Comparison of calculation and simulation of evacuation in real buildings
e
30 mar 2018
INFORMAZIONI SU QUESTO ARTICOLO
Pubblicato online: 30 mar 2018
Pagine: 107 - 114
DOI: https://doi.org/10.1515/sspjce-2018-0010
Parole chiave
© 2018 Martin Szénay et al., published by De Gruyter Open
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.
Each building must meet requirements for safe evacuation in order to prevent casualties. Therefore methods for evaluation of evacuation are used when designing buildings. In the paper, calculation methods were tested on three real buildings. The testing used methods of evacuation time calculation pursuant to Slovak standards and evacuation time calculation using the buildingExodus simulation software. If calculation methods have been suitably selected taking into account the nature of evacuation and at the same time if correct values of parameters were entered, we will be able to obtain almost identical times of evacuation in comparison with real results obtained from simulation. The difference can range from 1% to 27%.