[Abdul-Rahman, H., Mohammed Ali Berawi, A. R. Berawi, O. Mohamed, M. Othman, and I. A. Yahya. (2006). “Delay mitigation in the Malaysian construction industry”, Journal of construction engineering and management 132, no. 2: 125-133.10.1061/(ASCE)0733-9364(2006)132:2(125)]Search in Google Scholar
[Ahmed, S. M., Azhar, S., Kappagantula, P., & Gollapudi, D. (2003). “Delays in: A brief study of the Florida construction industry”, In Proceeding of the 39th Annual Conference of the Associated Schools of Construction. Clemson, South Carolina: Clemson University. Final report, Miami F (Vol. 1, p. 33174).]Search in Google Scholar
[Aibinu, A. A., & Jagboro, G. O. (2002). “The effects of construction delays on project delivery in Nigerian construction industry”, International journal of project management, 20(8), 593-599.10.1016/S0263-7863(02)00028-5]Search in Google Scholar
[Bromilow, F. J. (1974). “Measurement and scheduling of construction time and cost performance in the building industry”, The Chartered Builder, 10(9), 57-65.]Search in Google Scholar
[Jhatial, A. A., Sohu, S., Bhatti, N. K., Lakhiar, M. T., & Oad, R. (2018). “Effect of steel fibres on the compressive and flexural strength of concrete”, International journal of advanced and applied sciences, 5(10), 16-21.10.21833/ijaas.2018.10.003]Search in Google Scholar
[Kumaraswamy, M. M., & Chan, D. W. (1998). “Contributors to construction delays”, Construction Management & Economics, 16(1), 17-29.10.1080/014461998372556]Search in Google Scholar
[Frimpong, Y., & Oluwoye, J. (2003). “Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana”, Journal of Construction Research, 4(02), 175-187.10.1142/S1609945103000418]Search in Google Scholar
[Harris, M., & Fraser, I. (2002). “Natural resource accounting in theory and practice: A critical assessment”, Australian Journal of Agricultural and Resource Economics, 46(2), 139-192.10.1111/1467-8489.00018]Search in Google Scholar
[Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997). “Factors influencing construction time and cost overruns on high-rise projects in Indonesia”, Construction Management & Economics, 15(1), 83-94.10.1080/014461997373132]Search in Google Scholar
[Lundin, R. A., Tryggestad, K., Amoatey, C. T., Ameyaw, Y. A., Adaku, E., & Famiyeh, S. (2015). “Analysing delay causes and effects in Ghanaian state housing construction projects”, International Journal of Managing Projects in Business.]Search in Google Scholar
[Keerio, M. A., Sohu, S., Mangi, S. A., Bhatti, N. U. K., & Ullah, K. (2017). “Significant Causative Factors of Delay in Road Construction Projects in Pakistan”, Engineering Science and Technology International Research Journal, Vol.1, No.2, 2017, pp. 59 – 63.]Search in Google Scholar
[Sambasivan, M., & Soon, Y. W. (2007). “Causes and effects of delays in Malaysian construction industry”, International Journal of project management, 25(5), 517-526.10.1016/j.ijproman.2006.11.007]Search in Google Scholar
[Shen, L. Y. (1997). “Project risk management in Hong Kong”, International journal of project management, 15(2), 101-105.10.1016/S0263-7863(96)00045-2]Search in Google Scholar
[Shen, L. Y., Fisher, N., & Sun, C. S. (2001). “An analysis of the distribution of cost variance for building projects”, Journal of Construction Research, 2(1), 35-40.]Search in Google Scholar
[Sohu, S., Ullah, K., Jhatial, A. A., Jaffar, M., & Lakhiar, M. T. (2018a). “Factors adversely affecting quality in highway projects of Pakistan”, International Journal of Advanced and Applied Sciences, 5(10), 62-66.]Search in Google Scholar
[Sohu, S., Jhatial, A. A., Ullah, K., Lakhiar, M. T., & Shahzaib, J. (2018b). “Determining the critical success factors for highway construction projects in Pakistan”, Engineering, Technology & Applied Science Research, 8(2), 2685-2688.10.48084/etasr.1866]Search in Google Scholar
[Mehr, S. Y., & Omran, A. (2013). “Examining The Challenges Affect On The Effectiveness Of Materials Management In The Malaysian Construction Industry”, International Journal of Academic Research, 5(2).10.7813/2075-4124.2013/5-2/A.7]Search in Google Scholar
[Ullah, K., Khan, M. S., Lakhiar, M. T., Vighio, A. A., & Sohu, S. (2018). “Ranking of Effects of Construction Delay: Evidence from Malaysian Building Projects”, Journal of Applied Engineering Sciences, 8(1), 79-84.10.2478/jaes-2018-0011]Search in Google Scholar