Accesso libero

Measuring the Influence of Communication Planning Towards Construction Project Performance

INFORMAZIONI SU QUESTO ARTICOLO

Cita

[1] XUE, X. – WANG, Y. – SHEN, Q. – YU, X.: Coordination mechanisms for construction supply chain management in the internet environment. International Journal of Project Management, Vol. 25, Iss. 2, 2007, pp. 150-157.10.1016/j.ijproman.2006.09.006 Search in Google Scholar

[2] SENARATNE, S. – RUWANPURA, M.: Communication in construction: a management perspective through case studies in Sri Lanka. Journal of Architectural Engineering and Design Management, Vol. 12, Iss. 1, 2016, pp. 3-18.10.1080/17452007.2015.1056721 Search in Google Scholar

[3] EDDIE, W. L. – CHENG, H. L. – PETER, E. D. – LOVE, Z. I.: Network communication in the construction industry. Corporate Communications: An International Journal, Vol. 6, Iss. 2, 2001, pp. 61-70.10.1108/13563280110390314 Search in Google Scholar

[4] CERIC, A.: Minimizing communication risk in construction: a delphi study of the key role of project managers. Journal of Civil Engineering and Management, Vol. 20, Iss. 6, 2014, pp. 829-838.10.3846/13923730.2013.802739 Search in Google Scholar

[5] DAINTY, A. – MOORE, D. – MURRAY, M.: Communication in construction – Theory and practice 1st edition, London: Taylor & Francis, 2006.10.4324/9780203358641 Search in Google Scholar

[6] BAKHTIYAR, A. – SOEHARDJONO, A. – HASYIM, M. H.: Analisis faktor-faktor yang mempengaruhi keterlambatan proyek konstruksi pembangunan gedung di kota lamongan. Jurnal Rekaya Sipil, Vol. 6, Iss. 1, 2012, pp. 55-66.10.33795/prokons.v6i2.27 Search in Google Scholar

[7] SOLIMAN, E.: Communication Problems Causing Governmental Projects Delay – Kuwait Case Study, International Journal of Construction Project Management, Vol. 9, Iss. 1, 2017, pp. 1-18. Search in Google Scholar

[8] PROJECT MANAGEMENT INSTITUTE: A Guide to the Project Management Body of Knowledge Sixth Edition, Project Management Institute, 2017. Search in Google Scholar

[9] FERTILIA, N. C. – LATIEF, Y. – SUBIYANTO, E.: Pengembangan Proses Perencanaan Pada Proyek EPC Berbasis PMBOK Untuk Meningkatkan Kualitas Perencanaan Proyek Yang Berkaitan Dengan Kinerja Waktu di PT. KE. Jurnal Rekayasa Sipil, Vol. 7, Iss. 1, 2018, pp. 13-31.10.22441/jrs.2018.v07.i1.02 Search in Google Scholar

[10] BAIDEN, B. K. – PRICE, A. D. F.: The effect of integration on project delivery team effectiveness. International Journal of Project Management, Vol. 29, 2010, pp. 129-136.10.1016/j.ijproman.2010.01.016 Search in Google Scholar

[11] EMMITT, S. – GORSE, C. A.: Communication in Construction teams. London: Taylor and Francis, 2007.10.4324/9780203018798 Search in Google Scholar

[12] TAI, S. – WANG, Y. – ANUMBA, C. J.: A survey on Communications in large scale construction projects in China. Journal of Engineering, Construction and Architectural Management, Vol. 16, Iss. 2, 2009, pp. 136-149.10.1108/09699980910938019 Search in Google Scholar

[13] PROJECT MANAGEMENT INSTITUTE: Communication: The Message Is Clear, 2013. Search in Google Scholar

[14] TAM, C.: Use of the Internet to enhance construction communication: Total Information Transfer System. International Journal of Project Management, 1999, pp. 107-111.10.1016/S0263-7863(97)00077-X Search in Google Scholar

[15] WIJAYA, I. S.: Perencanaan dan Strategi Komunikasi dalam Kegiatan Pembangunan. Jurnal Lentera, Vol. 18, Iss. 1, 2015, pp. 53-61. Search in Google Scholar

[16] CHAN, E. H. – SUEN, H. C.: Dispute resolution management for international constructional projects in China. Journal of Management Decision, Vol. 43, Iss. 4, 2005, pp. 589-602.10.1108/00251740510593576 Search in Google Scholar

[17] BAL, M. – BRYDE, D. – FEORAN, D. – OCHIENG, E.: Stakeholder Engagement: Achieving Sustainability in the Construction Sector. Journal of Sustainability, Vol. 5, Iss. 2, 2013, pp. 695-710.10.3390/su5020695 Search in Google Scholar

[18] AL QADY, M. – KANDIL, A..: Document Management in Construction: Practices and Opinions. Journal of Construction Engineering and Management, Vol. 139, Iss. 10, 2013.10.1061/(ASCE)CO.1943-7862.0000741 Search in Google Scholar

[19] PERUMAL, V. R. – BAKAR, A. H. A.: The needs for standardization of document towards an efficient communication in the construction industry. Acta Technica Corviniensis – Bulletin of Engineering, Vol. 4, Iss. 1, 2011, pp. 23-30. Search in Google Scholar

