À propos de cet article

Citez

1. Afshari, A. R., Nikolić, M., Akbari, Z. (2018), “Review on project manager selection criteria and methods”, In 8th International Symposium Engineering Management and competitiveness 2018, 22-23 June, University of Novi Sad, Technical faculty Mihajlo Pupin, Zrenjanin, pp. 3-8.Search in Google Scholar

2. Al-Harbi, K. M. A. -S. (2001), “Application of the AHP in project management”, International Journal of Project Management, Vol. 19, No. 1, pp. 19-27.10.1016/S0263-7863(99)00038-1Search in Google Scholar

3. APM. (2015), APM Body of Knowledge (7th ed.), Association for Project Management, Bucks.Search in Google Scholar

4. Aretoulis, G. N., Aretouli, E. N., Angelides, D. C., Kalfakakou, G. P. (2009), “Profiling the modern project manager”, In 5th International Conference on Construction in the 21st Century Collaboration and Integration in Engineering, Management and Technology, 20-22 May, CITC-V, Istanbul, pp. 20-22.Search in Google Scholar

5. Armstrong, M. (2009), Armstrong’s Handbook of Performance Management: An Evidence-Based Guide to Delivering High Performance (4th ed.), Kogan Page Publishers, London.Search in Google Scholar

6. Balioti, V., Tzimopoulos, C., Evangelides, C. (2018), “Multi-criteria decision making using TOPSIS method under fuzzy environment”, Proceedings, Vol. 2, No. 11, Article 637.10.3390/proceedings2110637Search in Google Scholar

7. Barnes, M. (1988), “Construction project management”, International Journal of Project Management, Vol. 6, No. 2, pp. 69-79.10.1016/0263-7863(88)90028-2Search in Google Scholar

8. Baykasoğlu, A., Özbakir, L. (2007), “MEPAR-miner: multi-expression programming for classification rule mining”, European Journal of Operational Research, Vol. 183, No. 2, pp. 767-784.10.1016/j.ejor.2006.10.015Search in Google Scholar

9. Boettcher, J. A. (2008), “Ten steps to it project success”, available at: www.projectkickstart.com/downloads/IT-projectsuccess.cfm (29 February 2008)Search in Google Scholar

10. Brière, S., Proulx, D., Navaro Flores, O., Laporte, M. (2015), “Competencies of project managers in international NGOs: perceptions of practitioners”, International Journal of Project Management, Vol. 33, No. 1, pp. 116-125.10.1016/j.ijproman.2014.04.010Search in Google Scholar

11. Buble, M. (2010), Projektni menadžment (Project Management), Minerva, Dugopolje.Search in Google Scholar

12. Cassar, R., Martin, H. (2016), “How to choose a project manager under uncertainty”, In Chan, P. W., Neilson, C. J. (Eds.), 32nd Annual ARCOM Conference (Vol. 2), 5 September, Association of Researchers in Construction Management Manchester, pp. 619-628.Search in Google Scholar

13. Chen, L. S., Cheng, C. H. (2005), “Selecting IS personnel use fuzzy GDSS based on metric distance method”, European Journal of Operational Research, Vol. 160, No. 3, pp. 803-820.10.1016/j.ejor.2003.07.003Search in Google Scholar

14. Clancy, T. (2008), ”The Standish group report”, avialable at: https://www.projectsmart.co.uk/white-papers/chaos-report.pdf (20 February 2008)Search in Google Scholar

15. Cobb, M. (1995), “Unfinished voyages”, oral presentation, 6-9 November, CHAOS University, Chatham.Search in Google Scholar

16. Collins, P. (1998), “Project manager selection and development process”, In 29th Annual Project Management Institute Seminar and Symposium, 9-15 October, PMI, Long Beach, California, pp. 119-127.Search in Google Scholar

17. Crawford, L. (2000), “Profiling the competent project manager”, Project Management Institute Research Conference on Project Management Research at the Turn of the Millenium, 21-24 June, PMI, Paris, pp. 3-15.Search in Google Scholar

18. Datta, A., Bansal, V., Diaz, J., Patel. J., Reato, D., Bikson, M. (2009), “Gyri–precise head model of transcranial DC stimulation: improved spatial focality using a ring electrode versus conventional rectangular pad”, Brain Stimulation, Vol. 2, No. 4, pp. 201-207.10.1016/j.brs.2009.03.005Search in Google Scholar

19. Duckstein, L., Opricovic, S. (1980), “Multiobjective optimization in river basin development”, Water Resources Research, Vol. 16, No. 1. pp. 14-20.10.1029/WR016i001p00014Search in Google Scholar

