[
[1] ENTSO-E, ICS Final Report/Main Report, 15.07.2021
]Search in Google Scholar
[
[2] PSS/E Documentation, SIEMENS – PTI, November 2021, Version 35.3.2
]Search in Google Scholar
[
[3] M.G Ippolito, R. Muska, G.Zizzo: Analysis and Simulations of the Primary Frequency Control during a System Split in Continental Europe Power System, Energies 2021, 14, 1456. https://doi.org/10.3390/en1405145610.3390/en14051456
]Search in Google Scholar
[
[4] NOSBiH, Detailed report „Separation of the power system of continental Europe 08.01.2021. and impact on the work of Power System of BiH”, Sarajevo, March 2021
]Search in Google Scholar
[
[5] SIPROTEC, SIGRA V4.57 Manual, SIGRA Product Information, SIEMENS, Edition 02.2011
]Search in Google Scholar
[
[6] REL.316*4 Numerical Protection and Control Devices, Operating Instruccions, ABB Switzerland Ltd, Edition October 2004
]Search in Google Scholar
[
[7] SIPROTEC 7UM85 Generator Protection – Manual, SIENMENS, Edition 11, 2020
]Search in Google Scholar
[
[8] SIPROTEC 7UM622 Multifunctional Machine Protection – Manual, SIENMENS, Edition: April 2005
]Search in Google Scholar