[
Adhyapak, R., Baby, A., & Koppuravuri, S. (2019). Reduction in call handling time in transportation service industry using lean Six Sigma DMAIC methodology. International Journal of Productivity and Quality Management, 27(3), 352-368. doi: 10.1504/ijpqm.2019.101495
]Search in Google Scholar
[
Aldaihani, M., Alhussainan, A., & Terro, A. (2017). A framework for implementing Six Sigma methodology to accredit university campus facilities in Kuwait. International Journal of Productivity and Quality Management, 20(2), 217-237. doi: 10.1504/ijpqm.2017.081481
]Search in Google Scholar
[
Bagherian, A., Gershon, M., & Swarnakar, V. (2022). Role of employee training on Six Sigma implementation’s success: an empirical study. International Journal of Six Sigma and Competitive Advantage, 14(2), 247-278. doi: 10.1504/ijssca.2022.124975
]Search in Google Scholar
[
Banquez, A., & Fontalvo, T. (2023). Global performance evaluation based on multivariable statistical control of a public utility company. Pesquisa operacional, 43. doi:10.1590/0101-7438.2023.043.00270103
]Search in Google Scholar
[
Barreto, R., & Herrera, R. (2022). Application of a proposed reliability analysis multivariate capability index on manufacturing processes. Quality Engineering, 34(1), 1-15. doi: 10.1080/08982112.2021.1973035
]Search in Google Scholar
[
Belcher, J. (2018). Developing a quality improvement plan for a small engineering firm in the USA with Six Sigma methodologies. International Journal of Productivity and Quality Management, 24(1), 1-11. doi: 10.1504/ijpqm.2018.091169
]Search in Google Scholar
[
Bothe, D. (1991). A Capability study for an entire product. ASQC Quality Control Transactions.
]Search in Google Scholar
[
Castagliola, P., Maravelakis, P., Psarakis, S., & Vännman, K. (2009). Monitoring capability indices using run rules. Journal of Quality in Maintenance, Engineering, 15(4), 358-370. doi: 10.1108/13552510910997733
]Search in Google Scholar
[
Castagliola, P., Maravelakis, P., Psarakis, S., & Vännman, K. (2009). Monitoring capability indices using run rules. Journal of Quality in Maintenance, Engineering, 15(4), 358-370. doi: 10.1108/13552510910997733
]Search in Google Scholar
[
Chan, L., Cheng, S., & Spiring, F. (1988). The robustness of the process capability index Cp to departures from normality’. In Matusita, K. (Ed.), Statistical Theory and Data Analysis II (pp. 223–239). North Holland, Amsterdam.
]Search in Google Scholar
[
Chen, K., Pearn W., & Lin, P. (2003). Capability Measures for Processes with Multiple Characteristics. Quality and Reliability Engineering International Qual, 19, 101-110. doi: 10.1002/qre.513
]Search in Google Scholar
[
Chia, H. (2023). A simple test to determine the contributors of fraction nonconforming shifts in a multivariate binomial process. Quality Engineering, 35(2), 279-289. doi: 10.1080/08982112.2022.2124876
]Search in Google Scholar
[
Clements, J. (1989). Process capability calculations for non-normal distributions. Quality Progress, 95-100.
]Search in Google Scholar
[
Cumea, G. (2013). Índices de Capacidad Multivariados. Congreso internacional de arquitectura e ingeniería sostenible, México.