20. Edum-Fotwe, F. T., McCaffer, R. (2000), “Developing project management competency: perspectives from the construction industry”, International Journal of Project Management, Vol. 18, No. 2, pp. 111-124.10.1016/S0263-7863(98)90075-8Search in Google Scholar

21. El-Saba, S. (2001), “The skills and career path of an effective project manager”, International Journal of Project Management, Vol. 19, No. 1, pp. 1-7.10.1016/S0263-7863(99)00034-4Search in Google Scholar

22. Faniran, O. O., Love, P., Smith, J. (2000), “Effective front-end project management a key to achieving project success in developing countries” 2nd International Conference Construction in Developing Countries: Challenges Facing the Construction Industry in Developing Countries, 15-17 November, BONCIC, Gabrone, pp. 1-9.Search in Google Scholar

23. Farahani, R. Z., Seifi, S. M., Asgari, N. (2010), “Multiple criteria facility location problems, a survey”, Applied Mathematical Modelling, Vol. 34, No. 7, pp. 1689-1709.10.1016/j.apm.2009.10.005Search in Google Scholar

24. Frank, T. (2002), The Superior Project Manager, Marcel Dekker, New York.Search in Google Scholar

25. Fraser, C. (1999), “A non-results-based effectiveness index for construction site managers”, Construction Management and Economics, Vol. 17, No. 6, pp. 789-798.10.1080/014461999371123Search in Google Scholar

26. Gonzales, R. G., Terriquez, V. (2013), “How DACA is impacting the lives of those who are now DACAmented: preliminary findings from the National UnDACAmented research project”, available at https://www.americanimmigrationcouncil.org/research/howdaca-impacting-lives-those-who-are-now-dacamented (05 January 2020)Search in Google Scholar

27. Greer, M. (1999), “Planning and managing human performance technology projects”, In Stolovitch, H. D., Keeps, E. J. (Eds.), Handbook of Human Performance Technology: Improving Individual Organizational Performance Worldwide, Pfeiff, San Francisco, pp. 96-121.Search in Google Scholar

28. Hauc, A. (2007), Projektni menadžment i projektno poslovanje (Project management and project business), M.E.P. Consult, Zagreb.Search in Google Scholar

29. Hadad, Y., Keren, B., Laslo, Z. (2013), “A decision-making support system module for project manager selection according to past performance”, International Journal of Project Management, Vol. 31, No. 4, pp. 532-541.10.1016/j.ijproman.2012.10.004Search in Google Scholar

30. Hajkowicz, S. (2009), “The evolution of Australia’s natural resource management programs: towards improved targeting and evaluation of investments”, Land Use Policy, Vol. 26, No. 2, pp. 471-478.10.1016/j.landusepol.2008.06.004Search in Google Scholar

31. Hauschildt, J., Keim, G., Medcof, J. W. (2000), “Realistic criteria for project manager selection and development”, Project Management Journal, Vol. 31, No. 3, pp. 23-32.10.1177/875697280003100304Search in Google Scholar

32. Horine, G. M. (2009), Vodič za upravljanje projektima: od početka do kraja (Project Management Guide: From Start to Finish), Dva i dva, Zagreb.Search in Google Scholar

33. Horner, A. (2010), “Andrew Horner and the fantastic, amazing, magnificent reverse job application”, available at: http://www.reversejobapplication.com (31 November 2012)Search in Google Scholar

34. Hsiao, W. -H., Chang, T. -S., Huang, M. -S., Chen. Y. C. (2011), “Selection criteria of recruitment for information systems employees: using the Analytic Hierarchy Process (AHP) Method”, African Journal of Business Management, Vol. 5, No. 15, pp. 6200-6208.Search in Google Scholar

35. Hwang, W. Y., Chen, N. S., Dung, J. J, Yang, Y. L. (2007), “Multiple representation skills and creativity effects on mathematical problem solving using a multimedia whiteboard system”, Educational Technology & Society, Vol. 10, No. 2, pp. 191-212.Search in Google Scholar

36. IPMA. (2015), “Individual Competence Baseline: For Project, Programme & Portfolio Management” (4th ed.), International Project Management Association, Amsterdam.Search in Google Scholar

37. Ivas, M. (2019), “Quality assurance of construction projects in power sector through professional project management”, 14. savjetovanje HRO CIGRÉ, 10-13 November, HRO CIGRÉ, Šibenik, pp. 1-10.Search in Google Scholar