[20] ZIDANE, Y.J.T. – HUSSEIN, B.A. – GUDMUNDSSON, J.O. – EKAMBARAM, A.: Categorization of organizational factors and their impact on project. Procedia - Social and Behavioral Sciences, Vol. 226, 2016, pp. 162-169.10.1016/j.sbspro.2016.06.175 Search in Google Scholar

[21] BUERTEY, J. I. T. – INGA, E. A. – KUMI, A. T.: Estimating cost contingency for construction projects: the challenge of systemic and project spesific risk. Journal of Construction Project Management and Innovation, Vol. 2, Iss. 1, 2012, pp. 166-189. Search in Google Scholar

[22] KAYANY, J. M. – WOTRING, E. C. – FORREST, E. J.: Relation Control and Interactive Choice in Technology-Mediated Communication Situations. Human Communication Research, Vol. 22, Iss. 3, 1996, pp. 399-421.10.1111/j.1468-2958.1996.tb00373.x Search in Google Scholar

[23] BAGULEY, P.: Effective Communication for modern Business. London: McGraw-Hill, 1994. Search in Google Scholar

[24] GORSE, C. A. – EMMIT, S. – LOWIS, M.: Problem solving and appropriate communication medium. 15th Annual Conference, Vol. 2, 1999, pp. 511-518. Search in Google Scholar

[25] PELED, A.: Politicking for succes: the missing skill. Leadership & Organizational Development Journal, Vol. 21, Iss. 1, 2000, pp. 20-29.10.1108/01437730010310703 Search in Google Scholar

[26] SUNINDIJO, R. Y. – ZOU, P. X.: CHPT construct: essential skills for construction project managers. International Journal of Project Organisation and Management, Vol. 3, Iss.2, 2011, pp. 139-163.10.1504/IJPOM.2011.039818 Search in Google Scholar

[27] HELDMAN, K.: PMP: Project Management Professional Exam Study Guide. John Wiley & Sons, 2018.10.1002/9781119549192 Search in Google Scholar

[28] PELLICER, E. – YEPES, V. – TEIXEIRA, J. C. – MOURA, H. P. – CATALA, J.: Construction Management. 2014. Search in Google Scholar

[29] MALLADI, S.: Fostering project communication – Is about planning, process and people. PM World Today, Vol. 9, Iss. 4, 2007, pp. 1-5. Search in Google Scholar

[30] PATANAKUL, P. – IEWWONGCHAROEN, B. – MILOSEVIC, D.: An empirical study on the use of project management tools and techniques across project life-cycle and their impact on project success. Journal of General Management, Vol. 36, Iss. 1, 2010, pp. 41-65.10.1177/030630701003500304 Search in Google Scholar

[31] MAHESWARI, J. U. – VARGHESE, K.: Project Scheduling using Dependency Structure Matrix. International Journal of Project Management, Vol. 23, 2005, pp. 223-230.10.1016/j.ijproman.2004.10.001 Search in Google Scholar

[32] YUN, S. – CHOI, J. – OLIVEIRA, D. P. – MULVA, S. P. – KANG, Y.: Measuring project management inputs throughout capital project delivery. International Journal of Project Management, Vol. 34, Iss. 7, 2016, pp. 1167-1182.10.1016/j.ijproman.2016.06.004 Search in Google Scholar

[33] WARD, S. C. – CHAPMAN, C. B. – CURTIS, B.: On the Allocation of Risk in Construction Projects. International Journal of Project Management, Vol. 9, Iss. 3, 1991, pp.140-147.10.1016/0263-7863(91)90038-W Search in Google Scholar

[34] KAGIOGLU, M. – COPER, R. – AOUAD, G.: Performance Management in Construction: A Conceptual Framework. Construction Management and Economics, Vol 19, Iss. 1, 2001, pp. 85-95.10.1080/01446190010003425 Search in Google Scholar

[35] TOOR, S. R. – OGUNLANA, S. O.: Beyond the Iron Triangle: Stakeholder Perception of Key Performance Indicators (KPIs) for Large-Scale Public Sector Development Projects. International Journal of Project Management, Vol. 28, Iss. 2, 2010, pp. 228-236.10.1016/j.ijproman.2009.05.005 Search in Google Scholar

[36] LEMESHOW, S. – HOSMER, D. W. – KLAR, J. – LWANGA, S. K.: Adequacy of Sample Size in Health Studies. West Sussex: John Wiley & Sons Ltd., 1990. Search in Google Scholar

[37] BESNER, C. – HOBBS, B.: Project management practice, generic or contextual: a reality check. Project Management Journal, Vol. 39, Iss. 1, 2008, pp. 16-33.10.1002/pmj.20033 Search in Google Scholar

[38] ASSEFA, M.: Factors Affecting the Success of Construction Projects in Petroleum Distributing Companies in Ethiopia: with a specific case of National Oil Ethiopia and Mulege Petroleum. 2019. Search in Google Scholar

[39] INDAH, S. N.: Quality management risk analysis and preparation of quality control procedures for subcontractor work at Jakarta PIK gold coast apartment project. 2017. Search in Google Scholar

eISSN:
2199-6512
Lingua:
Inglese