]Search in Google Scholar
[
Das, A., Suman, S., & Sinha, A. (2017). Development of multivariate process monitoring strategy for a typical process industry. International Journal of Productivity and Quality Management, 22(1), 1-21. doi: 10.1504/IJPQM.2017.085844
]Search in Google Scholar
[
De la Hoz, E., Fontalvo, T., & Fontalvo, O. (2020). Evaluación de la calidad del servicio por medio de Seis Sigma en un centro de atención documental en una universidad. Formación universitaria, 13(2), 93-102. doi: 10.4067/s0718-50062020000200093
]Search in Google Scholar
[
De La Hoz, E., Zuluaga, R., & Suarez, M. (2023). A Six Sigma and DEA approach for learning outcomes assessment at industrial engineering programs. International Journal of Six Sigma and Competitive Advantage, 14(3), 279-299. doi: 10.1504/ijssca.2023.130283
]Search in Google Scholar
[
Fontalvo, T., & Banquez, A. (2023). Comparative analysis of multivariate capacity indicators for serial and parallel systems. International Journal of Six Sigma and Competitive Advantage, 14(4). doi: 10.1504/ijssca.2023.10058903
]Search in Google Scholar
[
Fontalvo, T., De La Hoz, E., & Fontalvo, O. (2022a). Six Sigma method to assess the quality of the service in a gas utility company. International Journal of Process Management and Benchmarking, 12(2), 220-232. doi: 10.1504/ijpmb.2022.121628
]Search in Google Scholar
[
Fontalvo, T., Fontalvo, O., & Herrera, R. (2020). Monitoring and control of the quality dimensions performance of a service center in a high education institution. Información Tecnológica, 31(3), 113-120. doi: 10.4067/s0718-07642020000300113
]Search in Google Scholar
[
Fontalvo, T., Herrera, R., & Fontalvo, O. (2021). Método de evaluación de la capacidad multidimensional del nivel sigma de las dimensiones del servicio en un call center de una empresa telefónica. Revista Internacional de Gestión de la Productividad y la Calidad, 34(3), 319-335. doi: 10.4067/s0718-50062020000600247
]Search in Google Scholar
[
Fontalvo, T., Herrera, R., & Gonzalez, Y. (2022b). Yield-level performance of quality dimensions trough T2 charts and multivariate capacity indicators applied to a fumigation services company. International Journal of Industrial and Systems Engineering, 41(1), 71-90. doi: 10.1504/ijise.2022.122973
]Search in Google Scholar
[
Fontalvo, T., Herrera, R., & Zambrano, J. (2022c). Three-phase method to assess the logistics service using Six Sigma metrics, Hotelling’s T-square control chart and a Main component capacity indicator. International Journal of Productivity and Quality Management, 35(1), 17-39. doi: 10.1504/IJPQM.2022.120720
]Search in Google Scholar
[
García, A., Plaza, A., Joseph, I., & Chong, A. (2020). Optimal multivariate control charts based on linear combination of normal variables. International Journal of Industrial and Systems Engineering, 34(2), 165-192. doi: 10.1504/ijise.2020.105289
]Search in Google Scholar
[
Herrera, R. (2018). Índices de Capacidad Multivariados. Puerto Colombia, Atlántico: Universidad del Atlántico Nuevas Propuestas. doi: 10.18273/revuin.v18n3-2019011
]Search in Google Scholar
[
Jackson, J. (1980). Main Component and Factor Analysis: Part 1 Main Components. Journal of Quality Technology, 12, 201-213.
