/0015Open DOISearch in Google Scholar
Mizell, C., & Malone, L. (2007). A project management approach to using simulation for cost estimation on large, complex software development projects. Engineering Management Journal, 19(4), pp. 28–34. doi: 10.1080/10429247.MizellC.MaloneL.2007A project management approach to using simulation for cost estimation on large, complex software development projectsEngineering Management Journal194283410.1080/10429247Open DOISearch in Google Scholar
Monkaew, S., & Nawalerspunya, T. (2015). A productivity rate in concrete plastering of exterior brick wall. King Mongkut's University of Technology North Bangkok, doi: 10.14416/j.kmutnb.2015.02.004.MonkaewS.NawalerspunyaT.2015A productivity rate in concrete plastering of exterior brick wallKing Mongkut's University of Technology North Bangkok10.14416/j.kmutnb.2015.02.004Open DOISearch in Google Scholar
Narbaev, T., & De Marco, A. (2011). Cost estimate at completion methods in construction projects. 2011 2nd International Conference on Construction and Project Management, 15. doi: 10.13140/2.1.1898.3369.NarbaevT.De MarcoA.2011Cost estimate at completion methods in construction projects2011 2nd International Conference on Construction and Project Management1510.13140/2.1.1898.3369Open DOISearch in Google Scholar
Nassar, K. M., Gunnarsson, H. G., & Hegad, M. Y. (2005). Using weibull analysis for evaluation of cost and schedule performance. Journal of Construction Engineering and Management, 131(12), pp. 1257–1262. doi: 10.1061/(ASCE)07339364(2005)131:12(1257).NassarK. M.GunnarssonH. G.HegadM. Y.2005Using weibull analysis for evaluation of cost and schedule performanceJournal of Construction Engineering and Management131121257126210.1061/(ASCE)07339364(2005)131:12(1257)Open DOISearch in Google Scholar
Nelson, W. B. (1990). Accelerated testing, statistical models, test plans, and data analysis. Wiley.NelsonW. B.1990Accelerated testing, statistical models, test plans, and data analysisWileySearch in Google Scholar
Odesola, I. A., Okolie, K. C, & Nnametu, J. N. (2015). A comparative evaluation of labour productivity of wall plastering activity using work study. PM World Journal, 4(5), pp. 1–10.OdesolaI. A.OkolieK. CNnametuJ. N.2015A comparative evaluation of labour productivity of wall plastering activity using work studyPM World Journal45110Search in Google Scholar
Olomolaiye, P. O., & Ogunlana, S. O. (1989). An evaluation of production outputs in key building trades in Nigeria. Construction Management and Economics, 7(1), pp. 75–86.OlomolaiyeP. O.OgunlanaS. O.1989An evaluation of production outputs in key building trades in NigeriaConstruction Management and Economics71758610.1080/01446198900000008Search in Google Scholar
Plybankiewicz, E. (2018). Model of predicting cost overrun in construction projects. Sustainability, 10(12), pp. 4387. doi: 10.3390/su10124387.PlybankiewiczE.2018Model of predicting cost overrun in construction projectsSustainability1012438710.3390/su10124387Open DOISearch in Google Scholar
Rad, K. G., & Kim, S. Y. (2018). Factors affecting construction labor productivity: Iran Case Study. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 42(2), pp. 165–180. doi: 10.1007/s40996-018-0095-2.RadK. G.KimS. Y.2018Factors affecting construction labor productivity: Iran Case StudyIranian Journal of Science and Technology, Transactions of Civil Engineering42216518010.1007/s40996-018-0095-2Open DOISearch in Google Scholar
Saini, H., Singh, K., & Malik, U. (2017). Project management in construction using primavera. International Journal of Civil Engineering and Technology, 8(8), pp. 538–549.SainiH.SinghK.MalikU.2017Project management in construction using primaveraInternational Journal of Civil Engineering and Technology88538549Search in Google Scholar
Salunkhe, A. A. (2018). Assessment of Critical Construction Delay Factors, I J R. https://edupediapublications.org/journalsSalunkheA. A.2018Assessment of Critical Construction Delay Factors, I J Rhttps://edupediapublications.org/journalsSearch in Google Scholar
Salunkhe, A. A., & Patil, R. S., (2013). Statistical methods for construction delay analysis. Journal of Mechanical and Civil Engineering, 9(2), pp. 58–62.SalunkheA. A.PatilR. S.2013Statistical methods for construction delay analysisJournal of Mechanical and Civil Engineering925862Search in Google Scholar
