Accesso libero

The Influence of Compensatory Regime of Operation of Pump Hydropower Plant Capljina on Voltage Conditions in Electric Power System of Bosnia and Herzegovina

INFORMAZIONI SU QUESTO ARTICOLO

Cita

[1] Hrvoje Pozar Energy Institute: Techno-economic aspects of voltage regulation as ancillary (system) services - identification and remediation of unauthorized voltages on the transmission network of B&H, Zagreb, May 2012 Search in Google Scholar

[2] The SINCRO.GRID project - Phase 1 responds to the challenges of the electricity transmission network in Slovenia and Croatia, May 2017, https://www.sincrogrid.eu/ Search in Google Scholar

[3] ISOB&H, study “Influence of the compensatory mode of operation of the pumping hydropower plant Capljina on the voltage conditions in the power system of Bosnia and Herzegovina”, Sarajevo, December 2020 Search in Google Scholar

[4] ISOB&H, “Network Code”, Sarajevo, January 2019 Search in Google Scholar

[5] WB17-REG-ENE-01, „Regional Feasibility Study for Voltage Profile Improvement“, Programme for Albania, Bosnia and Herzegovina, North Macedonia, Kosovo, Montenegro, and Serbia, December 2020 Search in Google Scholar

[6] S. Hadzic, H. Ferizovic, B. Zecevic, A. Muharemovic, N. Janjic: Analysis of voltage conditions on the transmission network of the power system of Bosnia and Herzegovina, 15. BH K CIGRE Conference, Neum,. October 17-20. 2021 Search in Google Scholar

[7] ISOB&H, study “Identification of impermissible voltages on the transmission network of B&H”, Sarajevo, X 2010 Search in Google Scholar

[8] Z. Bajramovic, S. Hadzic, M. Veledar, O. Hadzic: The Appearance of the Power Frequency Overvoltage in the Transmission Network, 8th International Conference -Workshop Compatibility and Power Electronics (CPE 2013), Ljubljana, Slovenia, June 5 – 7. 201310.1109/CPE.2013.6601124 Search in Google Scholar

[9] PSS/E, PSS/E (Power System Simulator Siemens Energy, Inc, Power Technologies International) Search in Google Scholar

eISSN:
2566-3151
Lingua:
Inglese