Performing the process risk analysis, including the inventory of assets |
|
Developing the scenarios for potential threats |
|
Developing the major continuity plan together with the appendices, compliant to ISO 22301 |
|
Determination of the level of accepted risk together with the specification of potential losses, e.g., the threat of privacy loss by the data subjects |
|
Reconstruction of the processes to provide continuity |
|
Preparation of the plan for changes in the solutions possessed |
|
Preparation and testing of emergency plans/procedures |
|
Appointing and training of staff |
|
Testing for the procedures accepted |
|
Evaluation of procedure appropriateness for the maintenance of operating continuity |
|