Accès libre

Model and data management issues in the integrated assessment of existing building stocks

À propos de cet article

Citez

Fig. 1

The life cycle of a building (https://hydronic-flow-control.com/en/page/our-services--building-life-cycle).
The life cycle of a building (https://hydronic-flow-control.com/en/page/our-services--building-life-cycle).

Fig. 2

Comparison of the state-of-the-art as-built BIM data processing and SCI_BIM integrated data assessment and modeling method (based on Huber et al., 2011 and Volk et al., 2014).
Comparison of the state-of-the-art as-built BIM data processing and SCI_BIM integrated data assessment and modeling method (based on Huber et al., 2011 and Volk et al., 2014).

Fig. 3

Process design.
Process design.

Fig. 4

Data and process management framework.
Data and process management framework.

Fig. 5

Point cloud of the use case and the surrounding (© C1).
Point cloud of the use case and the surrounding (© C1).

Fig. 6

Panorama of the interior of the use case (© C1).
Panorama of the interior of the use case (© C1).
eISSN:
1847-6228
Langue:
Anglais
Périodicité:
Volume Open
Sujets de la revue:
Engineering, Introductions and Overviews, other