Study on the improvement of measurement accuracy of grid short-circuit parameters based on semi-physical simulation
, , , e
05 lug 2024
INFORMAZIONI SU QUESTO ARTICOLO
Pubblicato online: 05 lug 2024
Ricevuto: 27 feb 2024
Accettato: 23 mag 2024
DOI: https://doi.org/10.2478/amns-2024-1690
Parole chiave
© 2024 Siyang He et al., published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.
He, Siyang
Guizhou Power Grid Co., Ltd., Duyun Power Supply BureauDuyun, China
Yu, Hailin
Guizhou Power Grid Co., Ltd., Duyun Power Supply BureauDuyun, China
He, Guanglu
Guizhou Power Grid Co., Ltd., Duyun Power Supply BureauDuyun, China
Wang, Shuai
Guizhou Power Grid Co., Ltd., Tongren Power Supply BureauTongren, China
Pan, Fuxiang
Guizhou Power Grid Co., Ltd., Duyun Power Supply BureauDuyun, China