38. Tesch, D., Jiang, J. J., Klein, G. (2003), “The impact of information system personnel skill discrepancies on stakeholder satisfaction”, Decision Sciences, Vol. 34, No. 1, pp. 107-129.10.1111/1540-5915.02371Search in Google Scholar

39. Karbassi, A., Nollet, M. J. (2008), “Development of an index assignment procedure compatible with the regional seismicity in the province of Quebec for the rapid visual screening of existing buildings”, Canadian Journal of Civil Engineering, Vol. 35, No. 9, pp. 925-937.10.1139/L08-041Search in Google Scholar

40. Korres, G., Goutsos, S., Kostouros, J. (2003), Principles of Project Organization and Management (Vol. 2), Greek Open University, School of Exact Sciences and Technology, Patra.Search in Google Scholar

41. Kosijer, M., Ivić, M., Marković, M., Belošević, I. (2012), “Multicriteria decision-making in railway route planning and design”, Građevinar, Vol. 64, No. 3, pp. 195-205.10.14256/JCE.645.2011Search in Google Scholar

42. Kwak, Y. H., Anbari. F. T. (2009), “Analyzing project management research: perspectives from top management journals”, International Journal of Project Management, Vol. 27, No. 5, pp. 435-446.10.1016/j.ijproman.2008.08.004Search in Google Scholar

43. Lau, K. M., Shen, S. S. P., Kim, K. -M., Wang, H. (2006), “A multimodel study of the twentieth century simulations of Sahel drought from the 1970s to 1990s”, Journal of Geophysical Research Atoospheres, Vol. 111, No. D7, pp. 1-9.10.1029/2005JD006281Search in Google Scholar

44. Loo, R. (2003), “Project management: a core competency for professional nurses and nurse managers”, Journal for Nurses in Staff Development, Vol. 19, No. 4, pp. 187-193.10.1097/00124645-200307000-00007Search in Google Scholar

45. Macan, T. (2009), “The employment interview: a review of current studies and directions for future research”, Human Resource Management Review, Vol. 19, No. 3, pp. 203-218.10.1016/j.hrmr.2009.03.006Search in Google Scholar

46. Madter, N., Bower, D. A., Aritua, B. (2012), “Projects and personalities: a framework for individualising project management career development in the construction industry”, International Journal of Project Management, Vol. 30, No. 3, pp. 273-281.10.1016/j.ijproman.2011.09.001Search in Google Scholar

47. Meredith, J., Mantel, S. (2003), Project Management – A Managerial Approach (5th ed.), John Wiley & Sons, Haboken.Search in Google Scholar

48. Morris, P., Hough, G. (1987), The Anatomy of Major Projects: A Study of the Reality of Project Management, John Wiley & Sons, Haboken.Search in Google Scholar

49. Morris, P., Pinto, J. K. (2007), The Wiley Guide to Project Organization and Project Management Competencies, John Wiley and Sons, Haboken.Search in Google Scholar

50. Muchinsky, P. (1979), “The use of reference reports in personnel selection: a review and evaluation”, Journal of Occupational Psychology, Vol. 52, No. 4, pp. 287-297.10.1111/j.2044-8325.1979.tb00463.xSearch in Google Scholar

51. Muller, R., Turner, J. (2007), “The influence of project managers on project success criteria and project success by type of project”, European Management Journal. Vol. 25, No. 4, pp. 298-309.10.1016/j.emj.2007.06.003Search in Google Scholar

52. Nahod, M. M. (2014), “Utjecaj kompetentnog upravljanja promjenama na uspješnost građevinskih projekata” (The impact of competent change management on the success of construction projects), Doctoral dissertation, University of Zagreb, Faculty of architecture, Zagreb.Search in Google Scholar

53. Odusami, K. T. (2002), “Perceptions of construction professionals concerning important skills of effective project leaders”, Journal of Management in Engineering, Vol. 18, No. 2, pp. 61-79.10.1061/(ASCE)0742-597X(2002)18:2(61)Search in Google Scholar

54. Omazić, A. M., Baljkas, S. (2005), “Projektni menadžment” (Project Management), Sveučilište u Zagrebu, Ekonomski fakultet, Zagreb.Search in Google Scholar

55. Omidvar, G., Jaryani, F., Zafarghandi, S., Nasab, S., Jam Shidi, J. (2011), “Importance degree of technical competencies based on it project managers’ perspective”, 2nd International Conference on Education and Management Technology, 19-21 August, IACSIT Press, Singapore, pp. 150-153.Search in Google Scholar

56. Pant, I., Baroudi, B. (2007), “Project management education: the human skills imperative”, International Project Management, Vol. 26, No. 2, pp.124-128.10.1016/j.ijproman.2007.05.010Search in Google Scholar

