[[1] D. Tarnapowicz, T. Borkowski. Shore to Ship System: Alternative Power Supply of Ships in Ports, Szczecin: Scientific Publishing House of the Maritime University, 2014.]Search in Google Scholar
[[2] D. Tarnapowicz, T. Borkowski. „»Shore to ship« system-an alternative electric power supply in port”, in Journal of KONES, vol. 19(3), 2012, pp. 49-58.10.5604/12314005.1137943]Search in Google Scholar
[[3] EU (2006/339/EC) COMMISSION RECOMMENDATION of 8 May 2006 On the promotion of shore-side electricity for use by ships at berth in Community ports (Text with EEA relevance).]Search in Google Scholar
[[4] IEC/ISO/IEEE 80005-1. INTERNATIONAL STANDARD Utility connections in port - Part 1: High Voltage Shore Connection (HVSC) Systems - General requirements.]Search in Google Scholar
[[5] R.R. Acosta. „Comparing Natural Gas and Diesel Generator Sets”, in Power Engineering Magazine, vol. 119 (2), 2015.]Search in Google Scholar
[[6] Technical data of CG170-16 and CG260-16 (2016) [Online]. Available: http://www.cat.com/en_US/products]Search in Google Scholar
[[7] Cryogas M&T Poland S.A. LNG facilities - scheme (2016) [Online]. Available: http://www.cryogas.pl/o_lng]Search in Google Scholar
[[8] OPS calculation tool, version 05-08-2013 (2015) [Online]. Available: http://www.ops.wpci.nl/costs/cost-calculation/]Search in Google Scholar
[[9] Becker Marine Systems, PRESS RELEASE NO. 7/2014.]Search in Google Scholar