This work is licensed under the Creative Commons Attribution 4.0 International License.
S. Bhandari, N. Chakpitak, K. Meksamoot and T. Chandarasupsang. “Knowledge engineering approach for power transformer asset management.” Journal of Engineering Science and Technology, vol. 7, pp. 73-88, 2012.Search in Google Scholar
B.R. Mehta and Y.J. Reddy. Industrial Process Automation Systems: Design and Implementation.Waltham, MA: Butterworth-Heinemann, Elsevier Inc., 2014.Search in Google Scholar
S. Wan. “Asset performance management for power grids.” Energy Procedia, vol. 143, pp. 611-616, 2017.Search in Google Scholar
M. Honda, T. Kishi and H. Yamamoto. “Study of asset management method for galvanized steel railway electrification infrastructure in JR-EAST.” Procedia CIRP, vol. 59, pp. 47-52, 2017.Search in Google Scholar
D. Kumar and I. Patnaikuni. “Why Simplified Asset Management is Vital for Organizational Growth.” International Journal of Construction Engineering and Management, vol. 1, pp. 14-19, 2012.Search in Google Scholar
L. Maring and M. Blauw. “Asset management to support urban land and subsurface management.” Science of the Total Environment, vol. 615, pp. 390-397, 2018.Search in Google Scholar
F. Yazdandoost and A. Izadi. “An asset management approach to optimize water meter replacement.” Environmental Modelling and Software, vol. 104, pp. 270-281, 2018.Search in Google Scholar
A. Orcesi, H. Chemineau, P. Lin, P. Van Gelder and N. Van Erp. “A risk analysis for asset management considering climate change.” Transportation Research Procedia, vol. 14, pp. 105-114, 2016.Search in Google Scholar
J. Hu, R. Harmsen, W. Crijns-Graus and E. “Worrell. Barriers to investment in utility-scale variable renewable electricity (VRE) generation projects.” Renewable Energy, vol. 121, pp. 730-744, 2018.Search in Google Scholar
T.W. Sloan. “Green renewal: incorporating environmental factors in equipment replacement decisions under technological change.” Journal of Cleaner Production, vol. 19, pp. 173-186, 2011.Search in Google Scholar
T. Nguyen, T. Yeung and B. Castanier. “Optimal maintenance and replacement decisions under technological change with consideration of spare parts inventories.” International Journal of Production Economics, vol. 143, pp. 472-477, 2013.Search in Google Scholar
S. Richardson, A. Kefford and M. Hodkiewicz. “Optimised asset replacement strategy in the presence of lead time uncertainty.” International Journal of Production Economics, vol. 141, pp. 659-667, 2013.Search in Google Scholar
S. Zheng and S. Chen. “Fleet replacement decisions under demand and fuel price uncertainties.” Transportation Research Part D: Transport and Environment, vol. 60, pp. 153-173, 2018.Search in Google Scholar
B. Glensk and R. Madlener. “Evaluating the enhanced flexibility of lignite-fired power plants: a real options analysis.” Energy Conversion and Management, vol. 177, pp. 737-749, 2017.Search in Google Scholar
W. Sullivan, E. Wicks and C. Koelling. Engineering Economy, London, UK: Pearson, 2013Search in Google Scholar
J. Zambujal-Oliveira and J. Duque. “Operational asset replacement strategy: a real options approach.” European Journal of Operational Research, vol. 210, pp. 318-325, 2011.Search in Google Scholar
F. Mardin and T. Arai. “A system dynamics model for replacement and overhaul policies on capital asset subject to technological change.” In Proceedings of the 29thInternational Conference of the System Dynamics Society,Washnigton, DC., pp. 211-225, 2011.Search in Google Scholar
A. Abdi and S. Taghipour. “Sustainable asset management: a repair-replacement decision model considering environmental impacts, maintenance quality, and risk.” Computers & Industrial Engineering, vol. 136, pp. 117-134, 2019.Search in Google Scholar
M. Reindorp and M. Fu. “Capital renewal as a real option.” European Journal of Operational Research,, vol. 214, pp. 109-117, 2011.Search in Google Scholar
S. Stutzman, B. Weiland, P. Preckel and M. Wetzstein. “Optimal replacement policies for an uncertain rejuvenated asset.” International Journal of Production Economics, vol. 185, pp. 21-33, 2017.Search in Google Scholar
