À propos de cet article
Publié en ligne: 01 nov. 2022
Pages: 46 - 52
Reçu: 01 oct. 2020
Accepté: 01 nov. 2020
DOI: https://doi.org/10.2478/bhee-2020-0012
Mots clés
© 2020 Panagiotis Giannakaris et al., published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.
In this work we present the design of a PV plant comprising storage for the transition of the fossil fuelled power plant of a non-interconnected Greek Island to a hybrid one with high RES penetration. Simulations are performed using the OpenDSS software. The proposed design offers 58.1% reduction in both fuel consumption and CO2 emissions for the first year of operation, which reduces to 44.2% and 42.2% after 20 years.