Login
Registrati
Reimposta password
Pubblica & Distribuisci
Soluzioni Editoriali
Soluzioni di Distribuzione
Temi
Architettura e design
Arti
Business e Economia
Chimica
Chimica industriale
Farmacia
Filosofia
Fisica
Geoscienze
Ingegneria
Interesse generale
Legge
Letteratura
Linguistica e semiotica
Matematica
Medicina
Musica
Scienze bibliotecarie e dell'informazione, studi library
Scienze dei materiali
Scienze della vita
Scienze informatiche
Scienze sociali
Sport e tempo libero
Storia
Studi classici e del Vicino Oriente antico
Studi culturali
Studi ebraici
Teologia e religione
Pubblicazioni
Riviste
Libri
Atti
Editori
Blog
Contatti
Cerca
EUR
USD
GBP
Italiano
English
Deutsch
Polski
Español
Français
Italiano
Carrello
Home
Riviste
Architecture, Civil Engineering, Environment
Volume 12 (2019): Numero 3 (September 2019)
Accesso libero
TECHNICAL CONDITIONS OF THE UNIQUE STRUCTURE OF INVERTED SIPHON – HISTORY & PRESENT
Jacek HULIMKA
Jacek HULIMKA
e
Marta KAŁUŻA
Marta KAŁUŻA
| 18 ott 2019
Architecture, Civil Engineering, Environment
Volume 12 (2019): Numero 3 (September 2019)
INFORMAZIONI SU QUESTO ARTICOLO
Articolo precedente
Articolo Successivo
Sommario
Articolo
Immagini e tabelle
Bibliografia
Autori
Articoli in questo Numero
Anteprima
PDF
Cita
CONDIVIDI
Article Category:
research-article
Pubblicato online:
18 ott 2019
Pagine:
93 - 104
Ricevuto:
03 lug 2018
Accettato:
22 lug 2019
DOI:
https://doi.org/10.21307/acee-2019-039
Parole chiave
Inverted siphon
,
Watercourse crossing
,
Structural damage
,
Concrete
,
Corrosion
,
Long-term utilization
© 2019 Jacek HULIMKA et al., published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Figure 1.
The view of the inverted siphon under the subway at 110th Street in NY [3]
Figure 2.
Layout of inverted siphon [9]: a) inclined, b) shaft. 1 – inlet, 2 – operating bridge, 3 – conduit pipe, 4 – outlet, 5 – shaft, 6 – horizontal conduit pipe
Figure 3.
The cross-section of the crossing and the location of the Klodnica River [16]
Figure 4.
The view and cross-section of the Klodnica siphon
Figure 5.
Visualisation of the siphon from the east side (inlet)
Figure 6.
The general view of the siphon from the south side (outlet)
Figure 7.
Damaged inlet of the duct with corroded reinforcement
Figure 8.
The expansion joint with no leak of water above
Figure 9.
Destroyed surface of the concrete
Figure 10.
Destroyed surface of the concrete with the streaks of acid calcium carbonate
Figure 11.
Strong corrosion of the steel sheet piles (inlet side)
Figure 12.
Bad condition of the steel sheet piles (outlet side)