M. Soleimani, M. Alizadeh and M. Moallem. “Economical replacement decision for induction motors in industry.” International Review of Automatic Control, vol. 5, pp. 240-246, 2018Search in Google Scholar
H. Abbaspour and A. Maghaminik. “Equipment replacement decision in mine based on decision tree algorithm,” in Proceedings of the 2016 Scientific Reports on Resource Conference, Freiberg, Germany, pp. 187-194, 2016.Search in Google Scholar
R. Shah, O. McMann and F. Borthwick. “Challenges and prospects of applying asset management principles to highway maintenance: a case study of the UK.” Transportation Research: Part A, vol. 97, pp. 231-243, 2016.Search in Google Scholar
V. Macián, B. Tormos and J. Riechi. “Time replacement optimization model: comparitive analysis of urban transport fleets using Monte Carlo Simulation.” Maintenance and Reliability, vol. 19, pp. 151-157, 2017.Search in Google Scholar
W. Xu and L. Cao. “Optimal tool replacement with product quality deterioration and random tool failure.” International Journal of Production Research, vol. 53, pp. 1736-1745, 2014Search in Google Scholar
D. Bandaly, L. Shanker and A. Satir. “Integrated financial and operational risk management of foreign exchange risk, input commodity price risk and demand uncertainty.” IFAC-PapersOnLine, vol. 51, pp. 957-962, 2018.Search in Google Scholar
A. Hao. “Uncertainty, risk aversion and risk management in agriculture.” Agriculture and Agricultural Science Procedia, vol. 1, pp. 152-156, 2010.Search in Google Scholar
K. Huang, L. Ye, L. Chen, Q. Wang, L. Dai, J. Zhou, et al. “Risk analysis of flood control reservoir operation considering multiple uncertainties.” Journal of Hydrology, vol. 565, pp. 672-684, 2018.Search in Google Scholar
M.H. Zwietering. “Risk assessment and risk management for safe foods: assessment needs inclusion of variability and uncertainty, management needs discrete decisions.” International Journal of Food Microbiology, vol. 213, pp. 118-123, 2015.Search in Google Scholar
L. Uusitalo, A. Lehikoinen, I. Helle and K. Myrberg. “An overview of methods to evaluate uncertainty of deterministic models in decision support.” Environmental Modelling & Software, vol. 63, pp. 24-34, 2015.Search in Google Scholar
F. Crundwell. Finance for Engineers: Evaluation and Funding of Capital Projects, London, UK: Springer-Verlag, 2008.Search in Google Scholar
S. Ward and C. Chapman. “Transforming project risk management into project uncertainty management.” International Journal of Project Management, vol. 21, pp. 97-105, 2001.Search in Google Scholar
A. Cagliano, S. Grimaldi and C. Rafele. “Choosing project risk management techniques: a theoretical framework.” Journal of Risk Research, vol. 18, pp. 232-248, 2014.Search in Google Scholar
G. Favato, G. Baio, A. Capone, A. Marcellusi and F. Saverio Mennini. “A novel method to value real options in health care: the case of a multicohort human papillomavirus vaccination strategy.” Clinical Therapeutics, vol. 35, pp. 904-914, 2013.Search in Google Scholar
H. Ghamlouch, M. Fouladirad and A. Grall. “The use of real option in condition-based maintenance scheduling for wind turbines with production and deterioration uncertainties.” Reliability Engineering & System Safety, vol. 188, pp. 614-623, 2019.Search in Google Scholar
G.T. Hult, C.W. Craighead and D.J. Ketchen. “Risk uncertainity and supply chain decisions: a real options perspective.” Desision Sciences, vol. 41, pp. 435-458, 2010.Search in Google Scholar
Y. Yatsenko and N. Hritonenko. “Machine replacement under evolving deterministic and stochastic costs.” International Journal of Production Economics, vol. 193, pp. 491-501, 2017.Search in Google Scholar
F.M. Muharam. “Assessing risk for strategy formulation in steel industry through Real Option Analysis.” Procedia Social and Behavioral Sciences, vol. 24, pp. 991-1002, 2011.Search in Google Scholar
V. Platon and A. Constantinescu. “Monte Carlo method in risk analysis for investment projects.” Procedia Economics and Finance, vol. 15, pp. 393-400, 2014.Search in Google Scholar
R.L. Harrison. “Introduction to Monte Carlo Simulation.” in AIP Conference Proceedings, vol. 1204, pp. 17-21, 2010.Search in Google Scholar
