[Alhazmi, T., & McCaffer, R. (2000). Project procurement system selection model. Journal of Construction Engineering and Management, 126(3), pp. 176-184.10.1061/(ASCE)0733-9364(2000)126:3(176)]Search in Google Scholar
[Anagnostopoulos, K., & Vavatsikos, A. (2006). “An AHP model for construction contractor prequalification, operational research”. An International Journal, 6, pp. 333-346.10.1007/BF02941261]Search in Google Scholar
[Asgharizadeh, E., & Nasrollahi, M. (2009). Identification and selection of weight of factors affecting contractor selection in construction projects. Journal of Management Research, winter 2009(2), pp. 105-122.]Search in Google Scholar
[Fong, P. S., & Choi, S. (2000). Final contractor selection using the analytical hierarchy process. Construction Management and Economics, 18, pp. 547-577.10.1080/014461900407356]Search in Google Scholar
[Haghighi Fard, A. (2010), Selection of machinery in surface mines using analytic hierarchy process. Master thesis, Amirkabir University of Technology, Tehran, Iran]Search in Google Scholar
[Holt, G. D. (2010). Classifying construction contractors. Building Research and Information, 25(6), pp. 374-382.10.1080/096132197370200]Search in Google Scholar
[Huang, X. (2011). An analysis of the selection of project contractor in the construction management process. International Journal of Business and Management, 6(3), pp. 184-189.10.5539/ijbm.v6n3p184]Search in Google Scholar
[Iyer, K. C., & Jha, K. N. (2005). Factors affecting cost performance: evidence from Indian construction projects. International Journal of Project Management, 23(4), pp. 283-295.10.1016/j.ijproman.2004.10.003]Search in Google Scholar
[Jaselskis, E. J., & Russell, J. S. (1992). Risk analysis approach to selection of contractor evaluation method. Construction Engineering Management, 118(4), pp. 814-821.10.1061/(ASCE)0733-9364(1992)118:4(814)]Search in Google Scholar
[Laryea, S., & Hughes, W. (2011). Risk and price in the bidding process of contractors. Journal of Construction Management and Engineering, 137(4), pp. 248-258.10.1061/(ASCE)CO.1943-7862.0000293]Search in Google Scholar
[Ledezema, E. L., & Fernandez, N. Q. (2012). Risk management in the bidding process. Master thesis, KTH Royal Institute of Technology in Stockholm.]Search in Google Scholar
[Mohagher, A., Kashi, K., & Salami, H. (2012). Selection of contractor for construction projects using a combination of multi-attribute utility theory and Electre method in the base Company. Journal of Industrial Management, summer 2012(8).]Search in Google Scholar
[Nieto-Morote, A., & Ruz-Vila, F. (2012). A fuzzy multi-criteria decision-making model for construction contractor prequalification. Automation in Construction., 25, pp. 8-19.10.1016/j.autcon.2012.04.004]Search in Google Scholar
[Plenkiewicz, E. (2009). Contractor prequalification model using fuzzy sets. Journal of Civil Engineering and Management, 15(4), pp. 377-385.]Search in Google Scholar
[Rajae, H., & Hazrati, A. (2007). Fuzzy Saw and Fuzzy Topsis multi-criteria decision-making models for pre-qualification and selection of contractors and comparing the results. In: Project Management proceeding of the 4th International Conference in Tehran, Iran, 2007, pp. 115-132.]Search in Google Scholar
[Sari, A., & El-Sayegh, S.M. (2007). Factors Affecting the Selection of the Appropriate Construction Management at Risk Contractor. In: Latin American and Caribbean proceeding of the international Conference for Engineering and Technology in Tampico, México, 2007, pp. 5C.1-2 - 5C.1-8.]Search in Google Scholar
[Sik, P. A., Fong, W., & Choi, K. Y. (2000). Final contractor selection using the analytical hierarchy process. Construction management and economics, 18(5), pp. 547-557.10.1080/014461900407356]Search in Google Scholar
[Zavadskas, E. K., Turskis, Z., & Antucheviciene, J. (2015). Selecting a contractor by using a novel method for multiple attribute analysis: weighted aggregated sum product assessment with grey values (WASPAS-G). Studies in Informatics and Control, 24(2), pp. 141-150.10.24846/v24i2y201502]Search in Google Scholar