Accès libre

Method of Power System Suistanable Development Optimization in Liberalized Market Conditions

À propos de cet article

Citez

Baltic Energy Market Interconnection Plan. (25 Nov. 2009). Final Report of the High Level Group (Vilnius).Search in Google Scholar

Bariss, U. (11 May, 2011). Development perspectives of electricity market in Latvia and Baltics. Riga (in Latvian).Search in Google Scholar

Baltic Regional Group Annual Report 2009. (2010).Search in Google Scholar

The Kurzeme Ring. Latvenergo (official information).http://www.latvenergo.lvSearch in Google Scholar

Estonian Energy in Figures, 2007. (2008). Estonian Ministry of Economic Affairs and Communications.http://www.m-km.ee/public/esto-nian_energy_in_figures.pdfSearch in Google Scholar

Elering: Company Report 2010. http://www.businessrevi-eweurope.eu/companyeports/el-ering-oueSearch in Google Scholar

European Network of Transmission System Operators for Electricity. (2010). Scenario Outlook and System Adequacy Forecast 2011-2025. Brussels: ENTSO-E AISBL.Search in Google Scholar

Bariss, U. (21 Sept., 2010). Latvian investments in energy sector: the desired and real. (in Latvian).Search in Google Scholar

Krishans, Z., Mutule, A., Merkuryev, Y., & Oleinikova, I. (2011). Dynamic Management of Sustainable Development: Methods for Large Technical Systems. Berlin: Springer.10.1007/978-0-85729-062-5Search in Google Scholar

ISSN:
0868-8257
Langue:
Anglais
Périodicité:
6 fois par an
Sujets de la revue:
Physics, Technical and Applied Physics