57. Papke-Shields, K., Beise, C., Quan, J. (2010), “Do project managers practice what they preach, and does it matter to project success?”, International Journal of Project Management, Vol. 28, No. 7, pp. 650-662.10.1016/j.ijproman.2009.11.002Search in Google Scholar

58. PMI. (2007), A Guide to the Project Management Body of Knowledge Newtown, Project Management Institute, Newtown Square.Search in Google Scholar

59. Radujković, M., Car-Pušić, D., Ostojić Škomrlj, N., Vukomanović, M., Burcar Dunović, I., Delić, D., Meštrović, H. (2012), Planiranje i kontrola projekata (Project Planning and Control), Sveučilište u Zagrebu, Građevinski fakultet, Zagreb.Search in Google Scholar

60. Radujković, M. (2000), “Current profile of project manager in transition economy”, SENET Project Management Review, Vol. 1, No. 1, pp.12-17.Search in Google Scholar

61. Radujković, M., Vukomanović, M., Bezak, S. (2010), “Approaches to construction project managers”, Građevinar, Vol. 62, No. 7, pp. 623-631.Search in Google Scholar

62. Rashid, T., Faizi, S., Zafar, S. (2018), “Distance based entropy measure of interval-valued intuitionistic fuzzy sets and its application in multicriteria decision making”, Advances in Fuzzy Systems, Vol. 2018, Article 3637897.10.1155/2018/3637897Search in Google Scholar

63. Rashidi, A., Jazebi, F., Brilakis, I. (2011), “Neurofuzzy genetic system for selection of construction project managers”, Journal of Construction Engineering and Management, Vol. 137, No. 1, pp. 17-29.10.1061/(ASCE)CO.1943-7862.0000200Search in Google Scholar

64. Rees, D., Turner, R., Tampoe, M. (1996), “On being a manager and leader”, In Turner, J. R., Grude, K., Thurloway, L. (Eds.), The Project Manager as Change Agent, McGraw-Hill, Maidenhead, pp. 99-115.Search in Google Scholar

65. Saaty, T. L. (1980), The Analytic Hierarchy Process, McGraw-Hill, New York.10.21236/ADA214804Search in Google Scholar

66. Saaty, T. L., Vargas, L. G. (2006), Decision Making with the Analytic Network Process: Economic, Political, Social and Technological Applications with Benefits, Opportunities, Costs and Risks, Springer, Pittsburg.Search in Google Scholar

67. Saaty, T. L. (2008), “Decision making with the analytic hierarchy process”, International Journal of Services Sciences, Vol. 1, No. 1, pp. 83-98.10.1504/IJSSCI.2008.017590Search in Google Scholar

68. Sadatrasool, M., Bozorgi-Amirib, A., Yousefi-Babadi, A. (2016), “Project manager selection based on project manager competency model: PCA–MCDM Approach”, Journal of Project Management, Vol. 1, pp. 7-20.10.5267/j.jpm.2017.1.004Search in Google Scholar

69. Šarka, V., Zavadskas, E. K., Ustinovičius, L, Šarkiene, E., Ignatavičius, Č. (2008), ”System of project multicriteria decision synthesis in construction”, Ukio Technologinis ir Ekonominis Vystymas, Vol. 14, No. 4, pp. 546-565.10.3846/1392-8619.2008.14.546-565Search in Google Scholar

70. Sivilevicius, H., Zavadskas, E. K., Turskis, Z. (2008), “Multi-attribute assessment of the asphalt mixing plants”, in Zavadskas, E., Kaklauskas, A., Skibniewski. M. J. (Eds.), 25th International Symposium on Automation and Robotics in Construction, 26-29 June, Technica, Vilnius, pp. 717-729.10.3846/isarc.20080626.650Search in Google Scholar

71. Sliogeriene, J., Kaklauskas, A., Zavadskas, E. K., Bivainis, J., Seniut, M. (2009), “Environment factors of energy companies and their effect on value: analysis model and applied method”, Technological and Economic Development of Economy, Vol. 15, No. 3, pp. 490-521.10.3846/1392-8619.2009.15.490-521Search in Google Scholar

72. Smith, J. P. (2013a), “Trust-building in the construction project delivery process: a relational look ahead tool for managing trust”, Doctoral dissertation, Texas A&M University.Search in Google Scholar

73. Smith, M. (2013b), “Project manager selection: a better way forward”, Doctoral dissertation, Information Technology and Electrical Engineering University College, The University of New South Wales at the Australian Defence Force Academy, Canberra, Australia.Search in Google Scholar

