Methodology for bottleneck identification in a production system when implementing TOC
Publié en ligne: 23 juil. 2020
Pages: 74 - 82
Reçu: 30 janv. 2020
Accepté: 10 juin 2020
DOI: https://doi.org/10.2478/emj-2020-0012
Mots clés
© 2020 Wieslaw Urban et al., published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.
For TOC (Theory of Constraints) implementation in a production system, the determination of the system's bottleneck is a crucial step. Effective bottleneck identification allows setting priorities for the improvement of a production system. The article deals with a significant problem for the manufacturing industry related to the location of a bottleneck. The article aims for a detailed analysis of methods for bottleneck identification based on a comprehensive literature review and the design of a generalised methodology for bottleneck identification in the production system. The article uses two research methods, first, the combination of a narrative and scoping literature review, and second, the logical design. Several methods for bottleneck identification are reviewed and compared, finding some being similar, and others giving new insights into the evaluated production system. A methodology for bottleneck identification is proposed. It contains several detailed methods arranged in coherent steps, which are suggested to be followed when aiming for the recognition of a production system's bottleneck. The proposed methodology is expected to be helpful in the practical TOC implementation. The presented methodology for the identification of bottlenecks in a production system is a practical tool for managers and experts dealing with TOC. However, it is still a conceptual proposal that needs to be tested empirically. The proposed methodology for bottleneck identification is an original concept based on the current literature output. It contributes to the production management theory as a practical managerial tool.