[Aaltonen, K., & Turkulainen, V. (2018). Creating relational capital through socialization in project alliances. International Journal of Operations & Production Management, 38(6), 1387-1421.10.1108/IJOPM-02-2017-0091]Search in Google Scholar
[Ahsan, K., & Paul, S. K. (2018). Procurement issues in donor-funded international development projects. Journal of Management in Engineering, 34(6), 01-44.10.1061/(ASCE)ME.1943-5479.0000648]Search in Google Scholar
[Alsuliman, J. A. (2019). Causes of delay in Saudi public construction projects. Alexandria Engineering Journal, 58(2), 801-808.10.1016/j.aej.2019.07.002]Search in Google Scholar
[Ansah, R. H., & Sorooshian, S. (2018). 4P Delays in Project Management. Engineering, Construction and Architectural Management, 25(1), 62-76.10.1108/ECAM-09-2016-0199]Search in Google Scholar
[Baal, A., & Outridge, D. (2020). Subsidiary project plan requirements for public construction projects in Trinidad and Tobago. The International Conference on Emerging Trends in Engineering and Technology (IConETech 2020).10.47412/JRND8949]Search in Google Scholar
[Belton, I., MacDonald, A., Wright, G., & Hamlin, I. (2019). Improving the practical application of the Delphi method in group-based judgment: A six-step prescription for a well-founded and defensible process. Technological Forecasting and Social Change, 147(1), 72-82.10.1016/j.techfore.2019.07.002]Search in Google Scholar
[Bodea, C-N., & Purnus, A. (2016). FIDIC Contracts: Analysis of the Impact of General and Particular Conditions on the Financial Risk Management in Romanian Infrastructure Projects. Juridical Tribune Journal, 6(2), 167-181.]Search in Google Scholar
[Braun, V., & Clarke, V. (2016). (Mis) conceptualising themes, thematic analysis, and other problems with Fugard and Potts’ (2015) sample-size tool for thematic analysis. International Journal of Social Research Methodology, 19(6), 739-743.10.1080/13645579.2016.1195588]Search in Google Scholar
[Cosa, S. (2020). Exploring the factors responsible for the delays in the execution of construction projects by the national department of public works and infrastructure in South Africa. Johannesburg: University of Johannesburg. Retrieved fromhttp://hdl.handle.net/102000/0002]Search in Google Scholar
[Darko, A., Zhang, C., & Chan, A. P. (2017). Drivers for green building: A review of empirical studies. Habitat International, 60(1), 34-49.10.1016/j.habitatint.2016.12.007]Search in Google Scholar
[Davis, K. (2018). Reconciling the views of project success: A multiple stakeholder model. Project Management Journal, 49(5), 38-47.10.1177/8756972818786663]Search in Google Scholar
[Deep, S., Bilal, M., & Ahmad, S. (2017). A study of various factors affecting contractor’s performance in lowest bid award construction projects. International Journal of Civil Engineering and Technology, 8(2), 28-33.]Search in Google Scholar
[Durdyev, S., & Hosseini, M. R. (2019). Causes of delays on construction projects: a comprehensive list. International Journal of Managing Projects in Business, 1(1), 01-28.10.1108/IJMPB-09-2018-0178]Search in Google Scholar
[Fillion, G., Koffi, V., & Ekionea, J-P. B. (2017). Peter Senge’s Learning Organization: A Critical View and the Addition of Some New Concepts to Actualize Theory and Practice. Journal of Organizational Culture, Communications and Conflict, 19(3), 73-102.]Search in Google Scholar
[Fong, C. K., Avetisyan, H. G., & Cui, Q. (2014). Understanding the Sustainable Outcome of Project Delivery. Methods in the Built Environment, Organization, Technology & Management in Construction, 6(3), 1141-1155.10.5592/otmcj.2014.3.9]Search in Google Scholar
[Franco, L. A., & Nielsen, M. F. (2018). Examining group facilitation in situ: the use of formulations in facilitation practice. Group Decision and Negotiation, 27(5), 735-756.10.1007/s10726-018-9577-7]Search in Google Scholar
[Gambo, N., Said, I., & Ismail, R. (2016). Influences of Cost Factors Affecting Technical Performance of Local Government Projects in Nigeria: A Partial Least Square-Structural Equation Modeling (PLS-SEM) Approach. Journal of Construction in Developing Countries, (21), 85-111.10.21315/jcdc2016.21.1.5]Search in Google Scholar
[Gebrehiwet, T., & Luo, H. (2017). Analysis of Delay Impact on Construction Project Based on RII and Correlation Coefficient: Empirical Study. Procedia Engineering, 196, 366-374.10.1016/j.proeng.2017.07.212]Search in Google Scholar
[Gomes, C. F., & Yasin, M. M. (2017). Toward promoting effective strategic performance: the relevance of the alignment of performance measurement and competitive strategic choices. International Journal of Business Excellence, 12(3), 329-350.10.1504/IJBEX.2017.084445]Search in Google Scholar