74. Stewart, T. (1999), “Project manager: no. 1 career of the future”, Fortune Magazine, Vol. 8.Search in Google Scholar

75. Subramanian, N., Ramanathan, R. (2012), “A review of applications of analytic hierarchy process in operations management”, International Journal of Production Economics, Vol.138, No. 2, pp. 215–241.10.1016/j.ijpe.2012.03.036Search in Google Scholar

76. Swanson, A. (1964), “Project manager selection: the decision process”, Master thesis, Massachusetts Institute of Technology.Search in Google Scholar

77. Tainter, J. A. (2007), “Kolaps kompleksnih društava” (The Collapse of Complex Societies), Jesenski i Turk, Zagreb.Search in Google Scholar

78. Takey, S. M., Carvalho, M. M. (2015), “Competency mapping in project management: an action research study in an engineering company”, International Journal of Project Management, Vol. 33, No. 4, pp. 784-796.10.1016/j.ijproman.2014.10.013Search in Google Scholar

79. Tohidi, H., Jabbari, M. M. (2012), “Role of human aspects in project management”, Procedia—Social and Behavioral Sciences, Vol. 31, pp. 837-840.10.1016/j.sbspro.2011.12.152Search in Google Scholar

80. Tudela, A., Akiki, N., Cisternas, R. (2006), “Comparing the output of cost benefit and multi-criteria analysis: an application to urban transport investments”, Transportation Research Part A: Policy and Practice, Vol. 40, No. 5, pp. 414-423.10.1016/j.tra.2005.08.002Search in Google Scholar

81. Tupenaite, L., Zavadskas, E. K, Kaklauskas, A., Turskis, Z., Seniut, M. (2010), “Multiple criteria assessment of alternatives for built and human environment renovation”, Journal of Civil Engineering and Management, Vol. 16, No. 2, pp. 257-266.10.3846/jcem.2010.30Search in Google Scholar

82. Uhlir, Ž. (2011), “Utjecaj procesa certificiranja projektnih menadžera na razvitak projektnog menadžmenta u Republici Hrvatskoj” (The impact of the project manager certification process on the development of project management in the Republic of Croatia), Master thesis, Faculty of Economics, Zagreb.Search in Google Scholar

83. Varajão, J. J., Cruz-Cunha, M. M. (2013), “Using AHP and the IPMA Competence Baseline in the project managers selection process”, International Journal of Production Research, Vol. 51, No. 11, pp. 3342-3354.10.1080/00207543.2013.774473Search in Google Scholar

84. Wang, E., Chou, H. W., Jiang, J. (2005), “The impacts of charismatic leadership style on team cohesiveness and overall performance during ERP implementation”, International Journal of Project Management, Vol. 23, No. 3, pp.173-180.10.1016/j.ijproman.2004.09.003Search in Google Scholar

85. Wen-Yau, L. (2003), “The analytic hierarchy process in project evaluation: an R&D case study in Taiwan”, Benchmarking: An International Journal, Vol. 10, No. 5, pp. 445-456.10.1108/14635770310495492Search in Google Scholar

86. Wolff, S. (2005), ECI Technical Manual, McClelland Center for Research and Innovation, Philadelphia.Search in Google Scholar

87. Xing, B., Zhang, A. (2006), “Application of fuzzy analytical hierarchy process in selecting a project manager”, In Hua, L., Yu-Hong, Y., Peng, Z. (Eds.), 13th International Conference Management Science and Engineering, 5-7 October, IEEE, Lille, pp. 1417-1421.10.1109/ICMSE.2006.314252Search in Google Scholar

88. Yang, I. T., Chou, J. -S. (2011), “Multiobjective optimization for manpower assignment in consulting engineering firms”, Applied Soft Computing, Vol 11, No. 1, pp.1183-1190.10.1016/j.asoc.2010.02.016Search in Google Scholar

89. Yoon, K. P., Hwang, C. L. (1995), Multiple Atribute Decision Making: An Introduction” (Vol. 104), Sage Publications, Thousand Oaks.Search in Google Scholar

90. Zavadskas, E. K., Kaklauskas, A., Turskis, Z., Tamošaitienė, J. (2008), “Selection of the effective devellig house walls by applying attributes values determined at intervals”, Journal of Civil Engineering and Management, Vol. 14, No. 2, pp. 85-93.10.3846/1392-3730.2008.14.3Search in Google Scholar

91. Zekić, Z. (2010), “Projektni menadžment” (Project Management), Ekonomski fakultet, Rijeka.Search in Google Scholar