San Cristóbal, J. R. (2017). The S-curve envelope as a tool for monitoring and control of projects. Procedia Computer Science, 121, pp. 756–761.San CristóbalJ. R.2017The S-curve envelope as a tool for monitoring and control of projectsProcedia Computer Science12175676110.1016/j.procs.2017.11.097Search in Google Scholar
Shrestha, P. P., Burns, L. A., & Shields, D. R. (2013). Magnitude of construction cost and schedule overruns in public work projects. Journal of Construction Engineering, 2013(2), doi: 10.1155/935978.ShresthaP. P.BurnsL. A.ShieldsD. R.2013Magnitude of construction cost and schedule overruns in public work projectsJournal of Construction Engineering2013210.1155/935978Open DOISearch in Google Scholar
Sinesilassie, E. G., Tabish, S. Z., Jha, K. N. (2016). Critical factors affecting cost performance: A case of Ethiopian public construction projects. International Journal of Construction Management, 18(2), pp. 108–119. doi: 10.1080/156235991277058.SinesilassieE. G.TabishS. Z.JhaK. N.2016Critical factors affecting cost performance: A case of Ethiopian public construction projectsInternational Journal of Construction Management18210811910.1080/156235991277058Open DOISearch in Google Scholar
Subramani, T., & Karthick, T. M. (2018). Study on time and resource management in construction projects using MS project. International Journal of Engineering & Technology, 7(3.10), pp. 23–26.SubramaniT.KarthickT. M.2018Study on time and resource management in construction projects using MS projectInternational Journal of Engineering & Technology73.10232610.14419/ijet.v7i3.10.15622Search in Google Scholar
Thomas, H. R., Horman, M. J., de Souza, U. E., & Zavrski, I. (2002). Reducing variability to improve performance as a lean construction principle. Journal of Construction Engineering and Management, 128(2), pp. 144–154. doi: 10.1061/0733-9364.ThomasH. R.HormanM. J.de SouzaU. E.ZavrskiI.2002Reducing variability to improve performance as a lean construction principleJournal of Construction Engineering and Management128214415410.1061/0733-9364Open DOISearch in Google Scholar
Urgilés, P., Claver, J., & Sebastián, M. A. (2019). Analysis of the earned value management and earned schedule techniques in complex hydroelectric power production projects: Cost and Time Forecast. Complexity, doi: 10.1155/2019/3190830.UrgilésP.ClaverJ.SebastiánM. A.2019Analysis of the earned value management and earned schedule techniques in complex hydroelectric power production projects: Cost and Time ForecastComplexity10.1155/2019/3190830Open DOISearch in Google Scholar
Vanhoucke, M., & Vandevoorde, S. (2007). A simulation and evaluation of earned value metrics to forecast the project duration. Journal of the Operational Research Society, 58(10), pp. 1361–1374. doi: 10.1057/palgrave.jors.2602 296.VanhouckeM.VandevoordeS.2007A simulation and evaluation of earned value metrics to forecast the project durationJournal of the Operational Research Society58101361137410.1057/palgrave.jors.2602 296Open DOISearch in Google Scholar
Vermo, M., & Kansal, R. (2020). Statistical analysis of delays factors in construction projects. International Journal for Research in Applied Science and Engineering Technology, 8(9).VermoM.KansalR.2020Statistical analysis of delays factors in construction projectsInternational Journal for Research in Applied Science and Engineering Technology8910.22214/ijraset.2020.31531Search in Google Scholar
Wang, Q., Jiang, N., Gou, L., Che, M., & Zhang, R. (2006). Practical experiences of cost/schedule measure through earned value management and statistical process control. Procedure of InternationalWorkshop on Software, pp.348–354. doi: 10.1007/11754305.WangQ.JiangN.GouL.CheM.ZhangR.2006Practical experiences of cost/schedule measure through earned value management and statistical process controlProcedure of InternationalWorkshop on Software34835410.1007/11754305Open DOISearch in Google Scholar
Zawistovski, J. (2010). Application of modified earned value method for assessing the risk and progress of construction projects. Proceedings of the 10th ICM, BMS and Techniques. Vilnius Gediminas Technical University, pp. 557–560.ZawistovskiJ.2010Application of modified earned value method for assessing the risk and progress of construction projectsProceedings of the 10th ICM, BMS and TechniquesVilnius Gediminas Technical University557560Search in Google Scholar