[Gunduz, M., & Abu Hassan, M. H. A. (2017). Mapping the industrial perception of delay data through importance rating. Arabian Journal for Science and Engineering, 42(1), 3799-3808.10.1007/s13369-017-2477-3]Search in Google Scholar
[Hurta, H., Jazouli, A., Koplyay, T., & Motaghi, H. (2017). Mergers and acquisitions from the perspective of project management. Polish Journal of Management Studies, 15(2), 100-114.10.17512/pjms.2017.15.2.10]Search in Google Scholar
[Janićijević, N. (2017). Organizational Models as Configuration of Structure, Culture, Leadership, Control and Change Strategy. Economic Annals, LXII(213), 67-91.10.2298/EKA1713067J]Search in Google Scholar
[Jigeesh, N., & Rao, N. S. N. (2015). Analysis and control of issues that delay pharmaceutical projects. Business: Theory and Practice, 16(3), 252-263. doi: 10.3846/btp.2015.49110.3846/btp.2015.491]Search in Google Scholar
[Knol, W. H., Slomp, J., Schouteten, R. L., & Lauche, K. (2018). Implementing lean practices in manufacturing SMEs: testing ‘critical success factors’ using Necessary Condition Analysis. International Journal of Production Research, 56(11), 3955-3973.10.1080/00207543.2017.1419583]Search in Google Scholar
[Kuchta, D., Klaus-Rosińska, A., Ropuszyńska-Surma, E., & Walecka-Jankowska, K. (2017). Threats to research projects across the project life cycle. Forum Scientiae Oeconomia, 5(3), 71-87. doi: 10.23762/FSO_vol-5no3_17_5]Search in Google Scholar
[Lee, T. R., & Mouritsen, S. C. (2018). Judging Ordinary Meaning. The Yale Law Journal, 1(1),788-879.]Search in Google Scholar
[Lindahl, G., & Ryd, N. (2007). Clients’ goals and the construction project management process. Emerald Group Publishing Limited, 25(3/4), 147-156.10.1108/02632770710729737]Search in Google Scholar
[Liu, L. (2020). Research on Performance and Decision-making Method of Project Management Mode. IOP Conference Series: Earth and Environmental Science, 526(1), 01-07.10.1088/1755-1315/526/1/012219]Search in Google Scholar
[Mahdi, I. M., Ebid, A. M., & Khallaf, R. (2020). Decision support system for optimum soft clay improvement technique for highway construction projects. Ain Shams Engineering Journal, 11(1), 213-223.10.1016/j.asej.2019.08.007]Search in Google Scholar
[Maslach, D., Branzei, O., Rerup, C., & Zbaracki, M. J. (2018). Noise as signal in learning from rare events. Organization Science, 29(2), 225-246.10.1287/orsc.2017.1179]Search in Google Scholar
[Mosly, I. (2016). Construction Project Delivery System Selection Framework: Professional Service Firms’ Perspective. Journal of Civil Engineering and Architecture, 10(1), 368-378.10.17265/1934-7359/2016.03.012]Search in Google Scholar
[Mukhtar, M., Sudarmi, S., Wahyudi, M., & Burmansah, B. (2020). The Information System Development Based on Knowledge Management in Higher Education Institution. International Journal of Higher Education, 9(3), 98-108.10.5430/ijhe.v9n3p98]Search in Google Scholar
[Nijhuis, S., Vrijhoef, R., & Kessels, J. (2018). Tackling Project Management Competence Research. Project Management Journal, 49(3), 62-81.10.1177/8756972818770591]Search in Google Scholar
[Ogbeifun E. (2018). Performance management as a tool for performance improvement in the management of built facilities. Journal of Construction Project Management and Innovation, 8(2), 1852-1871.]Search in Google Scholar
[Ogbeifun E., Mbohwa, C., & Pretorius, J. H. C. (2018). Fragmentation of capital development projects: A tool for job creation and skill development. Proceedings of the 34th Conference of the Association of Researchers in Construction Management (ARCOM), Belfast, UK, 717-726.]Search in Google Scholar
[Ogbeifun, E., Mbohwa, C., & Pretorius, J. H. C. (2016). Complementing a Delphi Exercise with a Focus Group Session. Proceedings of the 2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), Bali, Indonesia, 1269-1273.10.1109/IEEM.2016.7798082]Search in Google Scholar
[Ogbeifun, E., Mbohwa, C., & Pretorius, J. H. C. (2016a). Developing Key Performance Indicators using the Delphi Technique. FUTY Journal of the Environment, 10(1), 27-38.]Search in Google Scholar
[Ogbeifun, E., Mbohwa, C., & Pretorius, J. H. C. (2017). Achieving Consensus Devoid of Complicity: Adopting the Delphi Technique. International Journal of Productivity and Performance Management, 66(6), 766-779.10.1108/IJPPM-08-2015-0112]Search in Google Scholar
[Okwir, S., Nudurupati, S. S., Ginieis, M., & Angelis, J. (2018). Performance measurement and management systems: a perspective from complexity theory. International Journal of Management Reviews, 20(3), 731-754.10.1111/ijmr.12184]Search in Google Scholar