]Search in Google Scholar
[
Madhani, P. (2022). Lean Six Sigma deployment in HR: enhancing business performance. International Journal of Human Resources Development and Management, 22(1/2), 75-97. doi: 10.1504/ijhrdm.2022.121314
]Search in Google Scholar
[
Maged, A. M., Haridy, S., Kaytbay, S., & Bhuiyan, N. (2019). Continuous improvement of injection moulding using Six Sigma: case study. International Journal of Industrial and Systems Engineering. (2019). Continuous improvement of injection moulding using Six Sigma: case study. International Journal of Industrial and Systems Engineering, 32(2), 243-266. doi: 10.1504/ijise.2019.10021839
]Search in Google Scholar
[
Najm, A., Ridha, M., & Aboyasin, N. (2022). Six Sigma and market performance in Jordanian hospitals. International Journal of Value Chain Management, 13(2), 141-159. doi: 10.1504/ijvcm.2022.123547
]Search in Google Scholar
[
Rana, P, Das, A., Suman, S., & MaitiRana, J. (2018). A statistical monitoring strategy for a pulp and paper industry. International Journal of Industrial and Systems Engineering, 28(4), 530-545. doi: 10.1504/ijise.2018.090449
]Search in Google Scholar
[
Shahriari, H., & Abdollahzadeh, M. (2009). A new multivariate process capability vector. Quality Engineering, 21, 290-299. doi: 10.1080/08982110902873605
]Search in Google Scholar
[
Sharma, J., Tyagi, M., Panchal, D., & Singh, R. (2022). Contemplation of food industry attributes confronted in smooth adoption of Lean Six Sigma practices. International Journal of Six Sigma and Competitive Advantage, 14(1), 32-69. doi: 10.1504/ijssca.2022.124294
]Search in Google Scholar
[
Shinde, R., & Khadse, K. (2009). Multivariate process capability using main component analysis. Ltd. Quality and Reliability Engineering International, 25(1), 69-77. doi: 10.1002/qre.954
]Search in Google Scholar
[
Sikder, S., Mukherjee, I., & Chandra, S. (2019). A synergic multivariate statistical process control framework for monitoring, diagnosis, and adjustment of multiple response abrasive machining processes. International Journal of Industrial and Systems Engineering, 33(3), 314-345. doi: 10.1504/IJISE.2019.103443
]Search in Google Scholar
[
Sodhi, H. (2023). A comparative analysis of lean manufacturing, Six Sigma and Lean Six Sigma for their application in manufacturing organisations. International Journal of Process Management and Benchmarking, 13(1), 127-144. doi: 10.1504/ijpmb.2023.127902
]Search in Google Scholar
[
Sodhi, H., Singh, B., & Singh, D. (2023). SWOT analysis of Lean Six Sigma: a review. International Journal of Business Excellence, 29(2), 162-184. doi: 10.1504/ijbex.2023.128685
]Search in Google Scholar
[
Sodhi, H., Singh, D., & Singh, B. (2022). Implementation of Lean Six Sigma model for scrap reduction in machining sector. International Journal of Business Excellence, 27(1), 110-124. doi: 10.1504/ijbex.2022.123032
]Search in Google Scholar
[
Sreedharan, V. R., Trehan, R., Dhanya, M., & Arunprasad, P. (2020). Lean Six Sigma implementation in an OEM: a case-based approach. International Journal of Process Management and Benchmarking, 10(2), 147. doi: 10.1504/ijpmb.2020.106789
]Search in Google Scholar
[
Taam, W., Subbaiah, P., & Liddy, J. (1993). A note on multivariate capability indices. Journal of Applied Statistics, 20(3), 339-351. doi: 10.1080/02664769300000035
]Search in Google Scholar
[
Tamminen, S., Ferreira, E., Tiensuu, H., Helaakoski, H., Kyllönen, V., Jokisaari, J., Puukko, E., & Röning, J. (2019). An online quality monitoring tool for information acquisition and sharing in manufacturing: requirements and solutions for the steel industry. International Journal of Industrial and Systems Engineering, 33(3), 291-313. doi: 10.1504/ijise.2019.10024998
]Search in Google Scholar
[
Wang, F., & Chen, J. (1998). Capability index using principal components analysis. Quality Engineering, 11(1), 21-27. doi: 10.1080/08982119808919208
]Search in Google Scholar
[
Wang, F., & Du, T. C. T. (2000). Using principal component analysis in process performance for multivariate data. Omega, 28(2), 185-194. doi: 10.1016/S0305-0483(99)00036-5
]Search in Google Scholar
[
Wierda, S. (1994). Multivariate statistical process control - recent results and directions for future research. Statistica Neerlandica, 48(2), 147–168. doi: 10.1111/j.1467-9574.1994.tb01439.x
]Search in Google Scholar