K. Madani and J. Lund. “A Monte-Carlo game theoretic approach for multi-criteria decision making under uncertainty.” Advances in Water Resources, vol. 34, pp. 607-616, 2011.Search in Google Scholar
A. Silva, F. Marins, E. Dias and J. Oliveira. “Modeling the uncertainty in response surface methodology through optimization and Monte Carlo Simulation: an application in stamping process.” Materials and Design, vol. 173, pp. 107-776, 2019.Search in Google Scholar
A. Banadaki, M. Tschopp and S. Patala. “An efficient Monte Carlo algorithm for determining the minimum energy structures of metallic grain boundaries,” Computational Materials Sceince, vol. 155, pp. 466-475, 2018.Search in Google Scholar
A.M. Momani and A.A. Ahmed. “Material handling equipment selection using hybrid Monte Carlo Simulation and Analytic Hierarchy Process.” World Academy of Science, Engineering and Technology, vol. 59, pp. 953-958, 2011.Search in Google Scholar
U. Arnold and Ö, Yildiz. “Economic risk analysis of decentralized renewable energy infrastructures – a Monte Carlo simulation approach.” Renewable Energy, vol. 77, pp. 227-239, 2015.Search in Google Scholar
M. Ataei, H. Shahsavany and R. Mikaeil. “Monte Carlo Analytic Hierarchy Process (MAHP) approach to selection of optimum mining method.” International Journal of Mining Science and Technology, vol. 23, pp. 573-578, 2013.Search in Google Scholar
C. Kaczor, S. Młynarski, M. Szkoda. “Verification of safety integrity level with the application of Monte Carlo simulation and reliability block diagrams.” Journal of Loss Prevention in the Process Industries, vol. 41, pp. 31-39, 2016.Search in Google Scholar
S. Yasuda. “Monte Carlo simulation for kinetic chemotaxis model: anapplication to the traveling population wave.” Journal of Computational Physics, vol. 55, pp. 56-72, 2016.Search in Google Scholar
M. Nasri, A. Metrane, H. Imad and A. Jamali. “A robust approach for solving a vehicle routing problem with time windows with uncertain service and travel times.” International Journal of Industrial Engineering Computations, vol. 11, pp. 1-16, 2020.Search in Google Scholar
A. Momani, T. Al-Hawari and R. Mousa. “Expanded Real Options Analysis for evaluating capacity expansion decisions under uncertainty in construction material industry.” South African Journal of Industrial Engineering, vol. 27, pp. 1-14, 2016.Search in Google Scholar
F. Crundwell. Finance for Engineers: Evaluation and Funding of Capital Projects, London, UK: Springer, 2008.Search in Google Scholar
D. Brenner, C. Weber, L. Lenz and E. Westkaemper. “Total tool cost of ownership indicator for holistical evaluations of improvement measures within the cutting tool life cycle.” Procedia CIRP, vol. 72, pp. 1404-1409, 2018.Search in Google Scholar
H. Baker and P. English. Capital budgeting valuation: financial analysis for today’s investment projects, Hoboken, NJ: John Wiely & Sons, 2011.Search in Google Scholar
P. Goodwin, G. Wright. Decision Analysis for Management Judgment, Chichester, UK: John Wiley & Sons Ltd., 2014.Search in Google Scholar
K. Chelst and S. Bodaily. “Structured risk management: filling a gap in decision analysis education.” Journal of The Operational Research Scociaty, vol. 51, pp. 1420-1432, 2000.Search in Google Scholar
S. Koh, A. Gunasekaran, J. Morris, R. Obayi and S. Ebrahimi. “Conceptualizing a circular framework of supply chain resource sustainability.” International Journal of Operations & Production Management, vol. 37, pp. 1520-1540, 2017.Search in Google Scholar
M. Zhang, D. Zhou and P. Zhou. “A Real Option model for renewable energy policy evaluation with application to solar PV power generation in china.” Renewable and Sustainable Energy Reviews, vol. 40, pp. 944-955, 2014.Search in Google Scholar
M. Elcheikh and M. Burrow. (2017, March). “Uncertainties in forecasting maintenance costs for asset management: application to an aging canal system.” ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering. [online]. vol. 3, Available: https://ascelibrary.org/doi/10.1061/AJRUA6.0000890 [May 25, 2023].Search in Google Scholar