[Oun, T. A. (2016). The Association of Knowledge Management and Project Management: An Enterprise-wide Approach Based on Stankosky’s Four Pillar of Knowledge Management and PMI’s Project Management Knowledge Areas. ProQuest Dissertations & Theses Global.]Search in Google Scholar
[Pal, R., Wang, P., & Liang, X. (2017). The critical factors in managing relationships in international engineering, procurement, and construction (IEPC) projects of Chinese organizations. International Journal of Project Management, 35(7), 1225-1237.10.1016/j.ijproman.2017.05.010]Search in Google Scholar
[Pourrashidi, R., Mehranpour, M., & Nick, M. F. (2017). Human resources management: challenges and solutions. Helix, 8, 998-1001.]Search in Google Scholar
[Rao, B. P. (2016). Delay Analysis of Construction Projects. Journal of IT and Economic Development, 7(1), 15-24.]Search in Google Scholar
[Reefke, H., & Sundaram, D. (2017). Key themes and research opportunities in sustainable supply chain management–identification and evaluation. Omega, 66(1), 195-211.10.1016/j.omega.2016.02.003]Search in Google Scholar
[Rodriguez-Labajos, L., Thomson, C., & O’Brien, G. (2016). Exploring the attributes and KPI’s adopted by international healthcare providers to measure the performance of their estates at the strategic level. In Proceedings of the 32nd Annual ARCOM Conference, 2(1), 1213-1223.]Search in Google Scholar
[Rosa, A. C. M., & Broday, E. E. (2018). Comparative analysis between the industrial and service sectors: a literature review of the improvements obtained through the application of lean six sigma. International Journal for Quality Research, 12(1), 227-252.]Search in Google Scholar
[Saunila, M. (2017). Understanding innovation performance measurement in SMEs. Measuring Business Excellence, 21(1), 1-16.10.1108/MBE-01-2016-0005]Search in Google Scholar
[Shao, Z., Feng, Y., & Hu, Q. (2017). Impact of top management leadership styles on ERP assimilation and the role of organizational learning. Information & Management, 54(7), 902-919.10.1016/j.im.2017.01.005]Search in Google Scholar
[Sharma, S. P. (2017). US Government Program Managers’ Competencies to Manage Satellite Acquisition Programs. Doctoral dissertation, Northcentral University.]Search in Google Scholar
[Shaw, T. (2018). Sustainable Leadership: A Delphi Study. ProQuest LLC.]Search in Google Scholar
[Shohet, I. M., & Nobili, L. (2017). Application of key performance indicators for maintenance management of clinics facilities. International Journal of Strategic Property Management, 21(1), 58-7.10.3846/1648715X.2016.1245684]Search in Google Scholar
[Sierra-Varela, L. A., Yepes, V., & Pellicer, E. (2018). A Review of Multi-Criteria Assessment of the Social Sustainability of Infrastructures. Journal of Cleaner Production, 187(1), 496-513.10.1016/j.jclepro.2018.03.022]Search in Google Scholar
[Solomon, O. B., Adeniyi, O., & Oluwaseyi, A. A. (2017). Investigation into the Causes of Delay in Land Acquisition for PPP Projects in Developing Countries. Journal of Engineering, Design and Technology, 15(4), 552-570.10.1108/JEDT-05-2016-0029]Search in Google Scholar
[Strasser, A. (2017). Delphi method variants in information systems research: Taxonomy development and application. Electronic Journal of Business Research Methods, 15(2), 120-133.]Search in Google Scholar
[Szpilko, D. (2020). Foresight as a Tool for the Planning and Implementation of Visions for Smart City Development. Energies, 13(7), 1782. doi:10.3390/en1307178210.3390/en13071782]Search in Google Scholar
[Tan, Y., Xue, B., & Cheung, Y. T. (2017). Relationships between main contractors and subcontractors and their impacts on main contractor competitiveness: An empirical study in Hong Kong. Journal of Construction Engineering and Management, 143(7), 01-12.10.1061/(ASCE)CO.1943-7862.0001311]Search in Google Scholar
[The Oak Ridge Associated Universities. Retrieved fromhttps://www.orau.gov/]Search in Google Scholar
[Varga-Atkins, T., McIsaac, J., & Willis, I. (2017). Focus Group meets Nominal Group Technique: an effective combination for student evaluation? Innovations in Education and Teaching International, 54(4), 289-300.10.1080/14703297.2015.1058721]Search in Google Scholar
[Yap, J. B. H., & Skitmore, M. (2018). Investigating design changes in Malaysian building projects. Architectural Engineering and Design Management, 14(3), 218-238.10.1080/17452007.2017.1384714]Search in Google Scholar
[Zadeh, M. T., Dehghan, R., Ruwanpura, J. Y., Jerge, G., & Ahadzie, D. (2016). An Index to Assess Project Management Competencies in Managing Design Changes. International Journal of Construction Engineering and Management, 5(1), 11-24.]Search in Google Scholar