Accesso libero

Preliminary estimate for reinforcement steel quantity in residential buildings

INFORMAZIONI SU QUESTO ARTICOLO

Cita

Abu Hammad, A., Alhaj Ali, S., Sweis, G., & Bashir, A. (2008). Prediction model for construction cost and duration in Jordan. Jordan Journal of Civil Engineering, 2(3), 250–266.Abu HammadA.Alhaj AliS.SweisG.BashirA.2008Prediction model for construction cost and duration in JordanJordan Journal of Civil Engineering23250266Search in Google Scholar

Ahuja, H. N., Dozzi, S. P., & Abourisk, S. M. (1994). Project Management Techniques in Planning and Controlling Construction Projects. John Wiley and Sons, Inc., New York.AhujaH. N.DozziS. P.AbouriskS. M.1994Project Management Techniques in Planning and Controlling Construction ProjectsJohn Wiley and Sons, Inc.New YorkSearch in Google Scholar

Bell, L. C., & Bozai, G. A. (1987). Preliminary cost estimating for highway construction projects. AACE Transactions, C.6.1–C.6.4.BellL. C.BozaiG. A.1987Preliminary cost estimating for highway construction projectsAACE TransactionsC.6.1C.6.4Search in Google Scholar

Enshassi, A., Hallaq, K., & Mohamed, S. (2006). Causes of contractor's business failure in developing countries: the case of Palestine. Journal of Construction in Developing Countries, 11(2), 1–14.EnshassiA.HallaqK.MohamedS.2006Causes of contractor's business failure in developing countries: the case of PalestineJournal of Construction in Developing Countries112114Search in Google Scholar

Enshassi, A., Mohamed, S., & Madi, I. (2007). Contractors’ perspectives towards factors affecting cost estimation in Palestine. Jordan Journal of Civil Engineering, 1(2), 186–193.EnshassiA.MohamedS.MadiI.2007Contractors’ perspectives towards factors affecting cost estimation in PalestineJordan Journal of Civil Engineering12186193Search in Google Scholar

Holm, L., Schaufelberger, J., Griffin, D., & Cole, T. (2005). Construction Cost Estimating: Process and Practices. Pearson Education, Inc., New Jersey.HolmL.SchaufelbergerJ.GriffinD.ColeT.2005Construction Cost Estimating: Process and PracticesPearson Education, Inc.New JerseySearch in Google Scholar

Jrade, A., & Alkass, S. (2007). Computer-integrated system for estimating the costs of building projects. Journal of Architectural Engineering, 13(4), 205–223.JradeA.AlkassS.2007Computer-integrated system for estimating the costs of building projectsJournal of Architectural Engineering13420522310.1061/(ASCE)1076-0431(2007)13:4(205)Search in Google Scholar

Lowe, D. J., Emsley, M. W., & Harding, A. (2006). Predicting construction cost using multiple regression techniques. Journal of Construction Engineering and Management. 132(7), pp. 750–758.LoweD. J.EmsleyM. W.HardingA.2006Predicting construction cost using multiple regression techniquesJournal of Construction Engineering and Management132775075810.1061/(ASCE)0733-9364(2006)132:7(750)Search in Google Scholar

Mahamid, I. (2011). Early cost estimating for road construction projects using multiple regression techniques. Australasian Journal of Construction Economics and Building, 11(4), pp. 78–101.MahamidI.2011Early cost estimating for road construction projects using multiple regression techniquesAustralasian Journal of Construction Economics and Building1147810110.5130/AJCEB.v11i4.2195Search in Google Scholar

Mahamid, I. (2013). Frequency of time overrun causes in road construction in Palestine: Contractors’ view. Organization, Technology and Management in Construction: An International Journal, 5(1), pp. 720–729.MahamidI.2013Frequency of time overrun causes in road construction in Palestine: Contractors’ viewOrganization, Technology and Management in Construction: An International Journal5172072910.5592/otmcj.2013.1.9Search in Google Scholar

Mahamid, I. (2015). Factors affecting cost estimating accuracy: evidence from Palestinian construction projects. International Journal of Management Science and Engineering Management, 10(2), pp. 117–125.MahamidI.2015Factors affecting cost estimating accuracy: evidence from Palestinian construction projectsInternational Journal of Management Science and Engineering Management10211712510.1080/17509653.2014.925843Search in Google Scholar

Navon, R. (2005). Automated project performance control of construction projects. Automation in Construction, 14, pp. 467–476.NavonR.2005Automated project performance control of construction projectsAutomation in Construction1446747610.1016/j.autcon.2004.09.006Search in Google Scholar

Palestinian Academic Society for the Study of International Affairs (PASSIA). (2002). Available at http://www.passia.org/.Palestinian Academic Society for the Study of International Affairs (PASSIA)2002Available at http://www.passia.org/Search in Google Scholar

Schexnayder, C. J., & Mayo, R. E. (2003). Construction Management Fundamentals. McGraw-Hill Higher Education, Boston, MA.SchexnayderC. J.MayoR. E.2003Construction Management FundamentalsMcGraw-Hill Higher EducationBoston, MASearch in Google Scholar

Sodikov, J. (2005). Cost estimation of highway projects in developing country: artificial neural network approach. Journal of the Eastern Asia Society for Transportation Studies, 6, pp. 1036–1047.SodikovJ.2005Cost estimation of highway projects in developing country: artificial neural network approachJournal of the Eastern Asia Society for Transportation Studies610361047Search in Google Scholar

United Nation (UN) Committee on Trade and Development. (1994). Prospect for Sustained Development of the Palestinian Economy in the West Bank and Gaza, 1990 to 2010: A Qualitative Framework. UN, Geneva.United Nation (UN) Committee on Trade and Development1994Prospect for Sustained Development of the Palestinian Economy in the West Bank and Gaza, 1990 to 2010: A Qualitative FrameworkUNGenevaSearch in Google Scholar

eISSN:
1847-6228
Lingua:
Inglese
Frequenza di pubblicazione:
Volume Open
Argomenti della rivista:
Engineering, Introductions and Overviews, other